Overland Pass Pipeline January 2008. 2 About ONEOK/ONEOK Partners ONEOK is general partner and 45.7 percent owner of ONEOK Partners ONEOK was founded.

Slides:



Advertisements
Similar presentations
Presentation to the Wyoming Pipeline Authority Update on Kinder Morgan’s Oil Springs Storage Field Expansion Project March 23, 2004.
Advertisements

Informed Planning Near Pipelines Brought to you by a Community Technical Assistance Grant from the.
G LASGOW R EGIONAL L ANDFILL M ETHANE R ECOVERY TO E LECTRIFICATION P ROJECT GOVERNOR’S ENERGY CONFERENCE By Mayor Rhonda Riherd Trautman.
August 2014 Southeast Reliability Project. 2 Dominion Profile: Power and Natural Gas Infrastructure Leading provider of energy and energy services in.
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
How Williams approaches a project from a Land Perspective Presented by: Patrick McClusky, Senior Land Representative.
City Transportation Funding Overview House Transportation Committee January 13, 2004 Ashley Probart AWC Transportation Coordinator.
0 Addison Natural Gas Project Hinesburg Selectboard May 21, 2012.
American Petroleum Institute Energy Community in Depth December 3, 2014.
A Study in Sustainable Tourism The Haw River Trail.
Shelley A. Wright Wyoming Pipeline Authority January 27, 2004 Expansion Projects Update.
Kansas Economic Development Alliance October 2012.
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
 Hartsfield–Jackson is ranked as the world's busiest airport, both in passengers and number of flights.  In 2011 it accommodated 92 million passengers.
Southern Star Central Gas Pipeline, Inc August 31, 2005.
Mark Kempic President Columbia Gas of Maryland, Inc. Maryland-District of Columbia Utilities Association Fall Conference Fueling the Economic Engine.
All rights reserved. Enterprise Products Partners L.P.1 Why Natural Gas Liquids are Important to the Wyoming Natural Gas Industry or Support Your Local.
Show-Me Recycling The Missouri Recycling Association’s statewide education campaign that showcases sustainable programs that improve the economy and community.
Florida Gas Transmission Section #2 Hydrostatic Test 14-Inch Saint Petersburg Lateral Pipeline From Tampa By-Pass Canal to East of Lake Magdalene Hillsborough.
Etowah County Alabama. Etowah County has been selected to be the first site in Alabama for a wind energy farm. Pioneer Green Energy is the developer The.
1 Questar Pipeline Current Capacity and Development Shelley A. Wright Director, Business Development May 15, 2007 Wyoming Pipeline Authority Meeting.
Rockies Alliance Pipeline Wyoming Pipeline Authority Meeting Casper, Wyoming October 21, 2008 Gaylen Haag.
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective Leadership Wyoming Class of 2005 Gillette, WY October 21,
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective Wyoming Geological Association Conference Prepared: July 26,
Wyoming Pipeline AuthorityWyoming Pipeline Authority Casper, Wyoming | May 15, 2012.
April 23, 2013 NATIONAL COAL CONFERENCE Chairman Robert F. Powelson Pennsylvania Public Utility Commission.
Oil and Wind Energy: North Dakota Update Dr. Cole Gustafson Feb. 9, 2011.
Western NC Wind Capacity ASU Energy Center after all exclusion zones: 3,150 MW in west (8% of NC electricity from 2100 turbines) ASU Energy center identified.
1 Utility Ownership of Wind Power: Why it makes sense now American Wind Energy Association May 17, 2005 Eric Markell Senior Vice President Energy Resources.
Lorelei H. Oviatt, AICP Director Kern County Planning And Community Development Department August.
Risks and realities of a project and why we must stop it!
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Florida Gas Transmission Section #1 Hydrostatic Test 14-Inch Saint Petersburg Lateral Pipeline From Compressor Station 30 (Plant City West) to Main Line.
Risks and realities of a project. Impacted GA Counties: - Stewart (Lumpkin), Webster (Preston)StewartWebster - Terrell (Dawson), Lee (Leesburg)Terrell.
Page 0 WYOMING’S NATURAL GAS – At a Glance October 26, 2004.
ISAC Fall School November 30, 2012 Iowa’s Wind Energy Industry & Economic Impact.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
Revisiting the Economic Impact of the Fayetteville Shale Kathy Deck, Director Center for Business and Economic Research June 7, 2012.
Overland Pass Pipeline. About Overland Pass Pipeline Approximately a 750-mile transmission pipeline Originates in Opal, WY and ends at Conway, KS Traverses.
Wyoming Natural Gas Pipeline Authority Wyoming State Emergency Response Commission, January 20, 2006, Cheyenne, WY Presented by Colby Drechsel, Technical.
Florida Gas Transmission 16-Inch Section#2 Hydrostatic Test
Wyoming Pipeline Authority October 28, 2003 Mark Quinlan Director Marketing. Mark Quinlan Director Marketing.
Informed Planning Near Pipelines Brought to you by a Community Technical Assistance Grant from the U.S. Dept of Transportation.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Sustainable Energy Utility B.C. Ground Water Association March 30 th,2007.
Regulatory Reform to Support New Infrastructure Steve Kidwell MARC 2010 June 7, 2010.
Informed Planning Near Pipelines Brought to you by a Community Technical Assistance Grant from the U.S. Dept of Transportation.
Entrega Project Update Wyoming Natural Gas Pipeline Authority – August 30, 2005 Entrega Gas Pipeline Inc.
Wyoming Pipeline Authority January 24, Rockies Production Growth.
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective.
Bryan Hassler, Executive Director Society of Petroleum Engineers January 21, 2004 Rock Springs, WY.
Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve B) to US-19 North of SR 688/Ulmerton.
The Missouri Department of Transportation 2007 Update.
Natural Gas and Energy Reform Legislation Steve Crout Managing Director, Government Affairs American Gas Association.
Presentation title | Date. Who We Are Building a Healthier Heartland (BHH)  Super-coalition of local and national partners that promotes policy, systems.
 Project Capacity: 54 MGD  Water Purchase Agreement: 30-year take-if-delivered contract with San Diego County Water Authority for water purchase of.
Rocky Mountain Production and Pipeline Capacity 2004 BLM National Fluid Minerals Conference June 24, 2004.
PROTECTING THE PARTNERSHIP. Purpose ■How changing the rules for the Woodlands will impact our community partners.
Entrega Gas Pipeline Project Wyoming Natural Gas Pipeline Authority - August 24, 2004.
The Pipeline Safety Trust “Restoring Trust In Pipeline Safety” New Orleans, LA November 2-3, 2006 Nate Muehl Damage Prevention & ROW Relations Manager.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Dominion Dan Weekley Vice President, Corporate Affairs Dan Stoddard Senior Vice President, Nuclear Operations March 24, 2016.
Tunica Metro Mega Site ENTERGY QUALIFIED SITE Strict standards of qualification Factors identified as important Best possible conditions for a company.
Showcase cost-saving practices, scale- appropriate technologies, and economic development opportunities and case studies from Idaho communities. Provide.
September 2014 Atlantic Coast Pipeline. 2 Dominion’s Core Values Safety Ethics Excellence One Dominion.
Atlantic Coast Pipeline NCEDA MidWinter Conference March 9, 2016.
Atlantic Coast Pipeline Fayetteville Regional Association of Realtors March 15, 2016.
DAPL Dakota Access Pipeline. DAPL Need to Know 1,172 mile pipeline, 30 inches in diameter Connecting the North Dakota oil fields to refineries across.
Dakota Pipeline By: Parth and Shivam.
Presentation transcript:

Overland Pass Pipeline January 2008

2 About ONEOK/ONEOK Partners ONEOK is general partner and 45.7 percent owner of ONEOK Partners ONEOK was founded in 1906 as a natural gas pipeline from Tulsa to Oklahoma City Fortune 500 company –Most admired energy company ONEOK: One of largest natural gas distributors in U.S. ONEOK Partners: leader in natural gas and natural gas liquids Values: Operate in a safe and environmentally responsible manner Legacy of community involvement

3 Project Summary Approximately a 760-mile transmission pipeline Originates in Opal, Wyo., and ends at Conway, Kan. Traverses 23 counties in 3 states 90 percent of route follows existing utility corridors Transports natural gas liquids (NGLs) Approximate $433 million capital investment 14- and 16-inch diameter pipe (varies) Buried minimum of 3 feet below ground Startup pipe capacity range: 110, ,000 barrels per day

4 Local Economic Impacts WYCOKS Miles of pipe Annual tax revenue$2.2 million$2.6 million$3.6 million Capital investment$215 million$98 million$145 million Construction payroll$17.6 million$10.4 million$15.3 million

5 Landowners by state Properties crossed: –Wyoming – 134 landowners; –Colorado – 251 landowners; –Kansas – 667 landowners.

6 Construction Progress as of Dec. 31, 2007 SpreadWorkforceWork DaysWelds TOTAL

7 Looking east toward Arlington Ridge - Wyoming

8 Overall Progress (Welding)

9 Key Accomplishments as of Dec. 31, 2007 –Major River Crossings Completed Blacks Fork - 2 Crossings Green River Medicine Bow North Platte –Other Major Crossings I-80 I-25 Cheyenne Hub & Hwy 85 –Completed Data Recovery at WY Arch sites and received NTP for those sites –Completed 66 of 124 miles of BGWR area –Construction production on a good week is in excess of 35 miles

10 Blacks Fork River Crossing

11 Green River Crossing

12 North Platte River Crossing

13 Key Concerns –BGWR variances denied beginning Dec 1 –No BGWR variances in effect after Dec 15 –Unless we work something out with BLM the BGWR areas are closed to construction activity until 5/1/2008.

14 Rawlins Wood Water Pipe

15 Piceance

16 For More Information Visit or (877) –Latest updates about the project –Links to educational documents about the Natural Gas Industry ONEOK Partners contacts: –Steve Johnson, (913) , (785) or –Megan Washbourne, (918) or