Virtual commissioning at vcc

Slides:



Advertisements
Similar presentations
INTRODUCTION TO SIMULATION WITH OMNET++ José Daniel García Sánchez ARCOS Group – University Carlos III of Madrid.
Advertisements

Organizational buying behavior Presentation created by Mag. Maria Peer based on the lecture BBM1 – Marketing Mag. Andreas Zehetner FH Steyr.
ARCH-05 Application Prophecy UML 101 Peter Varhol Principal Product Manager.
CS487 Software Engineering Omar Aldawud
Chapter 10 Schedule Your Schedule. Copyright 2004 by Pearson Education, Inc. Identifying And Scheduling Tasks The schedule from the Software Development.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
Unrestricted © Siemens AG All rights reserved. The Digital Factory – Enabling a Holistic Approach to Automation MIT Industrial IoT Workshop – October.
Phase V Presentation Group 7 Thomas Kudej Marko Sutovic Timothy Smith.
03/12/2001 © Bennett, McRobb and Farmer Avoiding the Problems Based on Chapter 3 of Bennett, McRobb and Farmer: Object Oriented Systems Analysis.
The Process of Interaction Design. What is Interaction Design? It is a process: — a goal-directed problem solving activity informed by intended use, target.
Information Systems Development Lecture 2: the idea of the Life Cycle.
Fundamentals of Information Systems, Second Edition
Fundamentals of Information Systems, Second Edition
Plant Simulation and the art of decision making 11 th of May 2015 Katharina Albert Smarter decisions, better products.
Palletizing the Easy Way
Introduction to Software Testing
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 4 Product/Process Innovation McGraw-Hill/Irwin.
LEARN. NETWORK. DISCOVER. | #QADexplore Implementing Business Process Management: Steps to Success WCUG – November 18, 2014.
© 2006, Cognizant Technology Solutions. All Rights Reserved. The information contained herein is subject to change without notice. Automation – How to.
SIMATIC New Generation Controllers S7-1200
Chapter 1 Introduction Outstanding Features About This Book 1. A novel writing style is adopted to try to attract students’ or beginning programmers’ interesting.
RCEEMS Project Remotely Controlled Engine Management System Valery Gorohovsky & Shmuel Koyas Supervised by Boaz Mizrachi 19/04/2012.
Chapter 2 The process Process, Methods, and Tools
Lecture # 04 & 05 CS314 Introduction To Software Development Software Development Process (SDP) Instructor :Muhammad Janas khan
Managing the development and purchase of information systems (Part 1)
Robotics RobotStudio TM VirtualRobot TM Technology.
Industry Application for Packaging Andrea Sartori Solution Architect EMEA.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
VALUE BASED SYSTEMS ENGINEERING THE VALUE ADDED PATH FORWARD Joseph Maley October 8, 2015.
CBD Papers Alexandre Alvaro. Lessons Learned through Six Years of Component-based Development Six years of component-based application development Using.
1 Automotive News - May 20, 2008 Enhancement of Virtual Development in FGA Harald J. Wester Chief Technical Officer Fiat Group.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
1 Software Process Models-ii Presented By; Mehwish Shafiq.
Fundamentals of Information Systems, Third Edition1 Systems Design Answers the question “How will the information system do what it must do to solve a.
1 CERTIFIED SOLIDWORKS ASSOCIATE (CSWA) EXAM Nov 26, 20119:00-12:00 Dec 3, :00-12:00 SEB1015 NOTES We’ll take registrations in November but you’ll.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
© 2012 xtUML.org Bill Chown – Mentor Graphics Model Driven Engineering.
Assessing the influence on processes when evolving the software architecture By Larsson S, Wall A, Wallin P Parul Patel.
Computers Are Your Future Tenth Edition Chapter 13: Systems Analysis & Design Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall1.
© Copyright year ABB. All rights reserved BSE033264R0001, Industrial IT for improved productivity.
© Bennett, McRobb and Farmer Avoiding the Problems Based on Chapter 3 of Bennett, McRobb and Farmer: Object Oriented Systems Analysis and Design.
SUSTAINING GROWTH AT COLYTECH How to organize and manage growth in the dynamic Chinese market?
Phoenix Convention Center Phoenix, Arizona Building Performance Using DOE’s Energy Modeling Tools For Retrofit Planning Using DOE’s Energy Modeling Ecosystem.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
TDAQ Upgrade Software Plans John Baines, Tomasz Bold Contents: Future Framework Exploitation of future Technologies Work for Phase-II IDR.
Chapter 6 CASE Tools Software Engineering Chapter 6-- CASE TOOLS
Profile Organisation & Management (O&M). Types of students Researchers: are curious Designers: are creative and constructive Managers: deal with processes.
© Bennett, McRobb and Farmer 2005
Ivana Tong ◊ Sid Shekhar ◊ Matt Tomlinson ◊ Haswiny Deva
Requirements Management with Use Cases Module 2: Introduction to RMUC Requirements Management with Use Cases Module 2: Introduction to RMUC.
Dec 2014 – Simulation Workshop Praha
Fermilab LCLS-II Cryomodule QA/QC Model and Software Tools ESS Cryomodule Workshop, 16-Oct-2014 Jamie Blowers Head of Machine Shop and Quality & Materials.
Product Development Chapter 12. Vocabulary Research and development (R&D): the process of gathering information and using that information to develop.
Join B. Tech Programs (Industry Integrated) in Core Engg. Sector
Smart Integrated Robotics System for SMEs controlled by IoTs based on Dynamic Manufacturing Processes Project presentation.
Automotive Use Case Collaborative Monitoring
SMS Roundtable Discussion NAFEMS Americas 2016, Seattle, WA, USA
Overview of System Engineering
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Fuel Cell Market size worth $25.5bn by 2024 PLC Software Market Analysis.
Introduction to Software Testing
Software Engineering Lecture 18.
Intelligent Predictive Maintenance Solution based on Interactive Virtual Reality and Industrial Internet of Things Coherence (INPREMAS)
CS 8532: Advanced Software Engineering
Services Panagiotis Bouklis European Dynamics SA.
Intelligent Predictive Maintenance Solution based on Interactive Virtual Reality and Industrial Internet of Things Coherence (INPREMAS)
14 June 2018 Matthieu Branlat (SINTEF)
MANAGING THE DEVELOPMENT AND PURCHASE OF INFORMATION SYSTEMS
Project Management Office Tool
PSS verification and validation
PSS0 Configuration Management,
Presentation transcript:

Virtual commissioning at vcc Ready4reality Virtual commissioning at vcc Andreas Jonsson MSc. Method Lead BIW Manufacturing Engineering Volvo Car Group Ready4Reality Virtual Commissioning at Volvo Cars, Andreas Jonsson, Volvo Car Group Date Created: July 9, 2014

$9B Volvo Car Group SWEDEN Gothenburg DENMARK Copenhagen USA Camarillo CHINA Car & Engine Production Product Development BELGIUM Gent Car production USA Camarillo Design centre SWEDEN Gothenburg Head office Product development, Skövde, Floby and Olofström Component manufacturing MALAYSIA Kuala Lumpur Assembly factory SPAIN Barcelona DENMARK Copenhagen RD Centre USA Charleston Manufacturing Plant Ready4Reality Virtual Commissioning at Volvo Cars, Andreas Jonsson, Volvo Car Group Date Created: July 9, 2014

Our journey forward Ready4Reality Virtual Commissioning at Volvo Cars, Andreas Jonsson, Volvo Car Group Date Created: July 9, 2014

More models! Rapid follower! Designed around you Truly global Ready4Reality Virtual Commissioning at Volvo Cars, Andreas Jonsson, Volvo Car Group Date Created: July 9, 2014

But how? More models! Rapid follower! Designed around you Truly global When your are small… Rapid follower! Designed around you Truly global Ready4Reality Virtual Commissioning at Volvo Cars, Andreas Jonsson, Volvo Car Group Date Created: July 9, 2014

>80M 0,5M Ready4Reality Virtual Commissioning at Volvo Cars, Andreas Jonsson, Volvo Car Group Date Created: July 9, 2014

Shorten Leadtime (40 to 30 Mts) Fast and nimble Shorten Leadtime (40 to 30 Mts) Flexible Plants Reduce physical prototypes Decisions solely on Virtual Data Ready4Reality Virtual Commissioning at Volvo Cars, Andreas Jonsson, Volvo Car Group Date Created: July 9, 2014

Virtual trust enable more, earlier descisions with high quality High detailed models High Quality PLM data Complete simulation models (Incl. Signals & behaviour models for all equipment etc.) Ready4Reality Virtual Commissioning at Volvo Cars, Andreas Jonsson, Volvo Car Group Date Created: July 9, 2014

Current capabilities 30+ engineers within process simulation Extensive standards & specifications (Sim, Robot, Plc) VOLP – Volvo OffLine Programming tool Not utilizing the full potential… Ready4Reality Virtual Commissioning at Volvo Cars, Andreas Jonsson, Volvo Car Group Date Created: July 9, 2014

Ready 4 reality achieve higher maturity level much earlier Virtual Commissioning captures the whole station logic! fully verified process without physical installation Use what we already have Add the real control system and Code Ready4Reality Virtual Commissioning at Volvo Cars, Andreas Jonsson, Volvo Car Group Date Created: July 9, 2014

development logic much higher virtual focus Invest more time here… … to gain time here PS PC FDJ TT J1 Core phase Develop Process/product Develop Process/product and PLC PLC, installation and commissioning Installation and commissioning Virtual commissioning Complete virtual installation Develop More robust processes Verification without physical prototypes Debug process logic off-line Ready4Reality Virtual Commissioning at Volvo Cars, Andreas Jonsson, Volvo Car Group Date Created: July 9, 2014

Implementation step by step Decision to investigate VC Decision to include VC in car projects Initial WS at Siemens Second WS at Siemens Scope for Pilot decided Pilot report out Internal VCC Pilot Working methods 2013 2014 2015 Ready4Reality Virtual Commissioning at Volvo Cars, Andreas Jonsson, Volvo Car Group Date Created: July 9, 2014

Vitual Commissioning pilot scope & findings Small ”simple” station Evaluate Siemens technical solution Start develop methods and workflows Suggest next steps tech: ABB IRC5 Spot-servo and Handling/Glue Siemens CPU 319F Process Simulate & TiaPortal Simatic Net OPC Server Findings: No adaptions needed for PLC or Robotics Very powerful debugging Easy, fast setup Must C the need for: Commonality -> support auto generation Co-locate -> create understanding Co-operation -> responsibility split (VCC/Linebuilder) Ready4Reality Virtual Commissioning at Volvo Cars, Andreas Jonsson, Volvo Car Group Date Created: July 9, 2014

Virtcom research project Ready4Reality Virtual Commissioning at Volvo Cars, Andreas Jonsson, Volvo Car Group Date Created: July 9, 2014

virtcom work packages Ready4Reality Virtual Commissioning at Volvo Cars, Andreas Jonsson, Volvo Car Group Date Created: July 9, 2014

Current activities new car project scope: 2 stations for 2 model introductions Process Simulate connected via OPC or Simba Reviews during project to track progress VC presented before installation activities start Safety NOT a demand Measure success rate: Process related errors during commissioning Over all commissioning time of station Did we miss something? Preparation in early phases (more/less) Modified hand-over to supplier: Event based simulation instead of Gantt Charts Equipment with behavior models instead of simple kinematics Think about and prepare for VC, reusable logics Take more responsibility! Ready4Reality Virtual Commissioning at Volvo Cars, Andreas Jonsson, Volvo Car Group Date Created: July 9, 2014

other activities input generation scope: Focus on the input to Virtual Commissioning How much can we auto-generate? POC study: Project together with EPLAN Use information from process planning software to generate: Electrical schematics I/O lists Start with respot stations in Q3 2015 Ready4Reality Virtual Commissioning at Volvo Cars, Andreas Jonsson, Volvo Car Group Date Created: July 9, 2014

? ? ? ? ? ? ? ? ? ? ? ? ?

Thank you! Ready4Reality Virtual Commissioning at Volvo Cars, Andreas Jonsson, Volvo Car Group Date Created: July 9, 2014