The impact of traffic on the Catherine Hill Bay area.

Slides:



Advertisements
Similar presentations
Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.
Advertisements

Lec 25: Ch2.(T&LD): Site planning
Town of Dryden, NY :: Hamlet of Varna – Community Development Plan Public Workshop Project Scoping/Issues Identification December 1, 2010.
Transport Assessment – what it is and why we do it Tom Rye, Professor of Transport Policy and Mobility Management Transport Research Institute Edinburgh.
Highways and Highway Components
This topic comes up frequently
Harold Park Tram Sheds Development
Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
Trip Generation at the Site Level. Norman W. Garrick Trip Rate Analysis Typically used to estimate trips from sites rather than for whole cities or region.
Presentation to Suburban Councillors February 2015.
Byron Becnel LA DOTD June 16, Microscopic simulation models simulate the movement of individual vehicles on roads It is used to assess the traffic.
TBG MKE West Waukesha Bypass Study Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011 Community Sensitive Solutions.
Economic Viability of Feeder Service for Bridgeport Presented to: SNAME Annual Meeting Management & Transportation Associates, Inc. October 25, 2001.
London's superhighways and the 'Go Dutch' Campaign Gerhard Weiss Cycling Development Officer London Cycling Campaign Over 11,500 paid up members About.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
1.THE IMPORTANCE OF CATHERINE HILL BAY - HISTORY Brief historical development Catherine Hill Bay wreck 21 June Mine operations commence.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Multi-Modal Concurrency PSRC TRAC-UW Depart of Urban Design and Planning Evans School.
Transportation System Issues and Challenges
Lec 28: Ch3.(T&LD): Traffic Analysis – Traffic assignment Learn how to assign generated and distributed trips to the street system approaching the site.
Lec 24: Ch1.(T&LD): Urban transportation planning vs. Site planning Review the transportation-land use cycle (Read examples in Ch.1 & compare the development.
Seminar 23rd November 2001 Other Policies: Demand Management & Highway Investment Professor Marcial Echenique.
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
Trip Generation for Street and Highways Lecture 14 CE 4720 Norman Garrick.
Design for Health May 2007 Preliminary Checklist Cairssa Schively Design for Health.
Introduction Nablus is the largest city in the West Bank after Jerusalem. 150,000 inhabitants live in Nablus. Nablus has the largest university in the.
Chapter 1: Highway Functions
21st. Annual International Emme Users Conference, Toronto, CA, October 2007 Jiri Dufek Transport Research Centre Lísenská 33a Brno Czech.
Transportation Concurrency The provision of “adequate transportation facilities” Integrating land use and transportation.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
Public Hearing PROPOSED HIGHWAY IMPROVEMENTS I-95 DEFENSE ACCESS ROADS RAMPS TO THE ENGINEER PROVING GROUND Fort Belvoir, Virginia AUGUST 20, 2008.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Is Transportation Sustainable?. Objectives By the end of this unit, students will be able to: 1.Examine and prioritize transportation project impacts.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Introduction Session 01 Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Challenges in Using Paramics in a Secondary Plan Study – Case Study of Downsview, Toronto Paramics Users Group Meeting October 5, 2009.
Things to consider for regional planning…. Corridor Preservation Corridor preservation is a strategy to assure that the network of highways, roads, and.
PARKING STRATEGY POLICY DEVELOPMENT Transportation & Asset Management Environment & Regeneration Scrutiny Committee 28 February 2007.
WELCOME! Public Informational Meeting December 1, pm Town of New Hartford Southern Area – Urban Design Plan & GEIS Preliminary Impacts.
Managing the Local Government Transport Infrastructure Gap Warren Sharpe DIRECTOR INFRASTRUCTURE SERVICES SEATS Meeting - 18 May 2012.
Traffic Flow Parameters Surface Street Application.
State Planning Policy 5.4 Noise and Freight Considerations in Land Use Planning Evan Jones and Kareena May August 2014.
A96 Fochabers Bypass Moray Council 15 August 2007.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
21st October 2015 Stillorgan Village Area Movement Framework Plan PUBLIC CONSULTATION INFORMATION PERIOD DOCUMENT.
Secondary & Cumulative Effects Analysis Training Program Module 2: How to Establish the SCEA Geographical Boundary.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
Rookery South Resource Recovery Facility (RRF) Community Liaison Panel Transport Presentation – 14 th December 2009 John Hopkins, Peter Brett Associates.
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
SCATS Congestion Improvement Program. The Scope of the SCATS Congestion Improvement Program.
PART OF THE PRESENTATION OF THE CATHERINE HILL BAY PROGRESS ASSOCIATION PUBLIC ACCESS.
Welcome to…. The Boat Ramp Information Open Day Thank you for coming along. We are here to answer your questions.
Connecting South Dakota and the Nation Access Management Training Brooke White, Access Management Engineer.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
An Assessment Of Traffic Impacts Upon Kensington And Parts Of Kingsford 13/07/09.
Land west of Grace Crescent, Hardwick Presentation to Hardwick Parish Council 23/08/2016.
Kensington and parts of west Kinsgford PAMP Workshop: 22 nd June 2010.
Scenic Highway – Public Meeting
Downtown Valdosta Truck Traffic Mitigation Study
RPS Modeling Results Second Round
Gateway Specific Plan Concepts
Technical and Public Advisory Committee Meeting #3
Fishermans Bend Draft Framework Transport Recommendations
Land Use Planning - Goals
3 November 2017 Fraserburgh and Peterhead to Aberdeen Strategic Transport Study: STAG Part 1 Plus Bob Nicol: Project Director David Murtagh: Project Manager.
Histon Road LLF Resolutions and Programme
Presentation transcript:

The impact of traffic on the Catherine Hill Bay area.

Conduct a comprehensive transport assessment of the whole Catherine Hill Bay area. While both developments in isolation would create their own traffic impacts, collectively the impact would be magnified and would need different infrastructure and mitigation measures.

A cumulative impact assessment of additional traffic that will be attracted to Catherine Hill Bay from nearby areas Likely traffic attractors include: RoseCorp’s shopping precinct within its proposed development The southern end of Catherine Hill Bay beach The northern end of Catherine Hill Bay beach.

The treatment for access into the Catherine Hill Bay area has not been agreed with the RTA. Montefiore Street would need to be upgraded to a suitable collector road standard. Downgrade the Flowers Drive/Pacific Highway intersection by restricting traffic movements, perhaps by creating a “left in/left-out” arrangement.

There is real uncertainty about RoseCorp’s proposed access road running south of Montefiore Street to Moonee Beach. Where will an access road be located if National Parks and Wildlife land cannot be used? Why is an access road not being built through RoseCorp land? If an access road is not provided to Moonee Beach, there will be increased traffic impacts on the Catherine Hill Bay beach area.

There must be suitable traffic mitigation measures. The future road network must protect the existing villages with a network that bypasses these villages. The section of Flowers Road between the Middle Camp and Catherine Hill Bay would become an alternative local road route.

The proposed developments would have significant impact on the local road environmental capacity. For a quiet village area with very low traffic volumes, environmental capacity expectations are far less than for a suburban Sydney street.

An average trip generation rate of 0.65 vehicle trips per dwelling was used. However the RTA guideline rate is 0.85 vehicle trips per dwelling rate = 390 vehicles per hour rate = 510 vehicles per hour.

The MWT traffic report is unclear as to what effects additional parking would have on traffic generation to the area. 92 public parking spaces proposed in the Hamlet 1 development. Plus on-street parking in the Hamlet 1 and 2 developments. Plus additional public parking for the remaining Hamlet developments. Plus additional public parking for the Coal and Allied development.

Beach parking and access at both ends of the beach has not been suitably addressed. Parking space numbers are unclear. The effect that additional parking will have has not been addressed.

Street frontage setbacks are very narrow in the village areas. When traffic volumes increase, this will increase the impact on road safety, amenity and noise, especially if the road network does not bypass these sensitive areas.

There is uncertainty about the public transport services that are proposed to cater for the new developments.

In summary No cumulative traffic impact assessment undertaken Impact of additional traffic has not been considered Road network and access points are not resolved Focus on higher level road network at the expense of local road network Use of a lower trip generation rate must be substantiated Extent and impact of public parking has not been fully addressed Increased traffic is likely to significantly increase road safety, amenity and noise impacts