COST APPORTIONMENT PROJECT R880 DEVELOPMENT OF MIRDIF INTERCHANGE RTA PREPARED FOR: DUBAI ROADS AND TRANSPORT AUTHORITY.

Slides:



Advertisements
Similar presentations
1 Prepared by THE MARKETING SOURCE, INC. A service of Hampton Roads Transit Hampton Area Transportation Needs Assessment Study October 2001.
Advertisements

Watlington Traffic Study TPP Presentation 24/11/2014.
French cities’ urban freight surveys 1 st Scientific and Technical Workshop Bologna 05/11/2013 Presented by: Adrien Beziat, PhD, Paris, France.
Site Location Site Bus Stop Footbridge 400, 800, 1,200 and 1,600 Metre Walk Distance Primary Shopping Areas
Junction Modelling in a Strategic Transport Model Wee Liang Lim Henry Le Land Transport Authority, Singapore.
Sequential Demand Forecasting Models CTC-340. Travel Behavior 1. Decision to travel for a given purpose –People don’t travel without reason 2. The choice.
CE 2710 Transportation Engineering
Other Design Consideration TS 4447: Highway Geometric Design.
A network is shown, with a flow f. v u 6,2 2,2 4,1 5,3 2,1 3,2 5,1 4,1 3,3 Is f a maximum flow? (a) Yes (b) No (c) I have absolutely no idea a b c d.
Ewan Anderson, Fore Consulting Limited.  Two examples of recent projects:  Harlow Grange, Harrogate (124 dwellings).  Clifton Gate, York (3,400 dwellings).
K.O.R.E. Enterprises Workshop Urban Transportation Systems 10/15/08.
Paul Roberts – TIF Technical Manager Presentation to the TPS – 3 June 2009.
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
Trip Generation for Street and Highways Lecture 14 CE 4720 Norman Garrick.
COMMUNITIES-GOVERNMENT-BUSINESSES.  LAND-USE PLANNING: determines where people live, the locations of businesses, where land will be protected & location.
From EMME to DYNAMEQ in the city of MALMÖ. THE COMPANY Founded in early 2011 Currently located in Stockholm, Gothenburg and Malmö Small company (currently.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Tshwane Line 1 Traffic Simulation Results October 2012.
Transportation Planning, Transportation Demand Analysis Land Use-Transportation Interaction Transportation Planning Framework Transportation Demand Analysis.
The impact of traffic on the Catherine Hill Bay area.
Company LOGO Traffic Impact Study Case: Al-Irsal Center Project in Al-Bireh City Under the Supervision of: Pro.Sameer A. Abu-Eisheh Prepared by: Mohammad.
Economics of Congestion Jagadish Guria Presentation to the the 8th Annual New Zealand Transport Summit 25 February 2008.
Challenges in Using Paramics in a Secondary Plan Study – Case Study of Downsview, Toronto Paramics Users Group Meeting October 5, 2009.
The Stockholm trials – Emme/2 as a tool for designing a congestion charges system 1.The trials and the congestion charges system 2.Observed effects 3.Transportation.
1 Methods to Assess Land Use and Transportation Balance By Carlos A. Alba May 2007.
Presentation to Traffic Working Group February 6, 2014.
Lec 27: Ch3.(T&LD): Traffic Analysis – Directional distribution of site traffic Notice the difference in the trip distribution process between urban transportation.
Premium Transit District 4, Office of Modal Development Making the Connection.
Location of a Business Customers Labour Road Links Competition Personal factors Suppliers Government incentives Premises/land.
Public Health, Transportation, and the Built Environment: Benefits and Costs Marlon G. Boarnet Professor and Chair, Department of Planning, Policy, and.
US Route 33 Access Management Study Purpose- Determine feasibility of converting US 33 from Hamilton Road in Franklin County to Carroll in Fairfield County.
Part two Presentation and analysis of data High level presentation made easy!
Fehr & Peers | December 13 th, 2011 Traffic Access and Circulation Analysis Pinole Valley High School Reconstruction.
Dubai By: Peter Bianchin.
Fehr & Peers | March 13 th, 2012 Traffic Access and Circulation Analysis Pinole Valley High School Reconstruction.
Problem 6: Route 146 Arterial Study We’re going to look at 7 intersections simultaneously: the Shenendehowa Campus entrance, Moe Road, Maxwell Drive, Clifton.
A stop sign is a traffic sign that stands for coming to a complete stop at an intersection or end of the road.
Manual Distribution. Trip Distribution/Assignment Analyzing where trips come from and go to in relation to development Analyzing where trips come from.
Transportation System Comments Santolina Level ‘A’ Master Plan.
Application of Three Types of Multi- Point Assignments Yanping Zhang Durham-Chapel Hill-Carrboro MPO/City of Durham Soon Chung North Carolina DOT Gnani.
Measurements of Terrifying Over flights Noise in Mirdi District near Dubai International Airport Rizeq N. Hammad Professor: Dept. of Arch. Jordan University.
EUROPEAN FORUM FOR GEOGRAPHY AND STATISTICS KRAKOW CONFERENCE October, Krakow, Poland Travel Behaviour in Pristina City Author 1: Naim Kelmendi.
Transport Challenges in Northwest Auckland Presentation to Independent Hearings Panel Ian Clark 14 April 2016.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Integrating Transit and Highway Solutions In High Volume Corridors
Teens Tourism trip By: Justin Solis.
Peckham & Nunhead Community Council: Important Issues For Pedestrians
#College Road Trip #HHS College
Signs, Signals, Markings & Speed Limits
SEMS BUS TRAFFIC ONLY FROM 7:00-7:30 A.M. AND 2:00-2:30 P.M. Teacher
Arizona Conference on Roads and Streets Multimodal Cities: Addressing Issues in Transit Corridors March 24, 2016.
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
Slugging in the I-395 Corridor
مدل های ایجاد سفر TRIP GENERATION MODELS
END Route No.13 TIS.
Factors Affecting Urban Land use
Traffic Flow Improvement at the Gate 1
Problem 5: Network Simulation
What number is the arrow pointing at?
Proposed Driscoll Expansion Brookline, Massachusetts
Singular-energy magnitude and location at peak systole in aneurysm volumes (gray) of aneurysm 1, 2, 3, and 5 for 3D PC-MR imaging; CFD with inflow boundary.
Associations between atmospheric chemistry transport model pollution concentrations at lags 0, 1 and 2 and myocardial infarction (% change in risk per.
A: Pressure (green) and volume (black)/time curve in airway pressure release ventilation (APRV). A: Pressure (green) and volume (black)/time curve in airway.
1 Traffic volumes at different T T = 5 sec T = 1 sec T = 10 msec.
Cambourne to Cambridge Better Bus Journeys: On Road Option
School Parking Procedures Morning Drop-Off Parking Options:
Analysis of Freight Flows for Transportation Planning
Comparison between angle-corrected and uncorrected flow velocities and angiographic findings in a 54-year-old woman with MCA stenosis. Comparison between.
Representative quantitative maps of a patient with brain metastasis.
Presentation transcript:

COST APPORTIONMENT PROJECT R880 DEVELOPMENT OF MIRDIF INTERCHANGE RTA PREPARED FOR: DUBAI ROADS AND TRANSPORT AUTHORITY

PRESENT LAND USE AROUND MIRDIF INTERCHANGE MIRDIF INTERCHANGE

1 1. MADINAT BADR UNION COOP SOCIETY 3. AL OWAIS MALL (1) 4. AL OWAIS (2) 5. SHOPPING MALL (3) 6. MIDIF UPTOWN 7. MIRDIF GATE 8. DUBAI RETAIN PARK DEVELOPMENTS: DEVELOPMENTS AROUND MIRDIF INTERCHANGE MIRDIF INTERCHANGE

1 1. MADINAT BADR UNION COOP SOCIETY 3. AL OWAIS MALL (1) 4. AL OWAIS (2) 5. SHOPPING MALL (3) 6. MIDIF UPTOWN 7. MIRDIF GATE 8. DUBAI RETAIN PARK DEVELOPMENTS: TRIP GENERATION FOR EACH DEVELOPMENT MIRDIF INTERCHANGE 1500 IN/OUT 1000 IN/OUT 2500 IN/OUT INOUT AM PM INOUT AM PM INOUT AM PM INOUT AM PM INOUT AM PM497737

1. MADINAT BADR 2. UNION COOP SOCIETY 3. AL OWAIS MALL (1) 4. AL OWAIS (2) 5. SHOPPING MALL (3) 6. MIDIF UPTOWN 7. MIRDIF GATE 8. DUBAI RETAIN PARK DEVELOPMENTS: DEVELOPMENTS AROUND MIRDIF INTERCHANGE MIRDIF INTERCHANGE LINK ROAD

1 1. MADINAT BADR UNION COOP SOCIETY 3. AL OWAIS MALL (1) 4. AL OWAIS (2) 5. SHOPPING MALL (3) 6. MIDIF UPTOWN 7. MIRDIF GATE 8. DUBAI RETAIN PARK DEVELOPMENTS: TRAFFIC VOLUMES FOR EACH DEVELOPMENT MAIN MIRDIF INTERCHANGE

MADINAT BADR * Volumes shown in red are the maximum AM or PM peak volume generated by Madinat Badr Development. * Red arrows show major traffic flows. 79

UNION COOP SOCIETY * Volumes shown in red are the maximum AM or PM peak volume generated by Union Coop Society Development. * Red arrows show major traffic flows.

AL OWAIS SHOPPING MALL (1) * Volumes shown in red are the maximum AM or PM peak volume generated by Al Owais Shopping Mall. * Red arrows show major traffic flows.

AL OWAIS (2) * Volumes shown in red are the maximum AM or PM peak volume generated by the future Al Owais (2) development. * Red arrows show major traffic flows.

MIRDIF UPTOWN * Volumes shown in red are the maximum AM or PM peak volume generated by Mirdif Uptown Development. * Red arrows show major traffic flows.

MIRDIF GATE * Volumes shown in red are the maximum AM or PM peak volume generated by Mirdif Gate Development. * Red arrows show major traffic flows.

DUBAI RETAIL PARK * Volumes shown in red are the maximum AM or PM peak volume generated by Dubai Retail Park (Carrefour). * Red arrows show major traffic flows.

PLANNED SHOPPING MALL (3) ALONG KHAWANEEJ ROAD * Volumes shown in red are the maximum AM or PM peak volume generated by planned Shopping Mall along Khawaneej Rd. * Red arrows show major traffic flows.

LINK ROAD TRAFFIC VOLUMES MADINAT BADR DEVELOPMENT DUBAI RETAIL PARK (CARREFOUR) KHAWANEEJ ROAD ROAD 32 LINK ROAD UNION COOP & AL OWAIS Link Road to serve traffic from Khawaneej road going to Madinat Badr, Union Coop, Al Owais and Muhaisanah. Muhaisanah

COST SHARE PER DEVELOPMENT