UNNExT Capacity Building Workshop on Single Window Planning and Implementation Module 11 – Summary & Conclusions Authored by Dr. Somnuk Keretho UNNExT.

Slides:



Advertisements
Similar presentations
Establishing a National Working Group on Trade Facilitation Challenges and Lessons Learned Presented by Elizabeth Tamale Ministry of Tourism, Trade and.
Advertisements

State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Stakeholder Coordination - Thailand NSW Case -
Enterprise Resource Planning
TRADE. Bringing Practical Tools To Trade Development and Integration In Europe, the Caucasus and Central Asia.
Towards An ‘Electronic Trading Platform’ March 18, 2006 Pakistan Electronic Trading (PAKET) Network Mohammed Imani Executive Director Sidat Hyder Morshed.
Role of RAS in the Agricultural Innovation System Rasheed Sulaiman V
UNNExT Capacity Building Workshop on Single Window Planning and Implementation Module 8 – Project Management Phase 3: Planning Phase (High-level master.
3 rd Executive Forum on Trade Facilitation Paperless Trade in International Supply Chains: Enhancing Efficiency and Security Technology as Enabler of Innovation.
Logistics 10 February 2012, Brussels Transport E-Freight Conference 2012 ICT for transport logistics in a White Paper context: Paperless multimodal freight.
Trends and Developments in Single Window UNECE UN/CEFACT New Delhi, 29 October
“Trade Facilitation in the WTO Context” High-Level Policy Segment of the Committee for Trade, Industry and Enterprise Development United Nations Economic.
UNECE Capacity Building Programme and Tools UNNExT: Networking for Efficiency in Cross Border Trade.
Dubai Government Policies for Enhancing the Competitiveness of Multimodal Transportation and Logistics Cluster June 2014.
U NITED N ATIONS C ENTRE F OR T RADE F ACILITATION A ND E LECTRONIC B USINESS United Nations Economic Commission for Europe UN/CEFACT The UN/CEFACT Vision.
Enterprise Architecture
WCO Economic Competitiveness Package “Symposium on WTO Trade Facilitation for African Countries” Nairobi, Kenya November 2012.
Simplification and automation for Greek Fresh Fruit and Vegetable Exports - Athens, May
UNNExT Capacity Building Workshop on Single Window Planning and Implementation Module 4 – SW architecture-based Implementation Framework (SWIF) Supported.
Trade Facilitation Journey - Pathway, Best Practices and Lessons Learnt – SW Stepwise Roadmap Somnuk Keretho, PhD Director, Institute for IT Innovation.
1 Status Survey for Training and Consulting Funding issues For HoD whose country/economy wants to make request to the AFACT Secretariat for training/consulting.
Trade Facilitation: Benefits to Business Dr. Carol Cosgrove-Sacks Director, Trade United Nations Economic Commission for Europe (UNECE) CTIED, 26 May 2005.
WCO Economic Competitiveness Package
GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)
Markus Pikart Trade and Timber Division, UNECE Shamika Sirimanne Trade and Investment Division, ESCAP 6th Tranche UN DA: Enhancing Trade Efficiency through.
International Supply Chain Reference Model and its role in Trade Facilitation & Standardisation TBG14 Presentation.
UN/CEFACT Plenary Session, September 2008, Geneva UNESCAP’s Approach to Trade Facilitation Dr. Ravi Ratnayake Director Trade and Investment Division.
UNNExT Capacity Building Workshop on Single Window Planning and Implementation Module 7 – Project Management Phase 2: Elaboration Phase (Detailed Feasibility.
CEFACT CEFACT/TBG2 United Nations Electronic Trade Documents Digital Paper for Trade UNECE Geneva, March 2006.
ASYCUDAWorld - A suitable IT system for an electronic Single Window Livingstone, June 2013 John David
UNNExT Capacity Building Workshop on Single Window Planning and Implementation Module 9 – Project Management Phase 4: Implementation Oversight Phase Project.
UNNExT Capacity Building Workshop on Single Window Planning and Implementation Module 3 – Single Window Roadmap Authored by Dr. Somnuk Keretho UNNExT Advisory.
Standards in the world of E-business Harm Jan van Burg Ministry of Finance The Netherlands UN/CEFACT Vice Chair for international cooperation.
European Broadband Portal Phase II Application of the Blueprint for “bottom-up” broadband initiatives.
The Single Window: benefits from an advanced trade facilitation tool and UN standards for a transition economy Slavica KUTIROV Customs.
February 2006UNeDocs Overview Michael Dill / GEFEG mbHSlide 1 What is this specific TBG2 project about? What is CEFACT TBG2 ‚ Digital Paper? What is the.
An Integrated Approach to LED Promotion and the Critical Role of Local Government Challenges & Opportunities CLGF Energising Local Economies: Partnership.
UNNExT Capacity Building Workshop on Single Window Planning and Implementation Module 5 – Single Window Project Management Process Authored by Dr. Somnuk.
UN CEFACT Single Window Recommendation Simplifying International Trade Gordon Cragge Chair – International Trade Procedures Working Group (TBG 15 of UN.
THE WORLD BANK World Bank Group Multilateral Investment Guarantee Agency Rapid Response Toolkit Module II Trade Logistics Deep Dive Washington DC, April.
RacWEB Conference, E-CUSTOMS INITIATIVES IN WESTERN BALKAN COUNTRIES Viktor Hristov.
UNNExT Capacity Building Workshop on Single Window Planning and Implementation Module 1 – Introduction to the workshop UNNExT Capacity Building Workshop.
UNNExT Capacity Building Workshop on Single Window Planning and Implementation Module 2 – The Vision Improving Import/Export Procedures and Documentation.
Advance Cargo Information Guidelines Advance Cargo Information Guidelines Ray Mc Donagh Deputy Director World Customs Organization Geneva Nov 2003.
Virginia Cram-Martos, Directora División de Comercio y Maderas Comisión Económica para Europa WELCOME UN/CEFACT OVERVIEW 16 September 2008.
UNECE working in partnership with NTB Focal Points Lorenza Jachia United Nations Economic Commission for Europe.
Integrated Management of Trade Information Flows: What must a country do? United Nations Economic Commission for Europe Mario Apostolov, Regional Adviser,
1 VGIN’s GIS Strategic Plan Dan Widner VGIN Advisory Board Meeting January 6,
UN/CEFACT UNECEUNECE 3 rd Executive Forum on Trade Facilitation Paperless Trade in International Supply Chains: Enhancing Efficiency and Security Geneva,
Stakeholder Coordination in Implementing a Single Window EDICOM 2012 Conference 22 November 2012 Tehran, Islamic Republic of Iran Sangwon Lim Trade Facilitation.
Update on ESCAP Work on Trade Facilitation and implementation of the ROC-TF mechanism Regional Organizations Cooperation Mechanism for Trade Facilitation.
OASIS Workshop, Brussels January 19 th © 2009, World Customs Organization Customs Role in Cross Border Exchanges “Customs in the 21 st Century”
1 Trade Facilitation in ESCAP International Conference on Trade Facilitation, October 2006, Moscow, Russian Federation. Noordin Azhari Chief Trade.
UNECE CAPACITY BUILDING WORKSHOP ON TRADE FACILITATION IMPLEMENTATION: TOOLS, TECHNIQUES AND METHODOLOGIES 18 – 20 October 2004, Geneva Single Window Development.
19-20 October 2010 IT Directors’ Group meeting 1 Item 6 of the agenda ISA programme Pascal JACQUES Unit B2 - Methodology/Research Local Informatics Security.
GEO Implementation Mechanisms Giovanni Rum, GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
1 Two AusAID-funded Projects – NLA Benefits & e-Port Linkages Economy: Australia 35th APEC Transportation Working Group Bangkok, Thailand February 20-24,
Training Workshop on Business Process Analysis in International Trade Joint Workshop on Trade Facilitation and the Single Window September 2015,
UNECE – United Nations Economic Commission for Europe UN/CEFACT – UN Centre for Trade Facilitation and e-Business Session 6B Business Process Analysis.
CARIBBEAN WORKSHOP ON E-GOVERNMENT BEST PRACTICES Port of Spain, Trinidad & Tobago, July 26-28, 2005.
Training Workshop on Business Process Analysis in International Trade Joint Workshop on Trade Facilitation and the Single Window September 2015,
Training Workshop on Business Process Analysis in International Trade Joint Workshop on Trade Facilitation and the Single Window September 2015,
Update from the Faster Payments Task Force
2018/9/12 Project proposal of International Trade Integrated Service (ITIS) for MSMEs Dapeng (Max) Liu, Kepeng Li,
The ePhyto Solution A Guide to implement the ePhyto System
Internet Interconnection
Implementing UNeDocs in Pakistan
Employee engagement Delivery guide
UNECE International Conference
European Commission's Initiative on Electronic Transport Documents
Presentation transcript:

UNNExT Capacity Building Workshop on Single Window Planning and Implementation Module 11 – Summary & Conclusions Authored by Dr. Somnuk Keretho UNNExT Advisory Committee Director, Institute for IT Innovation Kasetsart University December 2011 Palais des Nations, Geneva Supported by

Page  2 UNNExT Workshop on SW Planning and Implementation, December 2011, Geneva Summary – 1/5  This SW Planning and Implementation Workship aims to support policy managers and stakeholders with a systematic approach to address SW implementation challenges.  The systematic approach, called SWIF (SW Implementation Framework), is recommended.  It is based on an architecture concept and its associated development methodology called SW Development Cycle* adapted to the specific context of SW.

Page  3 UNNExT Workshop on SW Planning and Implementation, December 2011, Geneva Summary – 2/5  We suggest basic architecture concepts for SW, as inspired by the architecture of physical buildings, as following  Vision and Vision Alignment  SW Vision and its development needs to align with the national development strategy (and also with the regional and/or international agenda for the long-run success).  Decomposition  Decomposing complex SW issues into smaller and easier manageable components or sub-problems. 10 Key Components are suggested in this framework.  Viewpoints  Descriptions in different detailed levels suitable for different audiences’ perspectives.  Blueprints  (Better) Descriptions in pictures or diagrams along with associated verbal/written explanations. Blueprints for the analysis of the current or ”As-Is” conditions and for proposing the future or ”To-Be” architectures are recommended to be developed.

Page  4 UNNExT Workshop on SW Planning and Implementation, December 2011, Geneva Summary – 3/5  Establishing the Vision – improving import/export procedures and documentation as a strategic mechanism for increasing national trade competitiveness  With Measurable Goals e.g. 25% better, faster and cheaper Trading Across Border within 5 years.  A map is needed to guide you to reach your vision and goals. A SW Road Map is recommended as a long-term development roadmap and also as a Reference Model for assessment (of the “as-is” conditions) & prioritization (guiding the “to-be” architecture) of the future SW development (at least initially as the high-level architecture) 1.Paperless Customs Declaration System 2. Integration with other Regulatory Bodies 3. Port Community System (PCS) (interconnecting with entire port community) 4. Integrated National Logistics Platform 5. Integrating the National Logistics Platform into a Regional Info-Exchange System time Potential benefits

Single Window Roadmap in Five Evolutionary Development Levels 1.Paperless Customs Declaration System 2. Integration with other Regulatory Bodies (Regulatory SW) 3. Port Community System (PCS) - interconnecting with entire port community (Port SW) 4. Integrated National Logistics Platform (Integrated SW) 5. Integrating the National Logistics Platform into a Regional Info-Exchange System (Cross-border SW) time Potential benefits Note that in many countries, Port SW or PCS (Maturity Level 3) was fully developed before Regulatory SW (Maturity Level 2). Here, we do not necessarily recommend every country to develop Levels 4 & 5 if it does not really justify the cost and benefits yet.

Page  6 UNNExT Workshop on SW Planning and Implementation, December 2011, Geneva Complexity of Single Window can be handled by decomposing its challenges into smaller and more manageable sub-components. * Referring to World Bank’s Index ( Vision Reality Complicated Trade Procedures There are a lot of challenges to be tackled. Laws and Regulations Many Document Requirements Inadequacy in Technology Infrastructure Many Stakeholders Conflict of Interest Compliance Governance Many different ICT systems People and Business In-Readiness Difficulty in trade data exchange Barriers in Interoperability Regional Connectivity Connectivity within the country System Development Change Management achieving trade transaction cost and time reduction goals e.g. APEC-Thailand, Chinese Taipei: 25% better, faster, cheaper trading across border* within 5 years 1. Stakeholders’ needs and requirements 3. Stakeholders Collaboration 2. Single Window Vision and Political Will 4. Business Process Analysis 5. Data Harmonization and Documents 6. Service Functions (Applications Architecture) 7. Technical Standards and Interoperability 9. Business Models, Financial Issues and Governance 8. Legal Infrastructure 10. IT Infrastructure and IT Solutions From the “As-Is” conditions (architectures) of all these components Migrating to the target “To-Be” architectures of all these 10 components timeline systematically decomposing these SW challenges into 10 key components

Page  7 UNNExT Workshop on SW Planning and Implementation, December 2011, Geneva SW Development Cycle Note that the above development cycles are normally conducted in several styles of iterations. For example, the whole cycle can be revisited during the feasibility study phase, and again the whole cycle during the planning phase, and during the implementation phase.

Page  8 UNNExT Workshop on SW Planning and Implementation, December 2011, Geneva Summary – 4/5  To plan & manage a SW project, a stepwise approach called SW Project Management Process is proposed. 1.Inception Phase (Preliminary) – Developing a concept paper for preliminary and initial discussion 2.Elaboration Phase – Conducting detailed feasibility study 3.Planning Phase – Formulating a High-level SW master plan 4.Execution Phase – Executing and overseeing the project implementation plan 5.Feedback & Lessons-learned Phase – Collecting lessons learned and suggesting opportunities for SW improvement and extensions. * Based on an architecture standard called TOGAF-9 (The Open Group Architecture Framework).

Page  9 UNNExT Workshop on SW Planning and Implementation, December 2011, Geneva SW Project Management is also a “Process” with its life -cycle. 1. Inception Phase 2. Elaboration Phase 3. Planning Phase 4. Execution Phase 5. Feedback Phase In each phase, the 10 key components and associated activities/deliverables in the SW development cycles should be revisited and refined iteratively.

Page  10 UNNExT Workshop on SW Planning and Implementation, December 2011, Geneva Summary 5/5  National Commitment is the most critical factor for the successful implementation of a SW environment.  The SW Political Will needs to be institutionalized, i.e. transforming this policy mandate into routine management mechanisms among those stakeholders involving in the implementation and operations of SW.  Inter-agency collaboration and coordination mechanism among governments and trade is one of the most important issues to enable the success of SW implementation. The above three issues above normally determine whether the SW project will succeed or fail, and also determine how fast or how effective the SW projects will proceed and gain the acceptance.

Page  11 UNNExT Workshop on SW Planning and Implementation, December 2011, Geneva Conclusions & Recommendations – 1/2  Adopt SWIF, the SW architecture approach, to develop and manage the SW Master Plan (at the national level & the regional level).  Establish the Measurable Trade Facilitation Vision (and Single Window Vision) at the national level, and aligining with the regional level, e.g. 25% better, faster and cheaper Trading Across Border within 5 years.  Conduct detailed Business Process Analysis (based on, for example, some key export products, strategic trade partners, and/or through major ports) to identify bottlenecks, and also propose better, faster and cheaper Business Process (that is feasible by e-documents, and Single Window functions).

Page  12 UNNExT Workshop on SW Planning and Implementation, December 2011, Geneva Conclusions & Recommendations – 2/2  Prioritize the SW scope(s) for iterative implementation based upon the context, needs and the strategy of the country, e.g.  Development of e-customs declaration first, then e-cargo clearance at some major ports, etc.  Analyze and agree upon the new business process as the common understansing for the within-the country connectivity, and regional connectivity (e.g. single-stop cargo clearance at the border).  Conduct the targeted documents and the associated data simplification/hamonization based on international standards, e.g. UNLK, WCO DM 3.0, CCL,...  Adopt international standards for technical interoperability, e.g. ebXML Message Services, UN/CEFACT XML NDR,...  Develop your SW architecture (Business, Data, Application, Technology,...)  Handle your change management carefully.....

Page  13 UNNExT Workshop on SW Planning and Implementation, December 2011, Geneva References  Eveline van Stijn, Thayanan Phuaphanthong, Somnuk Keretho, Markus Pikart, Wout Hofman, and Yao-Hua Tan, “Single Window Implementation Framework (SWIF),“ Free University Amsterdam, Kasetsart University, Bangkok, UNECE and published as an EU-supported ITAIDE D5.0:4b deliverable.  Eveline van Stijn, Thayanan Phuaphanthong, Somnuk Keretho, Markus Pikart, Wout Hofman, and Yao-Hua Tan, “An Implementation Framework for e-Solutions for Trade Facilitation,“ in the book “Accelerating Global Supply Chains with IT Innovation,” Springer,  Thayanan Phuaphanthong, Tung Bui, and Somnuk Keretho, “Harnessing Interagency Collaboration in Inter-organizational Systems Development: Lessons Learned from an E-government Project for Trade and Transport Facilitation,” International Journal of Electronic Government Research (IJEGR), Vol. 6, No. 3, July-September  “Business Process Analysis to Simplify Trade Procedures”, UNNExT-UNESCAP/UNECE publication,  Somnuk Keretho, “Managers’ Guide for Single Window Planning and Implementation,” UNNExT Workshop on SW Planning and Implementation, December 2011, Geneva facilitation-conference/workshop-programme.html facilitation-conference/workshop-programme.html

Page  14 UNNExT Workshop on SW Planning and Implementation, December 2011, Geneva Feedback from the participants Could you please write down your assessment on  How does this capacity building workshop of SW planning and implementation meet your expectations?

Best Wishes on Your SW Journey and Thank You for Your Active Participation. UNNExT Capacity Building Workshop on Single Window Planning and Implementation December Palais des Nations, Geneva