Engineering Orientation Engineering Economics. Value and Interest Cost of Money Simple and Compound Interest Cash Flow Diagrams Cash Flow Patterns Equivalence.

Slides:



Advertisements
Similar presentations
Example 1: In the following cash flow diagram, A8=A9=A10=A11=5000, and
Advertisements

HW 2 1. You have accumulated $4,400 in credit card debt. Your credit card rate is 8.5% APR and you are charged interest every month on the unpaid balance.
© Mcgraw-Hill Companies, 2008 Farm Management Chapter 17 Investment Analysis.
FA2 Module 5. Interest concepts of future and present value 1.Time value of money 2.Basic interest concepts 3.Present and future values a.Single payment.
Interest Rates and the Time Value of Money (Chapter 4)
1 Chapter 05 Time Value of Money 2: Analyzing Annuity Cash Flows McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill © 2004 The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Discounted Cash Flow Valuation Chapter 5.
Discounted Cash Flow Valuation Chapter 5 2 Topics Be able to compute the future value of multiple cash flows Be able to compute the present value of.
Chapter 17 Investment Analysis
Chapter 5 Time Value of Money
CHAPTER 06: TIME VALUE OF MONEY
©CourseCollege.com 1 17 In depth: Time Value of Money Interest makes a dollar to be received tomorrow less valuable than a dollar received today Learning.
Lecture Four Time Value of Money and Its Applications.
Chapter 4: Time Value of Money
Engineering Economics Outline Overview
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
Multiple Cash Flows –Future Value Example 6.1
Flash Back from before break The Five Types of Cash Flows (a) Single cash flow (b) Equal (uniform) payment series (c) Linear gradient series (d) Geometric.
Engineering Economic Analysis Canadian Edition
5.0 Chapter 5 Discounte d Cash Flow Valuation. 5.1 Key Concepts and Skills Be able to compute the future value of multiple cash flows Be able to compute.
5.0 Chapter 4 Time Value of Money: Valuing Cash Flows.
Discounted Cash Flow Valuation Chapter 4 Copyright © 2010 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
McGraw-Hill /Irwin© 2009 The McGraw-Hill Companies, Inc. TIME VALUE OF MONEY CONCEPTS Chapter 6.
Topic 9 Time Value of Money.
CHAPTER 6 Discounted Cash Flow Valuation. Key Concepts and Skills Be able to compute the future value of multiple cash flows Be able to compute the present.
Discounted Cash Flow Valuation.  Be able to compute the future value of multiple cash flows  Be able to compute the present value of multiple cash flows.
Time Value of Money – Part II
Summer Time Value of Money Session 2 07/02/2015.
1 1. You have accumulated $4,400 in credit card debt. Your credit card rate is 8.5% APR and you are charged interest every month on the unpaid balance.
ENGR 112 Economic Analysis. Engineering Economic Analysis Evaluates the monetary aspects of the products, projects, and processes that engineers design.
9/11/20151 HFT 4464 Chapter 5 Time Value of Money.
Finance 2009 Spring Chapter 4 Discounted Cash Flow Valuation.
Example [1] Time Value of Money
Engineering Economics, Excel Cost of Loosing One Semester.
 What large purchases or expenditures do you foresee in your future?  How are you preparing to make these purchases a reality?
Engineering Orientation Engineering Economics. Value and Interest The value of a dollar given to you today is of greater value than that of a dollar given.
1 FINC3131 Business Finance Chapter 5: Time Value of Money: The Basic Concepts.
1 Slides for BAII+ Calculator Training Videos. 2 Slides for Lesson 1 There are no corresponding slides for Lesson 1, “Introduction to the Calculator”
NPV and the Time Value of Money
Engineering Economic Analysis Canadian Edition
Interest and Interest Rate Interest ($) = amount owed now – original amount A)$1000 placed in bank account one year ago is now worth $1025. Interest earned.
ENGINEERING ECONOMICS Lecture # 2 Time value of money Interest Present and Future Value Cash Flow Cash Flow Diagrams.
McGraw-Hill/Irwin ©2001 The McGraw-Hill Companies All Rights Reserved 5.0 Chapter 5 Discounte d Cash Flow Valuation.
1 Chapter 05 Time Value of Money 2: Analyzing Annuity Cash Flows McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
© 2009 Cengage Learning/South-Western The Time Value Of Money Chapter 3.
© 2004 The McGraw-Hill Companies, Inc. McGraw-Hill/Irwin Chapter 6 Time Value of Money Concepts.
Engineering Economics Exploring Engineering. 2 Engineering economics  How much will an engineering project cost?  Simple and compound interest  Cost.
Engineering Orientation
Quantitative Finance Unit 1 Financial Mathematics.
Engineering Economic Analysis Canadian Edition Chapter 3: Interest and Equivalence.
Lecture Outline Basic time value of money (TVM) relationship
5-1 Chapter Five The Time Value of Money Future Value and Compounding 5.2 Present Value and Discounting 5.3 More on Present and Future Values.
MGT 470 Ch 4 TVM (cs3ed) v1.0 Aug 15 1 Ch 4: Time Value of Money Time Has Value (The Time Value of Money – TVM):  Time affects the value of financial.
An Overview of Personal Finance The Time Value of Money –Money received today is worth more that money to be received in the future –Interest Rates Nominal.
Chapter 3 Understanding Money Management
Appendix A- 1. Appendix A- 2 Time Value of Money Managerial Accounting Fifth Edition Weygandt Kimmel Kieso.
Engineering Your Future Engineering Economics Economics Value and Interest The value of a dollar given to you today is of greater value than that.
5-1 Copyright  2007 McGraw-Hill Australia Pty Ltd PPTs t/a Fundamentals of Corporate Finance 4e, by Ross, Thompson, Christensen, Westerfield & Jordan.
1 Engineering Economics.  Money has a time value because it can earn more money over time (earning power).  Money has a time value because its purchasing.
Example 1: Because of general price inflation in the economy, the purchasing power of the Turkish Lira shrinks with the passage of time. If the general.
Living with the lab Engineering Economics - Cash Flow Diagrams Cash flow diagrams provide a simple way to visualize the cash that comes “in” and the cash.
Consider a principal P invested at rate r compounded annually for n years: Compound Interest After the first year: so that the total is now 1.
Understanding and Appreciating the Time Value of Money
McGraw-Hill/IrwinCopyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Discounted Cash Flow Valuation.
Engineering Orientation Engineering Economics. Value and Interest The value of a dollar given to you today is of greater value than that of a dollar given.
Engineering Orientation Engineering Economics. Value and Interest Cost of Money Simple and Compound Interest Cash Flow Diagrams Cash Flow Patterns Equivalence.
Chapter 5 Engineering Economics
Example 1: Because of general price inflation in the economy, the purchasing power of the Turkish Lira shrinks with the passage of time. If the general.
UNDERSTANDING MONEY MANAGEMENT
Presentation transcript:

Engineering Orientation Engineering Economics

Value and Interest Cost of Money Simple and Compound Interest Cash Flow Diagrams Cash Flow Patterns Equivalence of Cash Flow Patterns

Value and Interest “Value” is not synonymous with “amount”. The value of an amount of money depends on when the amount is received or spent. First Cost is what you pay for an item when you buy it

Value and Interest The difference between the anticipated amount in the future and its current value is called interest. At an interest rate of 10% what is the value now of the expectation of receiving $1 in one year?

Cost of Money Interest that could be earned if the amount invested in a business or security was instead invested in government bonds or in time deposit.

Cost of Money Buy a car for $20,000 of your own cash vs. US bonds returning 5%/yr ($1,000 forever) In effect you are paying $1,000 for ever (even after the car is a certifiable clunker destined for destruction)

Simple and Compound Interest You have a business project costing $100,000 You get a loan for 7.5% yearly for 5 years at simple interest payable at the end of the loan The loan costs $7,500 for each of five years for a total interest of $37,500 Total cost over 5 years = $137,500

Simple and Compound Interest Is the banker really willing to lend you money for 5 years? Isn’t he also lending you $7,500 for four years, $7,500 for three years, $7,500 for two years, $7,500 for one year

Terms and formulae P or PV Principal is the amount borrowed N # of pay periods r Interest rate per period F or FV, Future worth, value in the future of what you have to payback Formulae: Simple interest = P(1 + Nr) ( = $137,500) Compound interest = P(1 + r) N ( = $143,563)

Pay periods Calculate FV Assume your loan is compounded quarterly, monthly or daily instead of yearly. Student loan of $25,000 at 8% for Annually for two years, Quarterly for two years and Daily for two years

Pay periods

Study Examples Compute the effective annual interest rate i e equivalent to 8% nominal annual interest compounded continuously. Calculate the PV

Example What amount must be paid in two years to settle a current debt of $1,000 if the interest rate is 6% Annually?

Cash Flow Diagrams

Cash Flow Patterns

Example A new widget twister, with a life of six years, would save $2,000 in production costs each year. Using a 12% interest rate, determine the highest price that could be justified for the machine. Although the savings occur continuously throughout each year, follow the usual practice of lumping all amounts at the ends of years.

Example A new widget twister, with a life of six years, would save $2,000 in production costs each year. Using a 12% interest rate, determine the highest price that could be justified for the machine. Although the savings occur continuously throughout each year, follow the usual practice of lumping all amounts at the ends of years.

Example How soon does money double if it is invested at 8% interest?

Example 2 Find the value in 2002 of a bond described as “Acme 8% of 2015” if the rate of return set by the market for similar bonds is 10%.

Example Compute the annual equivalent maintenance costs over a 5-year life of a laser printer that is warranted for two years and has estimated maintenance costs of $100 annually. Use i = 10%.

22 Return on Investment ROI = The ratio of annual return to the cost of the investment If an investment of $500,000 produces an income of $40,000 per year, its ROI = $40,000/$500,000 = 0.08 = 8%. Many successful large companies operate with ROI’s of 15% or more

23 Return on Investment

Unusual Cash Flows and Interest Periods

PAYMENTS AT BEGINNINGS OF YEARS Using a 10% interest rate, find the future equivalent of:

Cost of losing one semester Two students, Frank and Mary start they Engineering Studies on the same date and they make the commitment of retiring thirty years after their forecasted graduation date (the date they would graduate if no delays are introduced). This date will not change if any delays make any of them graduate later. Calculate the difference in their earnings if for some reasons Frank is required to graduate one semester later than what was intended.

The Model Assumptions: We have a constant inflation You have a yearly Salary Increase greater than what you loose because of inflation Salary increases and inflation are constant They work for the same company their entire carrier

Study Examples Your perfectly reliable friend, Frank, asks for a loan and promises to pay back $150 two years from now. If the minimum interest rate you will accept is 8%, what is the maximum amount you will loan him? a) $119 b) $126 c) $129 d) $139 The annual amount of a series of payments to be made at the end of each of the next twelve years is $500. What is the present worth of the payments at 8% interest compounded annually? a) $500 b) $3,768 c) $6,000 d) $6,480

Study Examples Maintenance expenditures for a structure with a twenty- year life will come as periodic outlays of $1,000 at the end of the fifth year, $2,000 at the end of the tenth year, and $3,500 at the end of the fifteenth year. With interest at 10%, what is the equivalent uniform annual cost of maintenance for the twenty-year period? a) $200 b) $262 c) $300 d) $325 The purchase price of an instrument is $1 2,000 and its estimated maintenance costs are $500 for the first year, $1 500 for the second and $2500 for the third year. After three years of use the instrument is replaced; it has no salvage value. Compute the present equivalent cost of the instrument using 1 0% interest. a) $14,070 b) $15,570 c) $15,730 d) $16,500

Study Examples If $10,000 is borrowed now at 6% interest, how much will remain to be paid after a $3,000 payment is made four years from now? a) $7,000 b) $9,400 c) $9,625 d) $9,725