FM-ILT Results: Mechanisms FM1 Chopper and Calibration Sources Markus Nielbock (MPIA) Babar Ali (IPAC) Jeroen Bouwman (MPIA) Helmut Dannerbauer (MPIA)

Slides:



Advertisements
Similar presentations
PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching.
Advertisements

PACS SVR 38/9 Nov 2007 Wavelength Calibration1 FM ILT Spectrometer Wavelength Calibration Status Report H. Feuchtgruber, R. Vavrek.
CEA DSM IRFU SAp PACS Commissioning phase, Pointing Verification and Performance Verification Phase Planning Review (CPPhot) Koryo Okumura / Marc Sauvage.
Calibration for LHAASO_WFCTA Yong Zhang, LL Ma on behalf of the LHAASO collaboration 32 nd International Cosmic Ray Conference, Beijing 2011.
The PACS Status Herschel PV Mid-Term Review ESAC, September 1, Herschel Performance Verification Mid-Term Review PACS Status: Overview Markus Nielbock.
Bruno Altieri Jan # 1 Pointing calibration plan Bruno Altieri (HSC) PACS PV phase.
PACS IIDR 01/02 Mar 2001 Instrument Overview1 PACS Instrument Design Description and System Performance A. Poglitsch.
Max-Planck-Institut für Astronomie Heidelberg PACS SVR 22./23. June 2006 MPE Garching J. Stegmaier, U. Grözinger, D. Lemke, O. Krause, H. Dannerbauer,
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
HAWCPol / SuperHAWC Software & Operations J. Dotson July 28, 2007.
PLATO kick-off meeting 09-Nov-2010 PLATO Payload overall architecture.
CEA DSM IRFU SAp PACS Commissioning phase, Pointing Verification and Performance Verification Phase Planning Review (PVPhot) Koryo Okumura / Marc Sauvage.
PACS IQR 13 Jan 2005 AVM/CQM ILT – test results1 PACS CQM/AVM ILT Results of functional/performance/ calibration tests.
0. To first order, the instrument is working very well ! 1.Evolution of the IR detector with time 2.Stability of the L channel 3.Saturation 4.Linearity.
PACS SOVT-2 (SIMS) and CAPs development MPIA PACS ICC Meeting #32 1 st – 3 rd April 2009, MPE Garching Markus Nielbock (MPIA)
PACS SVR22/23 June 2006 PACS Thermal Behaviour1 PACS Thermal Behaviour Tests T. Müller, H. Feuchtgruber, A. Contursi, Cs. Kiss, Sz. Csizmadia.
- page 1 July NHSC Mini-workshop PACS NASA Herschel Science Center PACS Photometer AORs How to Prepare an Observation with HSpot: 2 Science Use.
CEA / PACS SVR phase 2 Photometer results from the first part of the FM ILT CEA - MPE - NHSC.
Profile Measurement of HSX Plasma Using Thomson Scattering K. Zhai, F.S.B. Anderson, J. Canik, K. Likin, K. J. Willis, D.T. Anderson, HSX Plasma Laboratory,
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
FM-ILT Results of the PACS FM1 Chopper Markus Nielbock Ulrich Klaas Jeroen Bouwman Helmut Dannerbauer Jürgen Schreiber Ulrich Grözinger.
SPIRE Consortium Meeting La Palma, Oct. 1 – SPIRE FTS Pipeline Trevor Fulton Blue Sky Spectroscopy, Lethbridge, Canada.
PACS FM-ILT SPECTROMETER SPATIAL CALIBRATION A. Contursi (H. Feuchtgruber) PACS Science Verification Review – 8/9 November 2007 MPE-Garching.
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
Page 1 PACS NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Overview of SPIRE Photometer Pipeline Kevin Xu NHSC/IPAC on behalf of the SPIRE.
PACS IIDR 01/02 Mar 2001 On-Board Data Compression1 On-Board Data Compression Concept A. N. Belbachir Vienna University of Technology.
PACS SVR 2 18 Jan 2007 FM ILT: Mechanisms1 FM ILT Results: Mechanisms H. Feuchtgruber, H. Dannerbauer, N. Geis, C. Hartinger, U. Klaas, P. Royer.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
PACS SOVT-2 and CAPs development MPIA PACS ICC Meeting #31 12 th – 13 th January 2009, Vienna (A) Markus Nielbock (MPIA)
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th - 10 th Oct 2014 The SPIRE Photometer and its Observing Modes Bernhard Schulz (NHSC/IPAC)
PACS NHSC Data Processing Workshop – Pasadena 10 th - 14 th Sep 2012 SPIRE AOTs, Products and Quick Look Tools Bernhard Schulz NHSC/IPAC on behalf of the.
PACS Spectrometer Spatial Calibration plan in PV phase A.Contursi D. Lutz and U. Klaas.
Experience from the Spallation Neutron Source Commissioning Dong-o Jeon Accelerator Physics Group Oak Ridge National Laboratory May 9, 2007.
PACS SVR 22/23 June 2006 Instrument Performance Prediction1 PACS Instrument Model and Performance Prediction A. Poglitsch.
PACS IBDR 27/28 Feb 2002 PACS Data Flow1 PACS Data Flow, Instrument Modes and Operations Helmut Feuchtgruber MPE.
Optimisation of the PACS Chopper Markus Nielbock Ulrich Klaas Jeroen Bouwman Helmut Dannerbauer Jürgen Schreiber Ulrich Grözinger.
Spectroscopy with PACS M82 PACS line imaging from the SHINING team (Contursi et al First Results workshop talk) Phil Appleton and Dario Fadda for.
PACS SVR 22/23 June 2006 Scientific/Performance Requirements1 PACS Science and Performance Requirements A. Poglitsch.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
CEA DSM Dapnia SAp Readout mode of the Photometer Koryo Okumura, Marc Sauvage, Nicolas Billot, Bertrand Morin DSM/DAPNIA/SAp.
PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer1 Spectrometer Performance H. Feuchtgruber, T. Müller, A. Poglitsch.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
PVPhotFlux PACS Photometer photometric calibration MPIA PACS Commissioning and PV Phase Plan Review 21 st – 22 nd January 2009, MPE Garching Markus Nielbock.
Jan 21/22, 2009PACS PV Review Photometer Spatial Cal1 PACS Photometer Spatial Calibration PVPhotSpatial D.Lutz PACS PV Review Jan 21/ , MPE.
PACS ICC Readiness Review MPE, July 3/ PACS Photometer PV Phase Plan 1 Status Report M. Nielbock: PACS PHOT PV Phase Plan Markus Nielbock (MPIA)
CEA DSM Dapnia SAp Flux calibration of the Photometer Koryo Okumura, Marc Sauvage, Nicolas Billot, Bertrand Morin DSM/DAPNIA/Sap.
Overview, Spectrometer Products and Processing Philosophy Phil Appleton on Behalf of PACS Team PACS IFU Spectrometer.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
Herschel EQM – Results and Lessons Learnt6/7 Feb 2006 PACS Overall Analysis1 Overall PACS EQM IMT Analysis Contributions by PACS ICC.
RAW DATA BIAS & DARK SUBTRACTION PIXEL-TO-PIXEL DQE CORR. LOCATE EXTR. WINDOW THROUGHPUT CORRECTION (incl. L-flat, blaze function, transmission of optics,
Page 1 NHSC PACS Web Tutorial PACS 301 nhsc.ipac.caltech.edu/helpdesk NHSC/PACS Web Tutorials Running the PACS Spectrometer pipeline for CHOP/NOD Mode.
PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration1 FM ILT Spectrometer Wavelength Calibration Status Report H. Feuchtgruber.
PACS IIDR 01/02 Mar 2001 Optical System Design1 N. Geis MPE.
- page 1 July NHSC Mini-workshop PACS NASA Herschel Science Center PACS Spectrometer AORs Phil Appleton 1Roberta Paladini.
New SPIRE features in HIPE 9.1 NHSC; Nov 28, 2012 PACS Page 1 What’s New in HIPE 9.1 ( SPIRE FTS) Nanyao Lu NHSC/IPAC (on behalf of the SPIRE ICC)
- page 1 PACS Phil Appleton on behalf of the NHSC/HSC and the PACS ICC ; especially Bart Vandenbussche and Pierre Royer (KUL Belgium) Instrument Performance.
Markus Nielbock (MPIA) – Herschel Pointing PACS ICC Meeting #38 Herschel Pointing Summary and Recent Developments Markus Nielbock (MPIA Heidelberg) with.
Markus Nielbock (MPIA) – PACS Photometer Flux Calibration Herschel Calibration Workshop PACS Photometer Flux Calibration: Update Markus Nielbock (MPIA.
Markus Nielbock (MPIA) – PACS Calibration Status Report Herschel Calibration Steering Group Meeting #24 PACS Calibration Status Report Markus Nielbock.
Markus Nielbock (MPIA) – PACS Photometer Flux Calibration EPOS Meeting PACS Photometer Flux Calibration Current Plans Markus Nielbock MPIA, 22 th February.
Markus Nielbock (MPIA) – PACS Point Source AOT Pipeline Herschel Science Demonstration Phase Data Processing Workshop PACS Point Source AOT Pipeline Tutorial.
The HXMT in-flight calibration plan Shaolin XIONG, Shijie ZHENG, Liming SONG On behalf of HXMT SGS team Institue of High Energy Physics, China 11th.
Herschel Calibration Workshop
NHSC/PACS Web Tutorials
PACS Calibration Status Report
PACS ICC Meeting #41 PACS Photometer
On-Orbit Performance and Calibration of the HMI Instrument J
Markus Nielbock (MPIA Heidelberg)
Presentation transcript:

FM-ILT Results: Mechanisms FM1 Chopper and Calibration Sources Markus Nielbock (MPIA) Babar Ali (IPAC) Jeroen Bouwman (MPIA) Helmut Dannerbauer (MPIA) Dario Fadda (IPAC) Helmut Feuchtgruber (MPE) Dave Frayer (IPAC) Csaba Kiss (Konkoly) Ulrich Klaas (MPIA) Jürgen Schreiber (MPIA) MPIA SVR III, 8 th Nov 2007

Markus Nielbock – FM-ILT Results: PACS Chopper & CS Chopper Angular Calibration angular calibration for FP1 and FP2 accuracy better than 1’ (0.7” on sky) see FM-ILT reports: PICC-MA-TR-20, 21, 23, 34, 36, 38 SVR III, 8 th Nov 2007

+4° nominal Markus Nielbock – FM-ILT Results: PACS Chopper & CS Chopper Performance see FM-ILT report: PICC-MA-TR-31 Req. 1: duty cycle of ≥ 80% for science observations (±4.1°) and chopping at 10 Hz Req. 2: duty cycle of ≥ 70% for calibration observations (~8°) and chopping at 5 Hz  10 ms transition time  30 ms transition time redundant +8° nominal transition time: 19 msduty cycle: 62% (10 Hz)  specifications not met for 10 Hz, but … symmetric in positive and negative angles (DEC/MEC upgrade) If chopping at 5 Hz: 81% duty cycle (sufficient) stable within rms = 0.03” on sky transition time: 23 msduty cycle: 77%  specifications met stable within rms = 0.04” on sky 12 ms nominal and redundant operation identical duty cycles caused by filter SVR III, 8 th Nov 2007

Markus Nielbock – FM-ILT Results: PACS Chopper & CS Implications for IST and PV 1. Synchronisation with detector readout (spectrometer) blue 6 rou Question: How do we deal with this? a) discard first 6 raw read-outs (on-board software) b) discard whole ramp (significant loss of data) 2. PID and rest position verification and optimisation a) during IST b) during commissioning and PV c) verification regularly during routine phase c) increase samples per ramp from 4 to 8 3. Degraded mode (reduced set of drive coils) not tested to be postponed to FS-ILT First 6 read-outs are affected by chopper movement. SVR III, 8 th Nov 2007

CS2 CS K (80  ) 76.2 K (92  ) CS1 CS2 Markus Nielbock – FM-ILT Results: PACS Chopper & CS Calibration Sources: Performance see FM-ILT reports: PICC-MA-TR-32, 33 Requirement 1: heat-up time to final temperature: 30 min (± 5%) (PACS-ME-RS-10) Requirement 2: stability: 0.01% (± 7 70 K) CS1 faster in heat-up than CS2 nominal DEC/MECredundant DEC/MEC CS2 faster in heat-up than CS1 CS1 (heat-up to 70.6 K) CS2 (heat-up to 76.2 K) heat-up + stabilisation time: min heat-up + stabilisation time: min CS1 (heat-up to 70.6 K) CS2 (heat-up to 76.2 K) heat-up + stabilisation time: min heat-up + stabilisation time: min  heat-up time requirement fulfilled  stability requirement fulfilled SVR III, 8 th Nov 2007

Markus Nielbock – FM-ILT Results: PACS Chopper & CS Calibration Sources: Homogeneity see FM-ILT report: PICC-NHSC-TR-002 sky window ~ 7.5’ (sky) calibration sources Bolometer FOV scans: CS emission pattern inhomogeneous inhomogeneities consistent between measurements blue green red to be considered for flux calibration (precise detector flat field) SVR III, 8 th Nov 2007

Markus Nielbock – FM-ILT Results: PACS Chopper & CS Calibration Sources: Positions see FM-ILT report: PICC-NHSC-TR-002 current default positions: translated to chopper angles: CS1: ROUCS2: ROU CS1: ROUCS2: ROU To be confirmed in orbit raw data processed field distortion not yet included photometer FOV photometer FOV SVR III, 8 th Nov 2007

Markus Nielbock – FM-ILT Results: PACS Chopper & CS Calibration Sources: Emissivity see FM-ILT report: PICC-NHSC-TR-003 CQM values stray light effects needed to compensate for telescope background Emissivity depends on wavelengthand ranges between 0.05 and CS2 (76 K) Requirements: grey-body, 0.04 <  < 0.16 within 55  m < < 210  m (PACS-ME-RS-10)  requirements fulfilled SVR III, 8 th Nov 2007

Markus Nielbock – FM-ILT Results: PACS Chopper & CS CS: Implications for PV, SV 1. Heat-up time constraints a) will be faster for lower CS temperatures (e.g. ~20 min for 50 K) b) perhaps swap CS temperatures in nominal operation (CS1 is faster) c) maybe could gain ~10 min by reducing overshoot (control parameters) 3. Emissivity and selection of CS temperatures a) depends on telescope temperature (not very well known yet) b) can only be established with a fully cooled down telescope 2. Optimal chopper angle for CS a) CS width just matches PACS FOV of bolometers b) little flexibility in positioning the arrays on the CS c) flux calibration has to correct for CS inhomogeneities Flux ratio model: CS2 vs. telescope incl. stray light SVR III, 8 th Nov 2007

Markus Nielbock – FM-ILT Results: PACS Chopper & CS Summary Chopper Calibration Sources mostly within specifications (reduced duty cycle for 10 Hz chopping) duty cycle of 81% at 5 Hz chopping is sufficient PID optimisation during IST/commissioning might improve transition decision to be made about detector read-outs affected by chopper movement heat-up, stability and emissivity within specifications spots and structures detected at CSs photometer FOV just fits on CS CS temperatures to be adjusted to telescope temperature (~ 50 K ?) accurate angular calibration for nominal and redundant operations SVR III, 8 th Nov 2007