20061110 Valencia GDE Global Design Effort 1 CCB Report at Valencia GDE Meeting Nobu

Slides:



Advertisements
Similar presentations
IPM Exam PreparationIPM Exam Preparation November 12 th pm – 5.15pm 2 hours & 15 minutes reading time.
Advertisements

N.Toge on SB20091 SB2009 Rebaselining Proposal Document - How do we get it done? /10/2 N.Toge (KEK) for SB2009 Efforts.
1-1 Copyright © 2015, 2010, 2007 Pearson Education, Inc. Chapter 18, Slide 1 Chapter 18 Confidence Intervals for Proportions.
Systems Analysis and Design 9th Edition
The Comparison of the Software Cost Estimating Methods
Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved. Business and Administrative Communication SIXTH EDITION.
6-Nov-06 FALC Resource Board Global Design Effort 1 Report from the GDE Barry Barish Caltech / GDE 6-Nov-06.
Oct. 30, 2003CS WPI1 CS 509 Design of Software Systems Lecture #9 Thursday, Oct. 30, 2003.
Lecture 10 Comparison and Evaluation of Alternative System Designs.
Problem solving in project management
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Dec. 2005E-upgrade GDE Frascati1 “Energy Upgrade Scenario TG” Report L.Lilje, T.Raubenheimer and N.Toge Full Report:
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
BASIC IRRS TRAINING Lecture 7
Development and application of guidance documents – industry view Dr Martin Schaefer ECCA-ECPA Conference March 2014.
SB2009 Triage B1 SB2009 Triage Summary B N.Toge.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
2013 NWHA CONFERENCE FERC’S RISK-INFORMED DECISION MAKING Doug Johnson – Regional Engineer - Portland From PFMA to Risk Assessment.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Systems Analysis and Design 8 th Edition Chapter 2 Analyzing the Business Case.
Status Update Outline  General remarks - reminder  Progress since last Annual Meeting – June 2010  Next steps - timeline EUROnu Costing Ilias Efthymiopoulos.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
Dec, 2005Toge CCB - Draft v.0.41 C hange C ontrol B oard Nobu Toge (KEK) GDE Meeting, Dec at Frascati.
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
IE-498 / IE-499 Report and Presentation Guidelines Prepared, Presented by: Graduates Committee 12:30 – 1:30 PM (Room: A1-46) Wed. Dec 22, 2010 (16/1/1432H)
FEASIBILITY STUDY.
BCD Status: Strengths and Weaknesses Tor Raubenheimer.
Rolling Resistance Standards Work at ISO (TC31 WG6) Prepared for GRB Review 19 Sep 2011 Angela Wolynski WG6 Convenor Informal document GRB (54th.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
1 Status of SB2009 Rebaselining Proposal Document and Preview of Feedback from PMs + Editor Draft C N.Toge.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
EM Report1 Report from Engineering Management Group to GDE EC 2007/12/12 Report by N.Toge.
Injection Energy Review D. Schulte. Introduction Will review the injection energy So could answer the following questions: Which injection energy can.
Maintaining and Sustaining System Integrity Configuration Management for Transportation Management Systems Configuration management (CM) describes a series.
20 July 2006 Vancouver GDE Meeting Global Design Effort 1 Ring to Main Linac Peter Tenenbaum SLAC.
GG3 Operations & Reliability (Availability) Eckhard Elsen Tom Himel
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
6-7 April 06 MAC Review Global Design Effort 1 Configuration Control – Change Control Board (CCB) Report Nobu Toge GDE KEK.
On S1Global Writeup S1G Writeup Meeting Nobu Toge 1.
Date Event Global Design Effort 1 GDE CCB Remarks on  GDE Meeting, Vancouver, July, 2006 Nobu Toge (CCB/KEK)
Date Event Global Design Effort 1 CCB Report GDE Meeting, Vancouver, July, 2006 Nobu Toge KEK/GDE.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
N. Walker, K. Yokoya LCWS ’11 Granada September TeV Upgrade Scenario: Straw man parameters.
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
44222: Information Systems Development
HighImpactSoft 2010 Organizing a Better Future. Agenda Specify Goals ScopeDefinitions Process Model Preliminary Requirements Issues and solutions TraceabilityPrototype.
1 Status of the BCD GDE Area System Leaders Meeting (Jan.19-20, 2006) Nobu Toge (KEK)
Global Design Effort RTML KOM Close-out Ross, Walker.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
Abstract  An abstract is a concise summary of a larger project (a thesis, research report, performance, service project, etc.) that concisely describes.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Paul Henry with thanks to co-reviewers: Wolfgang Hees, Karin Rathsman, Peter Rådahl, Mats Lindroos Review of TDR Chapter 7 “Conventional Facilities”
19Jul06 Vancouver GDE meeting 1 S2 Task Force Status (String test definition) Tom Himel.
LCLS-II Cost Details E. Daly / C. Hovater / M. Wiseman with help from Accel Ops and Engineering 03-AUG-2017.
(Additional materials)
Accelerator Physics Technical System Group Review
TECHNICAL REPORT.
Retrieval Performance Evaluation - Measures
Presentation transcript:

Valencia GDE Global Design Effort 1 CCB Report at Valencia GDE Meeting Nobu

Valencia GDE Global Design Effort 2 In Brief I will present to you Introduction CCR#18 (Centralized DR Layout CCR) –To illustrate how CCB works nowadays Ongoing CCB processes –CCR#19 (RTML rev to match CCR#18) –CCR#20 (ML cost reduction) Remarks

Valencia GDE Global Design Effort 3 Introduction CCB = Change Congrol Board –C.Pagani, G.Blair, D.Schulte, T.Markiewicz, S.Mishra, W.Funk, K.Kubo, M.Kuriki, N.Toge CCR = Change Configuration Request –Class 0 : Minor touch-up/corrections/filling-in. –Class 1 : Moderate impacts (< 100M$). –Class 2 : Major impacts (>100M$)  EC approval needed for final decision CCB chair, AG/GG leaders and RDR Integration Scientist may submit CCRs BCD/CCB wiki at d_home d_home –ALL relevant information is posted there for public viewing

Valencia GDE Global Design Effort 4 CCR#18 Experience CCR#18 = Class-2 CCR which proposed to implement both e+ and e- DRs in a single tunnel housing located around IR. Some illustrative remarks concerning the CCB review process on CCR#18, which do not directly show in the CCB report: –Generic Issues –Specific “Technical” Issues with CCR#18 –Specific “Handling” Issues with CCR#18

Valencia GDE Global Design Effort 5

Valencia GDE Global Design Effort 6 General Config Control Issues, including CCR#18 CCR is an “outline of the proposed design” for further study, i.e. CCR is: –Not a completed design –Not a completed engineering solution –Not a completed cost study Hence, the criteria for CCB’s assessment on CCR is –if a proposal offers a “healthy-looking solution with certain merits (cost, performance etc), –which is reasonably likely to offer a workable design with a realistic amount of efforts of available experts, –from all conceivable/known technical standpoints at that time, –Without incurring excessive performance compromise. Does a proposal belong to that category, or not? –That is the issue that CCB has to look at. –CCB, in addition, documents the review process and maintains the BCD, as a result.

Valencia GDE Global Design Effort 7 Technical Issues Specific with CCR#18 1.Fundamentals of the injector complex are not changed … so they are “neutral”. 2.It gives a certain amount of cost reduction … so that is positive. 3.It gives a lot of new engineering design issues … so that is a question. 4.It gives a lot of commissioning / maintenance schedule issues … so this is a question too. 5.It introduces a long 5GeV transport …and certain beam dynamics issues need to be looked at. We must be “reasonably” confident that it works, i.e. emittance preservation, emittance ratio preservation, impacts on the ML beam dynamics have to be deemed OK. This is another important question.

Valencia GDE Global Design Effort 8 Handling Issues Specific with CCR#18 Constraints: –“Process it fast” Standing order within GDE as a whole, or from EC. –“Never ‘take a short-cut’ for sake of speed, in terms of the contents of review process and questions- to-ask. Internal standing order within CCB. BB’s remark Tuesday PM is consistent with this attitude. CCB’s steps to follow in usual cases –Technical Q/A –Cost Q/A –CCB hearing in case of Class-2 (webex-based tele-conference) –Examination, evaluation, then, report writing Solution: Not particularly magical –Do all four steps above, yet –Pipeline, –Parallelize, and –Not compromise

Valencia GDE Global Design Effort 9 Handling Issues Specific with CCR#18 (cont) Pipeline: –CCB question, in time early, for proponents to prepare for discussion in CCB hearing. –Use the same question sheet as a basis for the CCB report. –Interactions with proponents, in time early, on additional illustrations and refinement of the replacement text for BCD. Parallel processing: –Internal CCB analyses (beam dynamics, timing, others) to proceed concurrently. –Drafting of the hearing minutes and the CCB report concurrently. (4-5 drafts before final, as usual) –CCB members assigned to draft portions of CCB report in parallel. –Take advantage of “around-the-clock” availability of someone in CCB for work somewhere on the planet.

Valencia GDE Global Design Effort 10 Technical Assessement on CCR#18 Q3: Design engineering issues: –Engineering is an area of major additional effort: However, none fundamentally unfeasible identified. i.e. tunnel diameter, support system, alignment, etc. Q4: Maintenance / Commissioning issues: –Issues of temporal order of installation / maintenance work, and personnel safety interlocks … We found they belong essentially to the same category as Q3 also. Q5: Beam dynamics with 5GeV Beam Transport. –Seemingly innocuous BT is something that often bites you. “Interface junction always tends to be a problem”… So this was a concern. “Care-taker” for this has been identified - RTML AG. –CCB looked for some quantitative evaluations, which was not really there in the proposal whose statements were mostly qualitative. –Some quantitative simulation results (by Kubo) became available during CCB review, supporting proponents’ claim. Thus all the technical questions did NOT lead to major performance threats, according to CCB evaluation that was reached through interactions with the proponents and through CCB’s own analysis.

Valencia GDE Global Design Effort 11 CCR#18 - Summary Calendar: –CCR#18 submission: Oct. 7, 2006 –CCB hearing: Oct. 23, 2006 –CCB report to EC: Oct. 28, 2006 Pipelined, parallel, no-compromise approach worked. –3 weeks to get one Class-2 CCR processed by CCB –Plus 1 week for EC to give the final approval. We benefited from the facts that: –CCB had a pre-warning beforehand. –No major interruptions were caused by conferences and travels. –CCR, as it was submitted, turned out to be in a “good shape”. –It really did not pose major, quantifiable performance threats, as CCB came to understand it. Note that, –It is impractical to try processing any faster. –Unlikely to be able to process Class-2 CCRs this fast all the time: Not all CCB members can devote 100% time on CCB business all the time. Forthcoming CCRs might incur performance risks/compromises, which complicates CCB’s thought process.

Valencia GDE Global Design Effort 12 CCR#19 under CCB Process CCR#19 is: RTML CCR to –Restore consistency with CCR#18 (i.e. centralized DR) –Introduce cost cutting measures.

Valencia GDE Global Design Effort 13 Current Status of CCR#19 (1) Calendar –CCR#19 submitted on Oct.25 (was on hold initially, since CCR#18 was still under processing) –Review process started on Oct.28 –CCB question sheet to proponents on Oct.31 –Response from proponents on Oct.31 –CCB hearing on Nov.9

Valencia GDE Global Design Effort 14 Current Status of CCR#19 (2) Remarks from CCB so far, out of its review and its interaction with relevant experts and the proponents: –Reclassified as Class-2 (Nov.9). –BC text for CF/S is needed eventually. –Highly desirable to have a figure for RTML outline layout. –Most technical questions from CCB have been (nearly) resolved. –Endorse maintaining provision of space for 2 additional Laser wires besides the assumed 4. –Under discussion: Reduction of BC2 RF units appears OK, but should we not reserve tunnel space for them? Estimated CCB conclusion date –Not next week. Anticipated CCB response –Not available yet.

Valencia GDE Global Design Effort 15 CCR#20 under CCB Process ML cost cutting measures in the areas of –24 cavities/RF unit  26cavities/RF unit Reduction of RF unit (i.e. mod + klys, but NOT cavities + WGs) population by factor 1/13. Canonical Eacc still is 31.5MV/m, but max Eacc now is 33.5MV/m rather than 35MV/m. –Elimination of 3.5% energy overhead Reduction of 3.5% worth of RF + WG + cav + CM + LLRF + CF/S Need all cav + CM to run to get ECM = 500GeV –Elimination of uncertainty factor in the cryogenic static heat load Lower cryogenic capacity by 13%. Allowance still reserved for dynamic heat load. Calendar –CCR#20 submitted on Oct.30 –CCB questions to requesters on Nov.2 –Requester response to CCB on Nov.7 –CCB hearing on Nov.9

Valencia GDE Global Design Effort 16 Current Status of CCR#20 Remarks from CCB so far, out of its review and its interaction with relevant experts and the proponents: –Parameter section of BCD needs a touch-up Should insert “proper” beam parameters that were adopted as of Frascati. Sb = 337ns, N = 2E10, I = 9.5mA, Train length = 1ms. –Cryogen heat capacity (abs value) needs a more explicit description. –RF power headroom is tight, from LLRF standpoint, whether it is 24cav/RF or 26cav/RF. Interactions with experts indicate that it is very difficult to quantify the likely magnitude of energy or beam current compromise –Solid availability of 10MW klystron is a critical assumption. –Elimination of 3.5% ML overhead nearly guarantees that there will be no full-lumi 500GeV operation. –Under discussion: What if we drop 3.5% worth of ML RF + cav implementation, yet maintain 3.5% worth of ML tunnels? Estimated CCB conclusion date –Not next week. Anticipated CCB conclusion –Not available yet.

Valencia GDE Global Design Effort 17 Now Assorted set of remarks which might be of interest.

Valencia GDE Global Design Effort 18 Costing Subjects and CCB (1) For each of most CCRs, CCB is requesting costing information ($$$ and fractional) from the proponents This information is used to –Make it possible for CCB to have an intelligent thought process to review the CCR, e.g. –Determine if it is Class-1 ( 100M$, requiring EC final approval) –Determine if it is “reasonable”. I.e. if there are any noteworthy performance compromises for a (limited) cost reduction, etc CCB does not review costing methodologies CCB does not assume full costing is available before CCR approval

Valencia GDE Global Design Effort 19 Costing Subjects and CCB (2) The level of costing details CCB requests varies from CCR to CCR, depending on its nature –CCB requests cost data in ways that makes it possible for CCB to understand which piece of CR corresponds to which cost gain (or increase) –Most likely CCB does NOT request full depth WBS; CCB is unlikely to be capable of making sense out of it anyways. “CCB Hearing” is the platform for siphoning the cost data “Minutes of CCB Hearings” are part of CCB final report, which goes public (with data fractional cost deltas).

Valencia GDE Global Design Effort 20 RDR and BCD RDR has to be consistent with BCD (BB statement, VC). So, CCB requests you (AG/GG) to fill in - –Revisions since Frascati / Bangalore / Vancouver that is concrete and substantial enough to make their way into RDR for BCD. –Illustrations and tables for improving the outlines of your system, if they are missing As a practical / pragmatic solution CCB suggests you (AG/GG) - –Submit Class-0 CCRs to CCB, as you submit draft RDR text + figs + tables to RDR editors (CCB chair happens to be one of them, BTW). –If you have questions on the adequate level of details to fill in (you usually should have some), consult CCB.

Valencia GDE Global Design Effort 21 “Missing Pieces” If you find some significant information pieces missing, i.e. important assumptions for RDR missing in the present BCD, –That does not necessarily mean that those missing pieces can stay missing from BCD, and they can stay out of configuration control for good. –Rather, it is quite likely to mean something else. –Of course, it is a case-by-case question. In case of “gray” situation, may we ask you AG/GG leaders to act as a responsible owner of your BCD chapter (if you own one), and, –Consult CCB. –CCB will work with you to find a way out.

Valencia GDE Global Design Effort 22 Cost Gain vs Performance Risk (1) The summary of GDE discussions at Snowmass 2005 "Notes from Decisions Meeting" states: –Q13: How much is a 1% change in average luminosity worth? –A13: Between 2 and 100 M$ While this indicates the level of analysis we had given this question 14 months ago, this "Decision" has a number of problems now. –No direction on when it is adequate to take 2M$/1% and when to take 100M$/1%; –Statement has not been really issued as an EC directive.

Valencia GDE Global Design Effort 23 Cost Gain vs Performance Risk (2) Therefore, the CCB feels that we need EC’s advice and guidance. EC might choose to take one of the following options, or generate others: –EC re-draft the guidelines, make them public within GDE, and provide them for the CCB to follow. –EC restate the Q13/A13 from Snowmass as CCB's basic evaluation guideline, make it public within GDE, and let CCB try its best to make a reasonable judgment (or recommendation) for each case, and let the guidelines grow as judicial precedents. At this moment here is this one open-guideline issue.

Valencia GDE Global Design Effort 24 This is all for today. Thank you for your attention THIS IS A SAMPLE