Madrid, 27 October 2009 South Gas Regional Initiative Open Season France-Spain Validation of the results.

Slides:



Advertisements
Similar presentations
GRIP South Region Gas Regional Investment Plans Investment WS – 29 th Sep 2011.
Advertisements

Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
Open seasons in European Markets: Overview and initial lessons learned Dominique Jamme ERGEGs Gas Focus Group (GFG) XIV Madrid Forum, May 2008.
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
Paris, 14 th December th IG Meeting South Gas Regional Initiative.
RCC Meeting 13 December 2007 Interconnections: primary market IP Taisnières / Blaregnies / Quévy IP Taisnières / Blaregnies / Quévy IP Obergailbach / Medelsheim.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
Madrid, 17 th February th IG Meeting South Gas Regional Initiative.
Lessons from open seasons between France and Spain Regulator’s perspective Benoît Esnault Commission de Régulation de l’Energie (CRE) North West region.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
1 Open Season Development of new capacities between France and Luxembourg NW-GRI, September - 21 st, 2010.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
GIE Reverse Flows Study Revers Flows inside the SSE Region Vaclav Vocilka GIE Executive Secretary GRI SSE SG Vienna, 16 October.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
9th SG Meeting South Gas Regional Initiative 15th July 2009, Madrid.
French Working Group Evolution of the contractual structure of the gas transportation network South Gas Regional Initiative 8th IG Meeting – 16th February.
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
1 July 2007 Gas Interconnection between Spain and France Comments to the TSO’s document on the analysis of the future interconnection infrastructures needed.
Madrid 15 th July 2009 OS for the development of new gas interconnection capacity between Spain and France after th SG meeting.
Madrid, 16th February th IG Meeting South Gas Regional Initiative.
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
Madrid, 1 st April 2008 Offering of capacities under the OSP.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
France – Spain open season Results Lessons learned.
XV Madrid Forum, 6-7 November 2008 Gas Regional Initiative Progress and challenges.
French transport structure SG meeting Madrid – 15 July 2009.
Gas Regional Initiative – North West Region IG meeting The Hague – 25th March, 2009 Open Seasons Coordination Marie-Claire AOUN – CRE
Madrid, April 1 st th SG Meeting South Gas Regional Initiative Working Group 4B : Open Seasons.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Madrid, 12 th April th IG Meeting South Gas Regional Initiative.
OS 2015: next steps Proposals and agreements by TSOs 12 th IG meeting Paris 14 th December 2009.
Madrid, 7 th May th SG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
DEVELOPMENT OF GAS HUBS South Gas Regional Initiative Madrid, 29th October 2007.
2006 December 11th ERGEG South GRI – 2 nd IG Assessment of the capacity at the GRTgaz / TIGF interface South Gas Regional Initiative – 2 nd Implementation.
1 Open season th IG Meeting 26 th March 2010 Paris.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
10 th SG meeting Madrid 13 th November Index Capacities – Results Capacities – Further steps Capacities – Further steps.
8th SG Meeting South Gas Regional Initiative 27th April 2009, Paris.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
25 th IG meeting 13 th December 2013 Enagás, REN and TIGF Issues to be discussed.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
Gas Regional Initiative – North West Region Governmental Meeting 6 May 2010 – The Hague Secondary capacity markets Project update Betsy ANNEN – CRE Bernhard.
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
Madrid, 1st April th SG Meeting South Gas Regional Initiative.
OS 2015: Information Memorandum Draft proposal 12 th SG meeting Madrid 7 th May 2010.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
OS 2015: Allocation Rules Proposal by TSOs 11 th SG meeting Paris 16 th March 2010.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative TSOs’ report 2013/2015 – Main Findings.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
GRTgaz North  South Link Capacities Sales Organization Considering Future France – Spain Developments 5 th SG meeting of S-GRI in Madrid.
1 CRE proposal on how to allocate capacity according to the Joint Enagas, TIGF and GRTgaz investment plans: points that have been agreed / still need to.
1 Open Seasons between France and Belgium GRTgaz Fluxys Gas Regional Initiative North-West Stakeholders Meeting 7 May 2010.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
25th IG meeting 13th December 2013
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
26th IG meeting 23th January 2014
2nd SG Meeting South Gas Regional Initiative TSOs’ report 2010/11 – Main Findings Madrid, 6th February 2007.
Results of the First Phase of the OS 11th IG meeting
Presentation transcript:

Madrid, 27 October 2009 South Gas Regional Initiative Open Season France-Spain Validation of the results

29th S GRI IG meeting – 27 th October – Madrid Test to validate capacity allocation As required at the 8 th SG meeting of of 27 th April in Paris, a test to validate capacity allocation in France has been published in the information memorandum for the open season 2013 This test has been presented at the 9 th Stakeholders meeting of 15 th July in Madrid and some clarifications were brought No further comments were raised regarding this test The test is related to investment validation on the French side of the interconnection between Spain and France

39th S GRI IG meeting – 27 th October – Madrid Principles and priority of the test General principle: If less than 50% of the marketed capacity is allocated, then the capacity allocation will be considered as non valid and no capacity booking contracts will be signed If more than 90% of the marketed capacity is allocated, then the capacity allocation will be considered as valid and the relevant contracts will be signed If the capacity allocated lies between 50 and 90%, then the continuation on whether to continue the open season will be discussed Priority given to Larrau: 1.Validation of Larrau 2.Then allocation up to the maximum capacity of Larrau 3.Remaining quantity taken into consideration to validate or not Biriatou 4.Validation of Biriatou

49th S GRI IG meeting – 27 th October – Madrid Figures of the test CapacityCalculation of the figures > = 100% of Larrau (132+70) + 90% of Biriatou (48+48) = 100% of Larrau + 50% of Biriatou = 90% of Larrau 182 – = 50% of Larrau < 101

59th S GRI IG meeting – 27 th October – Madrid Result of the test CapacityResult of the test > 288Larrau and Biriatou validated Larrau validated and Biriatou discussed Larrau validated but not Biriatou 182 – 101Larrau discussed and Biriatou not validated < 101Nor Larrau neither Biriatou validated The demanded quantity amounts to 249 GWh/j

69th S GRI IG meeting – 27 th October – Madrid Application of the test According to the test:  Larrau is validated but not Biriatou  CRE proposes to validate the results of the open season accordingly, i.e. to allocate capacity at Larrau but not at Biriatou

79th S GRI IG meeting – 27 th October – Madrid Possible next steps CRE considers that the strong demand in the direction France to Spain has to be taken into account: It could be envisaged to re-offer the capacity at Irun/Biriatou during the binding phase of the open season 2015, together with the capacity of MidCat In this perspective, TSOs could realise some complementary studies, in order to adjust, if necessary, the physical investments needed, the investment costs and the date of availibility of capacity