Poinsett County Erosion Control Project St. Francis and Little River Watersheds Project: SGA 296.

Slides:



Advertisements
Similar presentations
FARM SERVICE AGENCY Conservation Reserve Program Conservation Reserve Program.
Advertisements

ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Fiscal Year-End Procedures. Bill Paying: Voucher entry for fiscal year being closed extended two weeks into July Voucher date very important for GL posting,
Oklahoma Department of Transportation Susan McClune Regulatory Services.
Evaluating Bids in the U.S. Conservation Reserve Program Ralph E. Heimlich Deputy Director for Analysis, Resource Economics Division, Economic Research.
Listed on 303(d) list Organic enrichment causing depleted oxygen levels. Not sustaining the designated use for aquatic life because of low dissolved oxygen.
January 30, Associate Membership Non-Profit$ Business$ Assistance with grant funding & grant administration Assistance with economic.
THE NORTH CAROLINA AGRICULTURAL WATER RESOURCES ASSISTANCE PROGRAM NC Water Resources Congress October 30, 2014.
CROSS COUNTY L’ANGUILLE RIVER WATERSHED WATER QUALITY PROJECT Project # July 1, 2012-June 30, 2015.
A partnership between Wise Soil and Water Conservation District, Wise County Water Control and Improvement District #1, Wise County Commissioners Court,
Grant Reporting. How do you feel about Grant Reporting?
Lucia Machado, NPS Coordinator.  Under Section 319 of the Federal Water Pollution Control Act (Clean Water Act) ◦ Part (h) provides the grant program.
American Recovery and Reinvestment Act of 2009 ARRA Reporting Requirements April 14, 2009 Webinar.
Water Conservation, Reuse and Storage Grant Program.
Darren Carlson District Manager Kittson Soil and Water Conservation District (SWCD) 410 South 5 th Street, Suite 106 Hallock, MN (218)
Federal Acquisition Service U.S. General Services Administration Linda Hosey Customer Service Director
Preventing Nonpoint Source Pollution
Ag Water Metering Program Since 2004, over 11,500 water meters have been placed in all counties south of the Fall line. Data from these meters is being.
Additional Structure Exercise 2 ANSWERS NB. As not whole case study was given some of these answers may not be within the text.
Contact Laura Speaker at or with any questions
NRCS Programs Provide Biofuel and Biomass Opportunities for Producers Switchgrass harvest for biofuels, Photo: NRCS Iowa.
United States Department of Agriculture Mississippi River Basin Healthy Watershed Initiative Illinois River and Eucha-Spavinaw Watershed Initiative Bayou.
3 CDBG Disaster Recovery Workshop Tuesday, March 20, 2012.
Izard County Conservation District Arkansas Natural Resource Commission U.S. Environmental Protection Agency.
APPLYING CONSERVATION TO THE TEXAS LANDSCAPE Norman Bade, NRCS State Resource Conservationist Conservation Provisions of the 2002 Farm Bill (Farm Security.
1 Natural Resources Block Grant (NRBG) A Program that works to: – Streamline assistance and $$ to landowners – Coordinate activities of federal and state.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke.
Our Mission Helping people help the land. NRCS Natural Resources Conservation Service Our Vision Productive Lands ---- Healthy Environment.
LOWER L’ANGUILLE WATERSHED COST SHARE PATRICIA PERRY ST. FRANCIS COUNTY CONSERVATION DISTRICT.
What is the Chesapeake Bay TMDL? Total Maximum Daily Load –Amount of pollutants that a water body can receive and still support designated uses Drinking,
Sediment & Nutrient Management in the L’Anguille River Watershed St. Francis County Cost Share Project Patricia Perry St. Francis County Conservation.
Former DuPont Barksdale Works Project Update October 5, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
NPS Program Funded Success Stories September 17, 2014 Arkansas Natural Resources Commission Tony Ramick, Supervisor NPS Management Program.
Click to add text Dealer Pre-Qualification Information Session STATE OF MICHIGAN Department of Technology, Management and Budget Purchasing Operations.
Conway County Conservation District PO Box Shady Lane Morrilton, Arkansas
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
C-4 Canal Bank Improvements Belen Phase 2 Flood Protection Berm & Wall John Mitnik, P.E. Engineering & Construction Bureau Chief John Mitnik, P.E. Engineering.
A Project to Reduce Bacteria in Texas Waterways: Lone Star Healthy Streams Larry A. Redmon 1, Kevin L. Wagner 2, Robert K. Lyons 3, and Garrett Norman.
Listed on 303(d) list Organic enrichment causing depleted oxygen levels. Not sustaining the designated use for aquatic life because of low dissolved oxygen.
CENTURY 21 ACCOUNTING © 2009 South-Western, Cengage Learning LESSON 1-3 Journalizing and Posting Cash Payments.
7 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2001 BG 16 P PE 006 Wastewater Collection and treatment located in Pazardjik, Republic.
Illinois Green Infrastructure Grant Program (IGIG) ABC’s and 123’s of Illinois EPA’s newest grant program Jan Carpenter Illinois EPA
Keeping Business Record. What are quarters in accounting? January – March is the 1 st quarter April – June is the 2 nd quarter July – Sept is the 3 rd.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4082/EN Design, Supply, Installation and Commissioning of the ventilation of the BAF3.
Project # /01/ /30/2011.  The Cross County Erosion Control Project is located on the East side of Arkansas. Portions of the L’Anguille.
System Conservation in Wyoming Steve Wolff Wyoming State Engineer’s Office.
Presented By: Boone County Conservation District.
Lower L’Anguille Watershed Cost Share – Phase III Patricia Perry, St. Francis County Conservation District.
Riparian Forest Buffers Buffers Wetlands Restored Wetlands Grass Filter Strips Windbreaks.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
Regional Conservation Partnership Program Partnership Information Sherre Copeland, Partnership Liaison.
Discussion of the Differences Public Works Law and Bid Law
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Request for Proposals For Banking Services CMU
Chesapeake Bay Program Budget & Finance Workgroup Meeting
Texas Water Resources Institute
Asset Acquisition Process
Audit Requirements, Risk and Anti Fraud
PPL1.6 Pumping Plant Project Overview
Audit Requirements, Risk and Anti Fraud
Southfork of the Spring River Sub-Watershed Project ( )
Boone County Beaver Reservoir Watershed Project
NATURAL RESOURCES CONSERVATION SERVICE
STRAWBERRY RIVER IMPROVEMENT PROJECT
Crittenden County Erosion Control Project
Fulton County Conservation District
CROSS County L’Anguille River Watershed water quality project
Boone County Beaver Reservoir Watershed Project
3 CDBG Disaster Recovery Wastewater/Drinking Water
Presentation transcript:

Poinsett County Erosion Control Project St. Francis and Little River Watersheds Project: SGA 296

Why we applied to do this project: Landowners saw a need to help to protect water quality in the St. Francis and Little Ditches Watershed Areas. The Poinsett County Conservation District approached the Arkansas Natural Resources Commission and learned about funding to help with this project.

Project Goals/Objectives: The purpose of this project is to purchase pipe and pipe supplies that will reduce erosion, therefore reducing sediment and nutrients from entering impaired water bodies, thus enhancing water quality. This will be accomplished by controlling the transmission, transference, recovery and reuse of water by use of drop pipe structures. Reducing or minimizing the amount of time water passes over the ground surface reduces the likelihood of erosion (i.e., sediment and nutrient transport).

Summary of Funds Funds provided by EPA $105,000 Funds provided by the District (Cash or in-Kind)$105,000 TOTAL PROJECT COST$210,000

Supplies Ordered

Getting Started Advertise – The project was advertised in local newspapers, newsletters were sent and flyers posted within the county – A date was set to begin and close application sign-up Applications – Applications were taken from customers Maps – Maps of the project were printed and customers marked the locations where pipes would be installed Technical Assistance – The customer discussed size of pipe and length best suited for the project with the NRCS Technician

Getting Started continued Bids – Bid sheets were submitted to eight pipe contractors – The bids were submitted to Arkansas Natural Resources Commission Contract – A contract was awarded to the lowest bidder Invoice – An invoice was submitted to the customer stating they have ten days to respond with payment. Pipe Ordered – After all invoices were complete, the pipe was ordered

Schedule of Task and Outputs: Solicit BidsApril 2010 – May 2010 Purchase PipeMay 2010 – July 2010 Install PipeJuly 2010 – June 2012 Collect GPS CoordinatesJuly 2010 – June 2012 Quarterly ReportsApril 2010 – December 2012 Annual ReportsApril 2010 – December 2012 Annual Project ReviewApril 2010 – December 2012 Final ReportApril 2010 – December 2012

Map of Project Area

Accomplished to date: All pipes and risers have been picked up 20% have been installed Hope to have 50% installed in the next few months Positively received by customers

Thank You Presented by: Poinsett County Conservation District