Summary: Mechanics - Overview of the MFT in ALICE. - Description of the MFT. - Description of a MFT detection plane. - Environment of the MFT. - Procedure.

Slides:



Advertisements
Similar presentations
New Plate Baffle Water Flow. Quick Simulation Use triangular prism as rough estimate of a vane Uniform heat flux on each surface –600 kWm -2 on end face.
Advertisements

Chapter 2: Overall Heat Transfer Coefficient
1 Integration issues of FPCCD VTX Yasuhiro Sugimoto May 22,
Mechanical Status of ECAL Marc Anduze – 30/10/06.
CHE/ME 109 Heat Transfer in Electronics LECTURE 7 – EXAMPLES OF CONDUCTION MODELS.
MFT Progress Report Ginés Martínez García for the MFT project ALICE mini-week, Sep 1 st -5 th 2014.
GTK WG Meeting April 5 th 2011 Update on Microchannel Cooling - Paolo Petagna 1/15 PH-DT Update on Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli.
Design of Heat Sinks P M V Subbarao Mechanical Engineering Department IIT Delhi Success Based on Cooling Challenges …….
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
1 Denis Grondin – Sept.23 TH, 2010 Cooling & mechanics status CALICE Collaboration Casablanca at LPSC ECAL.
ME 414 : Project 1 Heating System for NASA North Pole Project Team Members Alan Benedict Jeffrey Jones Laura O’Hair Aaron Randall May 5, 2006.
1 EUROnu design System target + horn First thermal calculations on the target made of aluminium G. Gaudiot 02/06/2010 Strasbourg.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Calorimeter Analysis Tasks, July 2014 Revision B January 22, 2015.
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
What are common results of heat transfer? Case #1, no phase transition or work done. How much does the temperature vary? Heat is energy in transit! Positive,
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
FPCCD VTX Overview Yasuhiro Sugimoto KEK Tokubetsu-Suisin annual meeting 11.
One-Dimensional Steady-State Conduction
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
2009/1/16-18 ILD09 Seoul 1 Notes for ILD Beam Pipe (Technical Aspect) Y. Suetsugu, KEK Parasitic loss Vacuum pressure profile Some comments for beam pipe.
Convection: Internal Flow ( )
Full Scale Thermosyphon Design Parameters and Technical Description Jose Botelho Direito EN/CV/DC 19 November, th Thermosyphon Workshop.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
Overview WG4 Meeting - 16th October 20121M. Gomez Marzoa, E. Da Riva Maximum ΔT admissible at cooling system T_1 T_2 T_1+0.5*ΔT Stave  If T_2 – T_1 =
DCLL ½ port Test Blanket Module thermal-hydraulic analysis Presented by P. Calderoni March 3, 2004 UCLA.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
C.KotnigFCC Design Meeting FCC Beam Screen cooling Claudio Kotnig.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
E. Da Riva/M. Gomez Marzoa1 WG4 Meeting - 27th June 2012 Air Cooling by means of carbon fiber structure Enrico DA RIVA (EN-CV-PJ) Manuel GOMEZ MARZOA (EN-CV-PJ)
Cooling of GEM detector CFD _GEM 2012/03/06 E. Da RivaCFD _GEM1.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
Heat Transfer by Convection
Heat Transfer Su Yongkang School of Mechanical Engineering # 1 HEAT TRANSFER CHAPTER 8 Internal flow.
1 ILD inner region integration meeting M. Joré – Introduction ILD inner region integration meeting Welcome words Charge of the meeting The current concept.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
DCal-ALICE integration and installation plan and status A. Tauro.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
Heat Transfer Su Yongkang School of Mechanical Engineering # 1 HEAT TRANSFER CHAPTER 8 Internal flow.
Lesson 7: Thermal and Mechanical Element Math Models in Control Systems ET 438a Automatic Control Systems Technology 1lesson7et438a.pptx.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EC: 7 DISK concept Preliminary considerations
BCP Analysis Update Thomas Jones 22/7/16.
Technical Design for the Mu3e Detector
HCAL preliminary analysis and results
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
C.Clerc ILD session, ALCPG /03/2010
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
LumiCal mechanical design, integration with LDC and laser alignment
CFD-Team Weekly Meeting - 8th March 2012
CEDAR Detector Ventilation System Review
COOLING & VENTILATION INFRASTRUCTURE
WG4 – Progress report R. Santoro and A. Tauro.
ET 438a Automatic Control Systems Technology
Thermal behavior of the LHCb PS VFE Board
PANDA Collaboration Meeting
Presentation transcript:

Summary: Mechanics - Overview of the MFT in ALICE. - Description of the MFT. - Description of a MFT detection plane. - Environment of the MFT. - Procedure and tools for MFT installation. - Conclusion, discussion Cooling - Thermal and fluidic studies on the MFT. - Preliminaries studies of the impact of cooling on the MFT barrel. Next steps MFT – WG7 Mechanics and cooling ITS-MFT common week March

The place of the MFT in ALICE cross section at the beginning of the project (11/2011) beam MFT ITS absorber Beam pipe IP TPC V0, T0, FIT ? C side A side Disclaimer: the following presentation is mainly based on the MFT LoI with some modifications: 6 th plane added, planes position versus IP modified 2

FIT MFT barrel Cage fixe Beam pipe Beam pipe support Service room General view of the MFT in ALICE Sketch of integration MFT-ITS-FIT-BP release MFT – 11/2013 Version TDR 6 ITS, BP od 19.8 mm MFT AbsorberITS 3 MFT cone MFT disk The dimensions of the beam pipe are crucial for us. They need to be fixed as soon as possible, od 19 mm will be better for MFT

MFT description. LoI release -6 detection planes -2 sealed half cone (up et down), (almost) symmetric cone Detection plane BP* gutter *BP : Beam Pipe BP support gutter Front disk Rear disk Kapton sheet Room needed for the BP support 4

Disk 0Disk 1Disk 2Disk 3 Disk 4Disk 5 IP Proposed distances between each disc and the IP In accordance with ICD_ _MFT_vs_BP-1.ppt and related documents 5 D 43.6D 50.4D 54.4D 60.4 D 70D 64 D 72 Diameter’s values are diameter of the beam pipe or bellow plus safety room of 4 mm given by CERN.

MFT’s detection plan description Plan type 04 Beam pipe passage Detection ladder Air cooling nozzle Air inletAir outlet Optical fiber 6

MFT’s detection plan description Spilt view of the plan 04 Objects constituting a plan Front detection area Rear detection area Ladder support pcb Optical transceivers Air cooling nozzle 7

MFT’s detection plan description Technical proposal for a disk PCB Front detection area Rear detection area Ladder support ladders 8

Here are the possible sizes of the various zones of every disks Disc 0 to 3 Disc 4 and 5 20° D1 D2 D3 PCB area detection area mmDisc 0Disc 1Disc 2Disc 3Disc 4Disc 5 D D D D2 and D3 obtain according to the 3° and 9.4° angles, D1 defined according to ITS position D3 values defined by adding a conservative safety room of 6 mm (2x3mm) for integration of the MFT’s ladders. (less than 2 mm expected). preliminary data 9

MFT’s detection plane and ladder description Listing of plane component and power consumption for a half MFT 10 * mW/ASIC => 310 W * W/GBT => 190 W * 52 W for optic transceiver * 252 W for DC-DC converters about 800 W for a half MFT C. Renard and S. Bouvier, 19/02/2014 sensors flex Connector (PCB side) Connector (flex side) stiffener 3 sensors ladder

MFT environment 11 Beam Pipe BP Support fixe cage C side BP support « wing » of the BP support Removables rails 11

-Installation tools, « MFT down » After the assembly of the MFT detector: MFT mounted on the MFT barrel 12 MFT barrel The half MFT complete is installed inside the MFT barrel. All the services will pass through the MFT barrel, with an exit on the C side. A side C side Room for optical fiber Zone de fixation FIT 12

- Installation tools, « MFT down barrel » Room for electrical and optical services MFT fixing area Passage air/water cooling Inlet and outlet Sketch of the MFT barrel Fit fixing area 13

-Procedure and tooling for MFT installation 14 Insertion of the assembly (MFT, FIT, MFT barrel) The MFT and its barrel are mounted around the BP, then the assembly is translated along the BP (Y, YZ). The MFT barrel will move along slider installed on the fixe cage. Fixation of the assembly will be made at the end of the sliding movement. The same procedure will be made with the MFT “up”. along Y along YZ 14

-Procedure and tooling for MFT installation ITS, TPC, … ITS outer and middle layers ITS inner layers Rails extraction Internal TPC cage 15

-Conclusion et discussion Area to be studied Questions and interface discussions Beam pipe dimension need to be fixed Od 19 mm? but also the other od and the BP support? ITS TDR need to be fixed * Extremity close to MFT of the middle layer * Room needed for MFT services FIT * Mounted on the MFT barrel, ok * Fully independent from MFT, ok but * Now updated dimensions needed * Design of MFT barrel need information about FIT’s services « middle et outer layers » Envelope (TDR6) Modification proposal X X 16

17 -Cooling Summary: Mechanics - Overview of the MFT in ALICE. - Description of the MFT. - Description of a plan of the MFT. - Environment of the MFT. - Procedure and tooling for MFT installation. - Conclusion, discussion Cooling - Thermal and fluidic studies on the MFT. - Preliminaries studies of the impact of cooling on the MFT barrel. - Next step

The estimated model is in accordance with that presented in the LoI (power, geometry), the power coming from the read out is not counted, the change of the geometry of the disk due to BP support and its “wing” is not taken into account. Several estimated models, with various materials for the disk supports (TPG, Beryllium, composites), with various modes of cooling (conductive and convective). Conclusion, first proposal Use of an airflow at room temperature to cool detection planes, on surface and inside the planes. - Simplify the design, simplifies constraints. - allows to limit the quantity of material used (lowering X0). Proposal of the use of Beryllium for the planes material, good ratio rigidity, X0, thermal conductivity (LoI). Composite cabon/epoxy work also, less costly than Beryllium Abstract of the MFT’s preliminary thermal studies 1,4 mm 2 mm Full disk outside inside 3 distincts air flux Air outlet Air inlet 18

Air 1Air 2 Air 3 Air 4Air 5 Air 6 Beam pipe Particules Detection area Example of simulation of air flow in the MFT Air speeds inside the MFT are lower than 10 m/s Average wall heat transfer are:: 50 W/m².K outside the planes 30 W/m²K inside the planes AIR5 AIR56 AIR6 Zoom INLET 19

Simple geometry, goal was to test several material and kind of cooling. ASIC insulation flex support ASIC: 0,18µm Length 30 mm, width 8 mm (5 mm active, 3 mm passive) thickness 50µm power deposit: 515 mW/sensor (LoI) Very conservative, actual value is: 325 mW/sensors Flex: 2 x 57 µm aluminum Insulation: 3 x 50µm de Kapton Support/stiffener: 0,2 mm, Beryllium convection Water cooling Power deposit convection Example of thermal simulation of a ASIC group 20

Quarter plan description (LoI) : 13 ladder 1 ladder with 1 sensor 1 ladder with 2 sensors 6 ladders with 3 sensors 5 ladders with 4 sensors 41 sensors for the studied quarter plan, about 328 sensors for the full disk (2 plans, recto and verso). Power deposit on sensor is 515 mW. About 169 w for the full disk. Maximal air flow speed inferior at 10m/s. Wall heat transfer upside the sensors is 40 W/m².K Wall heat transfer inside the plan is 25W/m².K Air flow temperature is 22°C Calculated maximum temperature of the ASIC is about 30°C. Thermal simulation on one MFT disk 21

The use of the air at room temperature with a air flow speed lower than 10 m/s on the detection planes allows to obtain temperatures of functioning of the ASIC lower than 30 °C, 1/ first cost estimate (170 k€) concerning the manufacturing of support disk in Beryllium is too high, the use of composites Carbone-Epoxy should be favored. The Alloy AlBeMet could be an interesting candidate also (46 k€). Good to know that the use of one of these three materials cheek few on the results. 2/ assure the cooling of the complete MFT with only of a air flow is not a unique, definitive or settled solution; the final amount of total powers dissipated in the plans as well as other considerations (of geometry, mechanical design) will make that we can be brought to complete the air cooling by a liquid cooling, in the area located out of the zone of detection in particular. In addition, the front end electronic on the PCB will maybe need to be water cooled. 3/ The previous simulation have been made with sensor power consumption of 515mW/sensor, now the sensors power deposit last value is 325mW/sensor. This reduction of the power will allow to reduce the speed of the air flow, and/or suppress the air cooling inside plan (simplification of the mechanical design). First conclusion 22

Quick estimate of the amount of cooling water to put in the " MFT Barrel " Quick estimate of the amount of cooling water to put in the " MFT Barrel " P = dm*Cp*DT hypothesis: P = power = 1.6 kW/2 = 800 W = 0.8J/s dm = mass flow rate (kg/s) Cp = heat capacity= 4.2 kJ/kW*K DT = delta T= 3 °K 0.8 = dm*4.2*3 dm = kg/s roughly 0.06litres/s = 0, m3 I’ll take a velocity of 1m/s in order to limit the pressure loss along the pipes. 0, /1 = 0, m² make 60 mm², the cross section of 8.74 mm diameter pipe, round off at 9mm. So we have a 9 mm inlet pipe and a 9 mm outlet pipe for each half MFT, that is to say two 9 mm diameter pipe per MFT barrel. If we want smaller pipe we will multiplicate the number or pipe (pay attention to the pressure loss phenomena). So with a diameter of 3 mm we will have 18 pipes (9 inlet et 9 outlet). Etc… Reminder! In these calculations all the power is evacuated by the water, in reality a big part will be evacuated by the air. So in reality we will need less pipes of water to achieve the cooling (2 or 3 time less). We will need to evaluat the « leakless » system (it will bring some limitation in the quality of the cooling). It's better to forbit the watercooling in the area of detection ( PCB area). If it is possible it will be necessary to plan some redundancy in the number of pipes. Inlet pipe Outlet pipe 23

Summary: Mechanics - Overview of the MFT in ALICE. - Description of the MFT. - Description of a plan of the MFT. - Environment of the MFT. - Procedure and tooling for MFT installation. - Conclusion, discussion Cooling - Thermal and fluidic studies on the MFT. - Preliminaries studies of the impact of cooling on the MFT barrel. - Next steps MFT – WG7 Mechanics and cooling ITS-MFT common week March

Next steps (3 to 6 next months) MFT TDR preparation. Cooling: -update of the thermal simulation, according to the up to date MFT power consumption and geometry. -new proposal, or confirmation and optimization of actual solution with read out Electronics and DC-DC converter taken into account -Design of a thermal test mockup. Mechanics: -Optimization of the shape of the MFT cone (+ accessories) according to ITS TDR and discussion between ITS and MFT WG on mechanics. -Detailed mechanical design of a disk, then building of an integration mockup. -Participation at the WG5, stiffener design and supply, first carbon/epoxy stiffener available for the end of march). -Initiate work on MFT disk vibration (need more detailed mechanical design of the disk). -Service/ installation : updated and technical proposal for the MFT barrel. MFT – WG7 Mechanics and cooling ITS-MFT common week March