API 17V By Christopher Curran January 2013 API 17V – Subsea Safety API Winter 2013.

Slides:



Advertisements
Similar presentations
ISO ESP Systems Task Group Leader, Shauna Noonan
Advertisements

Energy Use and Greenhouse Gas Emission Performance in Canadian Homes Since Update Draft Findings for TRC Management Committee Spring,
Status report for revision of API 17F (ISO )
SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion.
Status report for revision of API 17F
API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Gas Gathering Update Pipeline Safety – Getting to Zero Pipeline.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
Product Lifecycle Management
1 Subsea Reliability and Integrity Management Reliability and Integrity Management – Have very similar intent - almost the same definition – Treated separately.
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
1 Performance Track: Addressing EPA’s Significant Environmental Issues 2008 Performance Track State Conference Lisa Grogan-McCulloch Performance Track.
API Subcommittee 17 Industry Standards for Subsea Equipment
The European Union THE EUROPEAN UNION Lesson 9 How is the EU addressing the issue of climate change?
THE RAILROAD COMMISSION OF TEXAS EMERGENCY MANAGEMENT AND HOMELAND SECURITY A Collaborative Effort By: Team RRC Emergency Management Homeland Security.
City of Watsonville Climate Action Plan and Carbon Fund Project Technical Advisory Committee Meeting #7 Final Meeting April 9, 2014.
© Copyright 2006 POSC1 Gas Lift Scenario Flow Network Construction.
1 API SC6 Winter Meeting Other Materials Issues Tim Haeberle Chief Consulting Engineer – Materials and Processes GE Oil & Gas 4 February 2015.
Standards Governance Update 2010 E&P Winter Standards Meeting January 29, 2010 New Orleans, LA.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC6 Liaison report for SC18 Rick Faircloth.
New Challenges in Deepwater Ultra-deep water and remote locations Harsh environments Small and/or sub-economic accumulations Viscous oil, low energy drive.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
API 17P TASK GROUP January 15, BACKGROUND NWI Initiated in 2006 NWI Initiated in 2006 API 17 P / ISO new recommended practice API 17 P.
1 SP Metrics Pilot Proposal 1 st Quarter 2004 Suppliers Partnership for the Environment Membership Meeting January 22, 2004 Presented By Brad Strohm Scott.
API Recommended Practice 17X Recommended Practice for Design, Installation, and Maintenance of Subsea Booster Pump Systems Status Report October 3,
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
API 11V Task Group 15 November, 2007 Houston, USA.
Status: Draft Status report for revision of ISO (API 17F) Winter meeting Houston January 2010.
San Francisco, CA. SC8 Liaison Report
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience Product Lifecycle Management.
19th January 2012 Don Wells (Hess)
API Task Group on GAS LIFT Equipment Chair - Jim Bennett ExxonMobil.
Status: Draft Status report for revision of ISO (API 17F) Summer meeting Washington June 2010.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
API SUBCOMMITTEE 17 SUMMER MEETING 13 January /13/2016 Subsea Industry Standardization Landscape Terry Cook – API SC17 Vice-Chair.
Task Group Status January ,11, 2017
Gas Lift in Subsea Wells
Task Group 19LH Liner Hanger Equipment
API Subcommittee 17 - Specification 17D January 2016 Status
Subsea Systems Market report categorizes the global market by Subsea Processing, Subsea Production & Geography.
API RP 17A - Discussion Points
API 16C Choke and Kill Equipment
Task Group Status January 2014
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
Task Group Status January 13, 2016
Flow Network Construction
API 17V – Subsea Safety API 17V January 2014 By Christopher Curran
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
API 14H Task Group Status Proper Classification of Document
International Subsea Standardization
SC6 Summer ’13 Meeting: WG 14H Update
CHAIR - JIM BENNETT EXXONMOBIL
API RP 17G2 Subsea Pumping Well Intervention Systems
API Summer Standardization Conference
Don Wells Hess Corporation
API 17P SUBSEA STRUCTURES & MANIFOLDS
API 17P SUBSEA STRUCTURES & MANIFOLDS
API 14H Task Group Status Proper Classification of Document
API 17O HIPPS Task Group Status June /20/2019 API 17O HIPPS.
Discussion Points API RP 17A Task Group Members
Task Group Status January 2013
© 2016 Global Market Insights. All Rights Reserved Subsea equipment Market trends research and projections for 2019 – 2025.
Status report for revision of API 17F
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
API 17P TASK GROUP 13 June, 2012.
API 16C Choke and Kill Equipment
API 17P TASK GROUP June 26, 2013.
Well Intervention Well Control 2019 API E&P Winter Conference Update
Presentation transcript:

API 17V By Christopher Curran January 2013 API 17V – Subsea Safety API Winter 2013

Context Historically have used API 14C – How many times does API 14C reference “subsea” – “The SSV is optional on subsea installations equipped with USVs.” Ongoing developments led to BSEE developing numerous NTLs: – 2009 – G36 Using alternate compliance in safety systems for subsea production operations – Using secondary recovery methods including gas lift and water flood for subsea production operations – Subsea pumping for production operations API Summer 2011 – BSEE requested API to address the gap 2

API RP17V – Subsea Safety Systems Work group formed Summer 2011 following request from BSEE Closely following and working with API 14C First draft issued to reading group Summer 2012 Targeting second draft end 1H 2013 Target Ballot in 2013 NB API 17O took 5 years, so this is fast track! BSEE have been actively engaged in this work since its inception 3

API 17V – Areas to be covered Production and Injection trees Flowlines Chemical injection Manifolds Subsea separation Subsea boosting Subsea compression Gas lift HIPPS 4

Team Members Working GroupReading Group Christopher Curran – BP30+ people Christy Lan – BSEEAker SolutionsAtkins George Ardoin – ChevronATPBHP Billiton William St George – ExxonMobil BPBSEE Richard Barratt – GECameronCSI Marc Young – XodusExxonMobilFMC HalliburtonHess IntecSeaJPKenny ShellSiemens StatoilStone Energy TechnipWJP Enterprises 5