Proposed CMSC Amendments - Imports & Exports Intertie Trading Sub-committee November 24, 2003 PUBLIC.

Slides:



Advertisements
Similar presentations
Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff.
Advertisements

2000, Independent Electricity Market Operator All Rights Reserved 1.
1 MR (“Day-Ahead Reliability Guarantees”) – A Correction IESO Technical Panel Meeting Tuesday, December 13 th 2005 IESOTP 175-5L.
Congestion Management Settlement Credits December, 2002.
IJT Transaction Timelines and Scheduling – NISL and CMSC.
Intertie Restoration Update September 15, Intertie Restoration Recommendation Paper Expected to be released by the end of September Will be released.
Discussion of Inter-RTO Seams Issues Presented by: Midwest ISO and NYISO Independent Market Monitor David B. Patton, Ph.D. Potomac Economics October 7,
Highlights of the 2004 State of the Market Report New York Electricity Markets David B. Patton, Ph.D. Potomac Economics Independent Market Advisor May.
Demand Response in New York State Northwest Power and Conservation Council DR workshop February 24, 2006.
Ramping and CMSC (Congestion Management Settlement Credit) payments.
MPID 223 (Failure to Follow Synchronising Instruction) JGCRP 12 th November 2014 (Anne Trotter)
Load Shed Service for Import Information Session Market Services April 17, 2014.
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
IMO Market Evolution Program Drew Phillips Market Evolution Program
EAEI Department  Electricity Markets and Policy Group Congestion Measures for Organized Electricity Markets in the U.S. Emily Fisher Lawrence Berkeley.
Valuing Economic Benefits from Transmission Planning ERCOT System Planning March 22, 2006.
Review of Bulk Energy Storage in SEM Gaelectric Energy Storage T&SC Modification Working Group 6 th September 2012 Mullany Engineering Consultancy Energy,
Seams Issues Raymond DePillo Vice-President – Power Operations and Asset Management PSEG Energy Resources & Trade LLC October 7, OPSI Annual.
1 Adjusting the “Dispatch Instructions” to the Defined Metering Point (DMP). “Functional Deferral 6 (FD-06)” Market Operations Standing Committee (MOSC)
NGEIR Technical Conference Presentation May 16, 2006.
December 2, 2011 QMWG Summary of Potential Issues with NPRR385 Price Floor ERCOT.
CMSC Rules Changes under Consideration Market Operations Standing Committee December 3, 2003 PUBLIC.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Public Market Surveillance Panel Consultation on CMSC Issues Related to Constrained off Payments to Generators and Imports Market Operations Standing Committee.
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
The Ontario Electricity Market 1 Year in Richard Penn Mgr - Market Assessment The IMO Richard Penn Mgr - Market Assessment The IMO.
Day Ahead Market Working Group April 14, Agenda Discussion of SMD-style DAM review questions posed by the DAM WG and Coral regarding the SMD-
Market Evolution Program Day Ahead Market Project How the DSO Calculates Nodal Prices DAMWG October 20, 2003.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
Treatment of Intertie Failures Intertie Trading Subcommittee November 24, 2003.
Hour Ahead Dispatchable Loads Applicable Updates to Procedures Presentation to the Market Operations Standing Committee April 23, 2003
Market Operations Standing Committee of the IMO Market Operations Standing Committee April 23, 2003.
Nodal Settlement Delta Calculations and Statements – 7/11/06 Workshop  Objective: Describe design concepts of nodal settlement delta calculations and.
Addressing Constrained-Off Payments for Intertie Transactions Darren Matsugu, Supervisor - Markets, IESO Presentation to Technical Panel: June 2, 2015.
Demand Response as Capacity in New York National Association of Regulatory Utility Commissioners Winter Committee Meetings Washington, DC February 17,
Intertie Transactions Failure Working Group Tuesday April 19, 2005.
1 IMM Pricing Concerns with PFR and FFR Proposed pricing structure provides incentive for FFR to offer at less than cost. Dual clearing price pricing structure.
FURTHER INFORMATION ON MISO FTR AUCTIONS For SPP RSC Discussion October 6, 2010.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
CMWG Update WMS September 2015 Meeting. CRR Balancing Account Fund Discussion The CRR Balancing Account fund appears to be working as expected The cap.
Sep 22, 2003Market Operations Standing Committee of the IMO1 Change Management: Market Rules Update John MacKenzie, IMO.
Unit-Specific Bid Limits based on Modified Generic Cost.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
Jun 18, 2003Market Operations Standing Committee of the IMO1 Market Pricing Integrated Proposal: Consequences, Trade-Offs & Implementation.
Transmission Rights. The Markets EnergyForwardTransmissionRightsAncillaryServices Must Run Contracts Energy OperatingReserveCapacityReserve Procurement.
Revisions to the Information Confidentiality Catalogue Presentation to the Market Operations Standing Committee April 23, 2003.
Market Credit Working Group Update to WMS Wed. Nov 18, 2009.
Market Working Group Update Presentation to CAWG March 29, 2011 Jim Sanderson, KCC.
Market Operations Standing Committee MOSC October 19, 2005 Pat Doran.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
MOSC Meeting Operations Market Manual updates October 22, 2003 Presented by:Ron Falsetti Steve Cooper.
Recommendation on DACP SE-22 Presentation to the SAC Darren Finkbeiner, Manager – Market Entry and Analysis November 1, 2006.
Capacity Forecast Report Fall Update Sean Chang Market Analysis and Design Suresh Pabbisetty CQF, ERP, CSQA Credit CWG/MCWG December 16, 2015 ERCOT Public.
Battery Storage Systems: A Backward Induction Approach with Multiple Daily Discharging Opportunities Joohyun Cho Andrew Kleit The Pennsylvania State University.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Jul 23, 2003Market Operations Standing Committee of the IMO1 Market Pricing Issues Update John MacKenzie.
Guidelines on Transmission Tarification ERGEG Public Hearing 30. June 2005.
1 ECONOMIC TRANSMISSION PLANNING Wholesale Market Subcommittee March 22, 2006 CMWG Proposal #1.
3 Dec 2003Market Operations Standing Committee1 Change Management: Market Rules Update John MacKenzie.
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Settlement Update Austin Rosel ERCOT October 11, 2017.
Allegheny Power Residential Demand Response Program
Review of Abnormal MCPEs
Further Information on MISO FTR Auctions
Use of Technical Offer Data in Instruction Profiling / QBOA Version 2
MOD_05_19_V2 Amendment to Uninstructed Imbalance Charge (CUNIMB) to correct for negative price scenarios 11th April 2019.
Market Pricing Initiatives Update September 9th, 2003
Market Pricing Issues: Update
Presentation transcript:

Proposed CMSC Amendments - Imports & Exports Intertie Trading Sub-committee November 24, 2003 PUBLIC

Proposed Rule Amendments Background - MSP consultation Negative Price Offers for Imports Constrained Off Imports / Exports

Background - MSP Consultation Longstanding MSP concern about constrained-off payments Consultation began with discussion paper, in February 2003 MSP report presented to IMO Board on July 3 One conclusion and six recommendations

Summary of MSP Recommendations Three CMSC related recommendations –Negative offers should not be used to calculate constrained-off payments. –Imports that cannot be scheduled should be removed from stack so they do not receive CMSC payments. –Self-induced constrained-off payments to generators or loads should not be made or should be fully recovered. Other recommendations included working groups –to look at the Niagara 25 Hz sub-system –to look at transmission planning issues in Ontario

Endorsements from Board The IMO Board endorsed the recommendations –authorized IMO to take actions necessary to implement them. At the same time Board approved an Urgent Rule amendment –related to negative offer prices for generators Other rules have been brought to the Technical Panel

Negative Price Offers for Imports Issue - Potentially large CMSC without efficiency rationale (e.g.) If 50 MW constrained off at -$2000 offer & zonal price $100 CMSC = [50 * 100 -(-$2000)] = $105,000 per hour. –Compared with 50 * $100 = $5000 per hour if offer were successfully scheduled. Rationale for Recommendation: –If payment of zonal price is sufficient for producing energy, it should be sufficient for not producing. Large negative prices are not indicative of costs incurred

Negative Price Offers - Proposal Proposed rule to limit CMSC payments to imports –when offer prices are below zero. CMSC calculated assuming a lower price limit –limit is zero $/MWh unless zonal price is less than zero, then limit is zonal price –for fairness / symmetry, applies to positive and negative CMSC, constrained on and constrained off situations Interim application: after-the-fact adjustment –for subset: positive CMSC, > 1 MW constrained off identical to urgent rule applied to generators

Negative Price Offers - Examples Price $/MWh 0 Zonal Price Offer Price Proposed CMSC Applied Limit Case 1: Zonal Price > 0 Generic Case: Import Constrained off from 50 MW (MS) to 0 MW Proposed CMSC not paid

Negative Price Offers - Examples Zonal Price Zonal Price = Applied limit Proposed CMSC = $0 Generic Case: Import Constrained off from 50 MW (MS) to 0 MW Price $/MWh Case 2 0 Case 2: Zonal Price < 0 Applied Limit CMSC not paid

Negative Price Offers - Examples Generic Case: Import Constrained off from 50 MW (MS) to 0 MW Offer Price CMSC < 0 No Change Potential Limit, below offer; no change IOG will be positive IOG + CMSC ~ zero Price $/MWh 0 Case 3: Zonal Price < Offer Price < 0

Constrained Off Imports / Exports - Current Procedure After 2 hour ahead IMO pre-dispatch –IMO notifies NYISO of successful constrained schedule imports and exports NYISO applies these as upper limits –in their hour ahead market. Going into 1 hour ahead IMO pre-dispatch –IMO applies limit for the constrained run only –allows the unconstrained market schedule to float Could be further adjustments –for failures during checkout or new TLRs

Proposed Limits on Schedules Proposed rules to recognize such limits –generic: possible changes with New York or others Planned implementation for New York –CS 1  CS 2 [ CS = constrained predispatch schedule] 2 hr ahead constrained pre-dispatch is upper limit on 1 hour ahead (current procedure) –MS 1  max (MS 2, CS 2 ) [ MS = predispatch market schedule] 1 hour ahead unconstrained market schedule limited –2 hour ahead constrained value is the physical limit –a larger 2 hour ahead MS implies schedule was being constrained off (MS >CS) »CMSC payment deserved since this is part of congestion management

Limits on Schedules with NYISO - Examples

Implications of Scheduling Limits Market Schedules may change (be lower) –constrained schedules not affected CMSC can be smaller quantities (positive or negative) –depending on circumstances –may be corresponding IOG reductions MCP in any interval can increase, decrease or remain unchanged depending on –whether import or export, –whether replaced by another intertie transaction