Disclosure of Preliminary Screening Staff package provided to MVEIRB prior to Board meeting MVEIRB informed of Board decision Decision issued three (working)

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Violet Camsell-Blondin Chair, Wekèezhìi Land and Water Board Zabey Nevitt Executive Director, Wekèezhìi Land and Water Board Aboriginal Consultation for.
What Small and Emerging Contractors Need to Know Understanding Dispute Resolution Options in the Construction Industry © Copyright 2014 NASBP.
Dispute Settlement Services offered by the WIPO Arbitration and Mediation Center Heike Wollgast, WIPO Arbitration and Mediation Center.
Maine Center for Disease Control & Prevention Radiation Control Program, Radon Section Radon Section Leader Maine DHHS, Radiation Control Program
Land Use Permit and Water Licence Procedures Working Group 6.
Conversation on the Chemical Facility Anti-Terrorism Standards (CFATS) and Critical Infrastructure Protection Chemical-Terrorism Vulnerability Information.
Doc.: IEEE /024 Submission January 2001 Jim Carlo, Texas InstrumentsSlide 1 Patents and IEEE 802 Stds IEEE 802 Chair’s Viewpoint Jim Carlo General.
WIPO ARBITRATION AND MEDIATION CENTER 1 Ignacio de Castro WIPO Arbitration and Mediation Center February, 2008 Arbitration of Intellectual.
Legislative Rule-Making Process. Three Different Processes Higher Education 29A-3A-1 et seq State Board of Education 29A-3B-1 et seq All other state agencies.
Learn. Perform. Succeed. Protest, Claims, Disputes and Appeals Chapter 7.
Time for a new standard - AS General Conditions of Contract
Procurement Lobbying Legislation New York State Bar Association December 9, 2005 (revised January 4, 2006)
CBER Managed Review Process Sheryl A. Kochman Deputy Director, DBA, OBRR, CBER September 15, 2009.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
Workers Compensation Commission Sian Leathem Registrar 29 September 2008.
CAMPUT 2015 Energy Regulation Course Donald Gordon Conference Centre Queen's University, Kingston, Ontario Role of Tribunal Staff, Interveners and Independent.
1 Pre-Hearing Conference November 6-10, 2011 Submissions of BIM on Process Issues.
Environmental Assessment in Newfoundland & Labrador Environmental Assessment in Federations: Current Dynamics and Emerging Issues Conference Current Dynamics.
Overview of Land and Resource Management in the NWT.
1 May 2007 Instructions for the WG Chair The IEEE-SA strongly recommends that at each WG meeting the chair or a designee: l Show slides #1 through #5 of.
Presented by: Heather Ward and Jason Cook Date: October 28, 2011 Presented by: > Proprietary and Confidential. For FAA Use Only. The Value of Private Loan.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
STRENGTHENING COMMUNITIES CONFERENCE LANDS ADMINISTRATION APRIL 12 th and 13 th YELLOWKNIFE.
TheRrole of the UN Commission on the Limits of the Continental Shelf Continental Shelf Outer Limit Workshop, Kuala Lumpur The Role of the UN Commission.
1 Supplemental Regulations to 34 CFR Part 300 Assistance to States for the Education of Children with Disabilities and Preschool Grants for Children with.
Public-Private Education Facilities and Infrastructure Act 2002 (PPEA) Joe Damico.
Disclosure of Preliminary Screening to MVEIRB In Nunavut all screenings are conducted by the Nunavut Impact Review Board (NIRB). NIRB conducts screening.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
Mackenzie Valley Standard Procedures & Consistency Working Groups Plan Review Process and Guidelines (PRPG working group)
LEGISLATIVE DEVELOPMENTS IN NATURE CONSERVATION AND HABITATS LAW IN 2011 Margaret Austin 29 March 2012.
Rabbanai T. Morgan Current as of 26 January 2006 Protests.
Doing Things Right: Implementing and Improving Co-Management in the NWT Willard Hagen Chair, Mackenzie Valley Land and Water Board Inuvik Petroleum Show.
Administrative Law The Enactment of Rules and Regulations.
Mediation with the Information Commissioner’s Office Cory Martinson Appeals and Policy Analyst 25 November 2009.
1 Kingsley Karunaratne, Department of Accounting, University of Sri Jayewardenepura, Colombo - Sri Lanka Practice Management.
Environmental Assessment in British Columbia Forum of Federations Conference September 14, 2009.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Investigational Devices and Humanitarian Use Devices June 2007.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
1 Application Process Gwich’in Land & Water Board WG 6 Document Review Prepared by Johnny Edwards.
Changes to Contested Case Hearing Requirements and Procedures Janis Hudson Environmental Law Division Texas Commission on Environmental Quality Advanced.
Responsibilities of Lead Agency Pages 7-8 of Training Guide 1. Preliminary review a) Determine if activity is a project as described by CEQA b) May require.
Rulemaking by APHIS. What is a rule and when must APHIS conduct rulemaking? Under U.S. law, a rule is any requirement of general applicability and future.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
Contestability Working Group Consultation Report and Recommendations NIE Networks / SONI Joint Presentation 26 January 2016.
GBLWMP-SLUP Integration February 5, 2010 Deline. Ecological Integrity Policy GBLWMPSLUP (a): All activities in the GBLW must be consistent with.
GBLWMP-SLUP Integration Meeting February 4-5, 2010 Sahtu Land Use Planning Board.
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
CONSULTATION GUIDELINES IMPLEMENTATION UPDATE June 2007.
Improving Compliance with ISAs Presenters: Al Johnson & Pat Hayle.
Phillipa Silcock Using and discharging conditions.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
AEMCPresentation to GWCFPAGE 1 AEMC and Rule changes Presentation to AEMO Gas Wholesale Consultative Forum Kamlesh Khelawan Director This presentation.
Charles University – Law Faculty October 2012 © Peter Kolker 2012 Class III
403(b) Plan Compliance: It’s 2009: Now what? Richard A. Turner Vice President and Deputy General Counsel The Variable Annuity Life Insurance Company (VALIC)
FIRE PROTECTION CONTRACTS Workshop on Senate Bill 239 (Hertzberg) July 21, 2016 Nevada LAFCo – Presented by P. Scott Browne, Counsel.
PCT-FILING SYSTEM.
Mason County School District
SDAB HEARINGS ROLE OF THE DEVELOPMENT OFFICER
Dispute Resolution Between ICT Service Providers in Saudi Arabia
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
OFFICE OF DISPUTE RESOLUTION
Monte Mills Alexander Blewett III School of Law University of Montana
SSA Adverse Decisions and Administrative Finality
Function of the International Court of Justice (ICJ):
Resolving Issues ADR, Due Process and CDE Complaints
POST-ISSUANCE COMPLIANCE
Presentation transcript:

Disclosure of Preliminary Screening Staff package provided to MVEIRB prior to Board meeting MVEIRB informed of Board decision Decision issued three (working) days after board meeting: as long as within legislated time period. Alternative arrangement discussed with MVEIRB if timeline is an issue.

Field Modification Board has no jurisdiction: Board issues amendments. Inspector has some authority to carry out modifications through permit or licence conditions. Or, section 86(1) and 86(2) of the MVRMA provides inspector authority to “order the permittee in writing such measures as deemed necessary” where the inspector has reasonable grounds to believe that: 1) a permittee is contravening the regulations or a condition of a licence. 2) a permitted use of land has resulted in, or is likely to result in an adverse effect on the environment.

Amendments Permittee and Licencees may apply to the Board for amendments. Review will depend on extent of application i.e., may require a hearing. All applications for amendments require distribution for review. All amendments are subject to preliminary screening. More attention needs to made on “scoping” of permits in order to not unreasonably restrict the potential for amendments.

Private Land vs. Crown Land Wek'èezhìi includes both private (mostly Tlicho) and Crown Lands. Proof of right of access to private lands is required prior to WLWB considering any application; i.e., an applicant must be eligible. Number of differences MAY occur in process because of Tlicho Laws or policy directions. – Possibility of “Type C” permits (Tlicho Agreement section & MVRMA section 90.1). – Consultation requirements are different (MVRMA sections 63(3) and 63(4)). – Tlicho Government can issue policy directions to the Board(s) that apply to Tlicho Lands (MVRMA section 83(2)).

Private Land vs. Crown Land In cases of water use, Board cannot issue, amend or renew a licence that will: “...significantly alter the quality, quantity or rate of flow of waters when on or flowing through Tlicho lands...” (MVRMA section 79.1) unless a compensation agreement is made between proponent and the Tlicho Government. WLWB has a role in resolving disputes relating to access to construction materials on Tlicho Lands in cases where applicant and Tlicho Government cannot agree to access conditions. (MVRMA section 80.1(4))

Use of TEK/TK Board endeavours to provide processes that solicits TK whenever possible. Board is required to consider: “any traditional knowledge...that is made available to it.” (MVRMA section 60.1(b))

Land Claim vs. Non-Settlement Areas More appropriately should be discussion of “Settled Groups” vs. “Unsettled Groups”. i.e., Unsettled groups (or even settled groups) still make assertions with settlement/management areas. – Example 1: Treaty 8, NWT Metis nation and NSMA all make assertions with Wek'èezhìi Management Area; including potentially section 35 consultation expectations. – Example 2: Settled groups, i.e., Tlicho, KIA still have consultation expectations within other settlement areas and unsettled claim regions. Note: Model has changed, new agreements have rights extending beyond “settlement” or “management” boundaries.

Review of Plans Reviews of Plans varies greatly may include: – Simple request for comments – Board technical review – Technical Workshop – Hearing – Board directed ToR and workshops prior to submission – Staff directed revisions Board decisions may include approval, conditional approval with conditions, or a directive to resubmit.

Review of Applications Land Use Permit – Application Received – Deemed Complete (includes assessment for eligibility) – Package for review developed and uploaded – Links for review distributed with timeline – Comments received – Staff report – Board review and Decision Preliminary Screening Land Use Permit – Time limits

Review of Applications Water Licence – Type A and B – Usually more complex – Timelines: Type B – maybe 60 days, Type A up to 2 years – Hearings often required – Technical workshops, intervention etc (more info later in presentation)

Land Use Conformity No Land Use Plans to date within Wek'èezhìi. A Land Use Planning Body within Wek'èezhìi is not provided for in the MVRMA. Tlicho Government is currently developing a Land Use Plan for Tlicho Lands...Federal Government responsible for the Land Use planning on crown lands portion of Wek'èezhìi.

Security Deposits For Land Use Permits: based on running security model: Minimum $5000. For Water Licences: discussion during hearing process. Board will contract expertise if required.

Use of Questionnaires Certain questionnaires required for water licence applications WLWB has adopted MVLWB questionnaires.

Deeming Applications Complete Applicant eligible, includes right of access to lands. Completed application form. Supporting documents as required/necessary. Pre-submission engagement carried out or Board approved exemption provided. Archaeological Search carried out for new LUP applications. Fees.

Legislation, Interpretation and Application WLWB interprets legislation as applicable. Legal Counsel used when necessary. Board has also solicited opinion of INAC, GNWT and Tlicho Government to provide advice on interpretation; however, Board retains right to interpret legislation as it deems appropriate.

Permits/Licences/Plans (Formatting) Examples of permits and licences available at

Access Agreements and Benefits Plan Requirement Right of access to private (Tlicho) lands required before an applicant can be considered eligible. May be Tlicho Access law, or right pursuant to chapter 18 or 19 of the Tlicho Agreement. Board has no requirement for an “access or benefit agreement”.

Reasons for Decision Required for water licence related decisions (NWT Waters Act section 26) and preliminary screening decisions. For Water Licences depending on issues and complexity issues will be either: i) Developed prior to Board meeting for review and approval by Board. ii) Developed following discussion of issues at Board meeting and approved at subsequent meeting. iii) On occasions Board authorizes Chair to finalize and approve Reasons for Decision.

Permitting in Communities WLWB required to process applications for permits within community Boundaries (MVRMA section 90.2). UNLESS “the local government has enacted a bylaw providing that one is not required for uses of that type.” No community government has enacted a by law of that type and therefore Board DOES permit in community boundaries. Note threshold for permits within community boundaries is much higher in communities.

Name Change vs. Assignment Both are acceptable to WLWB. Name change requires official (legal) confirmation of name change and submission of letter of request to the Board. Assignment process follows similar process to other Boards.

Expired Security Deposit

Water Use Fee Calculation As per NWT Water Regulations. Confusion exists on interpretation of legislation. Board has processed fees submitted in numerous ways. We will be following the following interpretation: For an industrial undertaking using 2500m 3 /day for 365 days/year the water use fee is calculated as follows: Greater of: Basis Water use fee: $30 OR Aggregate: For first 2000m 3 ($1.00 x 20) +for amounts between 2000m 3 and 4000m 3 ($1.50 x 5) = $27.50 Total Water Use Fee = $30 (as $30 > $27.50)

Type A or B Water Licence Process for Public Hearing Held according to requirements of NWT Waters Act (outlined in detail in other presentations). Three hearing processes to date. All Class A: two related to Diavik renewal, and one ongoing related to BHPB Closure and Reclamation Plan. Board uses hearings as needed to discuss and decide on major issues; not just to review applications. Hearings may be “written”.

Water Licence Process Submission of application / Determination of issue. Preliminary Screening Decision (if required). Initial Comments Technical Sessions Information Requests Pre hearing Conference Interventions Company Response to Interventions Procedural Rulings Hearing Commitments Board Decisions Post Hearing Process (i.e., Licence drafting and distribution.) NB: Written hearing proceedings are always possible and have been used,

Water Licence Renewal Largely follows same process

Water Licence Amendment Request Process dependent on scale, complexity and reviewer concern regarding request. May result in simple call for comments and possible cancellation of hearing (if required). Or, can result in mediated process producing Record of Agreement binding on partied, proponent and the Board. Or, may require full public hearing process.

Additional WLWB requires type B water licence for Uranium mineral exploration. Pre-submission engagement.