Western Irrigation Futures Customer Information sessions May 2010 Bacchus Marsh Irrigation District.

Slides:



Advertisements
Similar presentations
Government Abstraction Reform and Water ‘Rights’
Advertisements

The Murrumbidgee Irrigation Area (MIA) Infrastructure Modernisation  Improve delivery system efficiencies  Meet changing customer needs  Reduce asset.
David Purkey, SEI Rob Lempert, RAND
Stave Lake Water Supply & Treatment Project. Existing Water Supply System Norrish Creek Cannell Lake 19 Groundwater Wells.
Colorado River Basin Water Supply and Demand Study December 10, 2010.
Kindred North Motton Irrigation Scheme Landholder water sale 2 February 2012.
1 Irrigation Australia Conference 2014 MID2030 Modernisation Project’s OUTLET RATIONALISATION PROGRAM Ashley Oldham.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
An Assessment of the Efficiency of Water-Trading Markets in the Murray-Darling Basin James Smits Supervised by Professor Snow Barlow University of Melbourne,
MTF Rail Development Forum
University of South Australia – School of International Business Water Markets: Lessons From Australia Dr. Henning Bjornlund School of International Business.
The use and management of water in Goulburn Valley.
Cost-Benefit Analysis of Pipes and Risers Irrigation System in Northern Victoria, Australia Asia Climate Change Adaptation Project First Training in Economics.
Climate change impact on water resources Comoro islands are located in the Western Indian Ocean about 10 degrees south of the Equator and less than 300.
Andrew Scanlon Environment and Sustainability Manager Hydro Tasmania Drought and Climate Change.
Data for Irrigation Modelling Hector M Malano. Outline Modelling: what processes? What data gaps are there? Frequency of collection Level of disaggregation.
Water policy reform – moving ahead Presentation for the Water Policy in the MDB Workshop 22 October 2010 Will Fargher, General Manager Water Markets and.
1 Water in Bioenergy Agroecosystems Workshop Industry perspective on water for bioenergy production Alistair Wyness, BP International Group Water Expert.
Gas & Power Coordination: Growing Pains in Time of Transition Mark Stultz, BP Natural Gas Supply Association OPSI Annual Meeting Chicago, Illinois October.
The Environment Institute Where ideas grow Striking the Balance between Food and Fibre Production and the Environment Mike Young Executive Director, The.
Water savings in the Goulburn Murray Irrigation District T he journey from 2000 to 2012 Stephen Harding and Ian Moorhouse Irrigation Australia Conference,
Capacity Building in Analytical Tools for Estimating and Comparing Costs and Benefits of Adaptation Projects in the Berg River Basin, South Africa AIACC.
1 Recent and Emerging Water Policy Reforms in Australia Paper presented at National Taiwan University – Taipei 14 September 2006 Dr. Henning Bjornlund.
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
1 Water & Salinity Markets R. Quentin Grafton Crawford School of Economics and Government Australian National University Presented.
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
America’s Water Upmanu Lall water.columbia.edu.
IWRM as a Tool for Adaptation to Climate Change
In Confidence WESTERNPORT WATER COMMUNITY CONSULTATION WATER PLAN 2008 – 2013.
Prof. Mike Young Research Chair, Water Economics and Management The University of Adelaide “Water, wine and horticulture: A Scholefield Robinson Horticultural.
Future of the Columbia River Treaty A British Columbia Perspective 2014 PNWA Summer Conference Coeur d’Alene June 23, 2014 Kathy Eichenberger B.C. Ministry.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Resource Efficiency and the Blueprint to Safeguard Europe’s waters Henriette Færgemann, DG ENV Water Unit June 2011 Henriette Færgemann, DG ENV Water Unit.
Exploring the use of water pricing as a policy tool to improve water resource use efficiency in the agricultural sector FAO, OECD and IWMI Session: “Drops.
Thames Valley/Matatoki Water Supplies October 2012.
Rural - Urban Water Inter-Dependence Mike Young The University of Adelaide.
Prof. Mike Young Research Chair, Water Economics and Management The University of Adelaide Water Where is your future headed?
NATIONAL WATER RESOURCE STRATEGY SOUTH AFRICA’S WATER SITUATION AND STRATEGIES TO BALANCE SUPPLY AND DEMAND MIDDLE VAAL WMA.
Groundwater Reform in Australia An overview Groundwater Reforms in Australia and New South Wales New Delhi – September 2015.
Modernisation Implementation Lessons An Operational Viewpoint Geoffrey Enever Head of Customer Service Goulburn Murray Water DM#
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
A State approach to ensuring the long term viability of irrigated farming areas of Victoria Bryony Grice Manager Sustainable Irrigation.
1 Instruments for Adaptive Water Management R. Quentin Grafton Crawford School of Economics and Government Australian National University
DRAFT MURRAY DARLING BASIN PLAN. Where is the Murray–Darling Basin? Large system in south-eastern Australia 1 million km 2 1/7 area of Australia Contains.
Presentation overview Drivers leading to a future with less water Management of water resources in the MDB Water for the Future initiatives assisting.
Salinity and Bulk Water Workshop 27 October 2010 Werribee Irrigation District.
Prof. Mike Young Research Chair, Water Economics and Management The University of Adelaide NRM Committee, SA Parliament, 27 th February 2008 A future-proofed.
Western Irrigation Futures Customer Workshops. 2 What is the Western Irrigation Futures? Long-term strategic direction for the Werribee and Bacchus Marsh.
Managing Potential Pollutants from Livestock Farms: An Economics Perspective Kelly Zering North Carolina State University.
Ecologic.eu Brussels, 19 March 2009 Environmental & economic impact of water pricing and quotas in the agriculture sector What do we learn from practical.
Oakdale Irrigation District Agricultural Water Management Plan Briefing on 2015 Update January 5, /5/2016 OID AWMP Update Briefing.
The Environment Institute Where ideas grow Chewing over the CEWH Mike Young Executive Director, The Environment Institute.
Water Supply Planning in Hampton Roads: Options for an Uncertain Future The State of Virginia’s Water Resources October 28, 2015 Whitney S. Katchmark,
Slide 1 Oakdale Irrigation District Water Resources Plan “What We’ve Learned” October 2005.
BASIN SCALE WATER INFRASTRUCTURE INVESTMENT EVALUATION CONSIDERING CLIMATE RISK Yasir Kaheil Upmanu Lall C OLUMBIA W ATER C ENTER : Global Water Sustainability.
Draft example: Indicators for water supply reliability and storage projects Presented by Steve Roberts (Department of Water Resources, Storage Investigations)
California Water Plan April 14, 2005 Agricultural Water Use Efficiency Technical Analysis.
DEVELOPMENT OF AN IRRIGATION SCHEME FOR THE MANJIMUP REGION 17 MARCH2016 PAUL ELLERY SENIOR PROJECT MANAGER – TASMANIAN IRRIGATION.
Modeling with WEAP University of Utah Hydroinformatics - Fall 2015.
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
Gas Stakeholder meeting for the IM review and DPP reset 8 December 2015.
Water Reclamation Plant Feasibility Study Update July 23, 2014.
1 ST Market Engagement Session 3 rd October 2014 RE-PROCUREMENT OF CUSTODIAL TENANT DEPOSIT PROTECTION SCHEME Presentation by Ruth Hayes.
Successful places with homes and jobs A NATIONAL AGENCY WORKING LOCALLY Housing Finance Conference 20 March 2014 Investing in new homes in 2015 and beyond.
water Water Trading: Supporting resilient regional communities
Perin Davey, Corporate Affairs, Murray Irrigation Limited
Place your logo here WERRIBEE RIVER
A future-proofed MDB? Prof. Mike Young
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
Presentation transcript:

Western Irrigation Futures Customer Information sessions May 2010 Bacchus Marsh Irrigation District

2 Today’s discussion… 1.Feedback from customer workshops and surveys 2.Key findings from WIF –Bulk water options –Infrastructure options investigated –On-farm management practices 3.Future water supply –Longer term –Next season 4.Next steps –Customer reference group

3 Recap… WIF Atlas Customer Consultation Technical Workshops Draft Options Paper Detailed Technical Work Bulk WaterEnvironmentInfrastructureOn farm Final Options Paper Customer engagement and consultation Government / Agency consultation Today’s discussion

4 1. Customer Feedback

5 What you told us you would like… Key issues –Secure source of water –Sufficient volume to support historic production levels –Water at affordable price –Make recycled water available, and –Fix leaky channels Other concerns raised –Farming viability –Agricultural practices –Future of the district And, we gave a commitment to keep you informed

6 2. Key Findings: Bulk Water Supply Options

7 Bulk water options investigated River water supply Trading options –Connection to Goldfields super pipe Supply to Pykes Creek reservoir Supply direct to Bacchus Marsh Reinstate Central Highlands Scheme –North/South pipeline –Macalister Irrigation District Metro water –Accessing water from the Melbourne pool Government announced access to 3,000ML for BMID Recycled water –Supply from WTP –Caroline Springs –Other sources Groundwater –Increasing bore numbers (allocation) –Accessing deeper aquifer

8 River water supply – climate scenarios… Lerderderg River Seasonal Inflows (at Sardine Creek)

9 Goldfields Superpipe 760 mm diameter pipe –Urban supply for Ballarat –Water from Goulburn system via pipe to Bendigo Pipe route located near top of Werribee catchment 3 options –Pipe to upper Werribee –Reinstate Central Highlands scheme –Pipe to BMID

10 Central Highlands Scheme Operated in 1962 Operation refused in 1967 Transfers water along Moorabool catchment

11 Trading options… Purchase Goulburn Water Pay transfer cost through via Bendigo and Goldfields Super pipe Build connecting infrastructure OptionCapital Cost Key issue$ per ML Reinstate Central Highlands Scheme $4.5 mHigh water loss$2,150 Supply to Upper Werribee$15.2 mHigh water loss$2,200 Supply direct to Bacchus Marsh$65 mHigh capital cost$3,000

12 Trading options… North South Pipeline –Government committed to maximum 75,000 ML/year cap –Commitment to Northern Irrigators that this would be maximum amount –Option to access water from northern Victoria not available MID – Thomson Dam –11,000 ML Entitlement on key rivers in the MID (trading zone) –30% can be transferred across the system –Water must be purchased and water transferred through district. –Cost to transfer is $745 per ML for 2009/10. –Limited flow rate and timing of delivery

13 Metro water supply… Available to access up to 3,000ML per year Delivery via Western Water’s urban water supply system Contract details –Supply by Agreement (Entitlement) with City West Water to SRW –Delivery agreement with Western Water Access and pricing arrangements reviewed every five years Price structure set by Essential Services Commission (ESC) Same structure for all water authorities

14 Other Options… Recycled Water –Caroline Springs Option no longer available commitments made elsewhere in investment and usage and has high operating cost –Bacchus Marsh Fully contracted by Western Water and Fully committed in the future –Western Treatment Plant Not economic – $50m pipe/pump investment plus Cost to expand Class A plant Groundwater –Merrimu – full allocated, hydro assessment no further water available –Parwan – full allocated, hydro assessment no further water available –Other – accessing groundwater elsewhere and pipeline to BMID is capital intensive and high risk

15 2. Key Findings: Infrastructure Options

16 Infrastructure options …. Pipelining –Piping from weir technically difficult due to flat grade –Large pipes and low velocities –Uncertainty if some existing pipes can take higher pressure –Not costed Channel lining –Lining of Werribee Vale Road channel unfeasible due to silting –Liners damaged with silt removal Balancing Storage (320 ML) –Cost $6.2m, plus –2 kilometre transfer pipe $1.5m Reconfiguration… –Suggested at first workshops –Focus on upgrading parts of the supply system –Improve operational flexibility and reduce delivery losses

17 Infrastructure Options Section 6 – Balancing Storage Transfer Pipe Cost - $1.5M - Plus balancing storage cost approx $6.2m Section 1 – Werribee Vale Road Pipeline Cost - $2.4m Section 7 - Channel lining from siphon to spur 12 cost approx $2.8m Section 3 – Upgrade connection 2/2 to 5 Cost - $150k Section 4 – Pipe section of spur 12 Cost - $1.4m Section 2 – Abandon 10/5 Channel Total upgrade cost estimated $12.9m (assumes main channel mothballed) If option to include lining then section 5 & 3 are not needed. Section 5 – Connecting pipe spur 3/12 Cost - $1.26m

18 Infrastructure options …. Reconfiguration option 1 – cost $12.9m –Interconnection of existing pipelines –Pipelining supply to Werribee Vale Road customers –Mothballing main channel –Balancing storage and transfer pipe –Pipe section of spur 12 –Expected efficiency 85% – 90% Reconfiguration option 2 – $14.3m –Pipelining supply to Werribee Vale Road customers –Balancing storage and transfer pipe –Pipe section of spur 12 –Channel lining from siphon to spur 12 crossing –Expected efficiency 85% – 90%

19 2. Key Findings: On-farm issues

20 On-farm issues addressed… Commercial considerations –Cost of production –Choice, mix and rotation of crop types –Scale of operation and constraints –Land values, planning regulations and impacts of development on farming Water resource availability –Security of water supply to grow crops –Scope to reduce water use by utilising other irrigation methods Agronomy and water quality –Identification and costing of best practice requirements for irrigation, soil salinity and nutrient management Environmental implications –Understanding of potential impacts on environmental assets Social factors –Social, cultural, adoption of technology, management practices and business decisions

21 3. Future Water Supply

22 Future supply options… Government announced access to 3,000ML of metro water Access limited to 10ML/d flow rate with possible reduction during peak demand days Addition of balancing storage would provide ability to increase up to 20 ML/d during summer on limited days Supply may include a mix of river water (when available), and metro water to maximise supply and flow rate and minimise losses

23 Water availability – 2011/12… Water outlook 1 July 2010 –River water allocation likely to commence at 6% Based on zero inflows and no deliveries –Emergency water supply not used by 30 June 2010 to be re- allocated Supplementary options –Access a volume of the metro water for next season Price is $1,357 per ML –Potential trading Options Macalister trading Trading with Werribee (if water balance OK)

24 BMID water balance – 2009/10 *Remaining river water based on 14% allocation –

25 BMID estimated water balance – 2010/11

26 Effective charges including usage from Metro system …

27 4. Next steps

28 Consultation process… Establish Customer Reference Groups –Separate groups for WID and BMID Seek nominations –1 WBMCCC for each group –6 customer representatives for each group –Stakeholder representatives Appoint independent chair Terms of reference to include –Bulk water supply options –Pricing matters –Infrastructure issues (e.g. channels and storages) –Environmental matters –Contract matters (metro water supply)