EDUCAUSE Center for Applied Research The Promise and Performance of Enterprise Systems May 22, 2003 Robert B. Kvavik Senior ECAR Fellow The Promise and.

Slides:



Advertisements
Similar presentations
Pennsylvania BANNER Users Group 2007 Structuring a reporting environment for success.
Advertisements

How to commence the IT Modernization Process?
Develop an Information Strategy Plan
1 ACI Annual Audit Committee Survey - Global M A R K E T I N G & C O M M U N I C A T I O N S R E S E A R C H Charles Garbowski Research February 21, 2006.
1 The CMO – One Size Fits All? Jake Julia, Ph.D.Brenda Sprite Northwestern UniversityNavigator Management Partners Session Presented at the Inaugural Global.
Study on the outcomes of teaching and learning about ‘race’ and racism Kish Bhatti-Sinclair (Division of Social Work Studies) Claire Bailey (Division of.
City of Victoria Presentation of Results - January 11, Business Survey.
© RPI In commercial confidence only Benchmarking Survey Overview of Results & Key Insights June 22, 2011 Presented By: Ian Citulsky, Carlson.
1 Enterprise Information System Enhancement Major technology venture Replace university’s primary information systems Solution is Banner from SCT inc.
Summary of Key Results from the 2012/2013 Survey of Visa Applicants Who Used a Licensed Adviser Undertaken by Premium Research Prepared: July 2013.
UT System ERP Planning Project Financial Area Representatives April 22, 2009.
Effect of Staff Attitudes on Quality in Clinical Microbiology Services Ms. Julie Sims Laboratory Technical specialist Strengthening of Medical Laboratories.
Enterprise Resource Planning (ERP) Systems
System Office Performance Management
TEST YOUR KNOWLEDGE LESSON 4: BACK TO SCHOOL ABC Lesson 4: Back to School.
ENACTUS TRAINING Steps to condcut a needs analysis Developed by D Caspersz & D Bejr, 2013.
TNS Proprietary: © Linking Employee Compensation to Survey Metrics High-Level Considerations and Best Practices January, 2006.
SLIDE 1 Innovations Conference March SLIDE 2 The National Lone Star Report Aligning Technology with Student Success.
Economic Case and Image Survey Final Report Prepared By: Market Probe 2655 N. Mayfair Road Milwaukee, WI February 9, 2004 ©2004. Market Probe. All.
US Diagnostic Imaging Marketrack Project Introduction Presentation Company Confidential.
COMPGZ07 Project Management Presentations Graham Collins, UCL
Executive Summary July SURVEY OVERVIEW Methodology Penn Schoen Berland conducted 1,650 telephone interviews between March 27, 2015 and May 4, 2015.
© 2005 Virtue Ventures LLC. Licensed under a Creative Commons Attribution-Share Alike 3.0 License Feasibility Analysis For Social Enterprise.
IPv6 Survey: Taking the Federal Pulse on IPv6 Summary Results Market Connections, Inc. June 2006.
SHRM Survey Findings: The Ongoing Impact of the Recession—High-Tech Industry September 25, 2013.
The Newspaper Effectiveness Metric. Content Why create a Newspaper Effectiveness Metric? The Newspaper Effectiveness Metric in summary Validation of the.
SHRM Poll: The Ongoing Impact of the Recession—High-Tech Industry July 31, 2012.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
Course on Data Analysis and Interpretation P Presented by B. Unmar Sponsored by GGSU PART 2 Date: 5 July
The Impact of the MMP on Student Achievement Cindy M. Walker, PhD Jacqueline Gosz, MS University of Wisconsin - Milwaukee.
SHRM Poll: The Ongoing Impact of the Recession—Health Industry August 28, 2012.
1 © 2004 Cisco Systems, Inc. All rights reserved. Case Study Cisco Unity Voice Messaging Deployment: Communications Strategy November.
National Commission for Academic Accreditation & Assessment Developmental Reviews at King Saud University and King Faisal University.
SHRM Survey Findings: The Ongoing Impact of the Recession—Manufacturing Industry September 25, 2013.
Microsoft Office SharePoint Server (MOSS) 2007 Adoption In A Word: Pervasive Forrester Research From: March 2008 North American And Western European Enterprise.
SHRM Survey Findings: The Ongoing Impact of the Recession—Health Industry September 25, 2013.
SHRM Survey Findings: The Ongoing Impact of the Recession—Finance Industry September 25, 2013.
Prepared For: definition, IFSA Conference 2005 By: Linda McAvenna Dissecting the investor psyche: what motivates our clients.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, All Rights Reserved Chapter 12 Integrating the Organization from End to End – Enterprise Resource Planning.
CHAPTER 12 Descriptive, Program Evaluation, and Advanced Methods.
SHRM Survey Findings: The Ongoing Impact of the Recession—State and Local Government September 25, 2013.
Copyright 2003 – Cedar Enterprise Solutions, Inc. All rights reserved. Business Process Redesign & Innovation University of Maryland, University College.
SHRM Survey Findings: The Ongoing Impact of the Recession—Construction, Mining, Oil and Gas Industry September 25, 2013.
Enterprise Resource Planning
Faculty Satisfaction Survey Results October 2009.
Unit 8.2: Effective Implementation Planning HIT Implementation Planning for Quality and Safety Component 12/Unit 81 Health IT Workforce Curriculum Version.
SHRM Poll: The Ongoing Impact of the Recession—Construction, Mining, Oil and Gas Industry March 9, 2012.
Chapter Sixteen Managing Network Design and Implementation.
Change Management 1 Intro To Business. Intro to Business Defining change management Individual change management Organizational change management Who.
Instructors’ General Perceptions on Students’ Self-Awareness Frances Feng-Mei Choi HUNGKUANG UNIVERSITY DEPARTMENT OF ENGLISH.
0 ©2015 U.S. Education Delivery Institute While there is no prescribed format for a good delivery plan, it should answer 10 questions What a good delivery.
1 Summarize from: Sustainability of ERPS performance outcomes: The role of post-implementation review quality Nicolaou A. and Bhattacharya S. International.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 11 Selecting.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
The Los Angeles Public Health Leadership Institute: An Intra-organizational Approach To Leadership Development APHA Session: The Challenge of Leadership.
Impact Research 1 Enabling Decision Making Through Business Intelligence: Preview of Report.
What are they and why do we need Relational Database Management Systems (RDBMS) & Enterprise Resource Planning (ERP) Systems ? Prepared for Tennessee Board.
HSM 220 MART Teaching Effectively/hsm220mart.com FOR MORE CLASSES VISIT
Ponemon Institute© Private & Confidential ReportPage 1 State of the Endpoint Survey Analysis of Global Results Briefing for Lumension October 30, 2009.
[Presentation location] [Presentation date] (Confirm ABT logo) Building Bridges and Bonds (B3): An introduction.
Internal Audit Quality Assessment Guide
March, 2004 Into the LAN: An Integrated LAN/WAN End User Study © 2004 Frost & Sullivan. All rights reserved. This document contains highly confidential.
Professor: Jo B. Bitonio ME 215 Management of Change & Transition.
To flip or not to flip: An exploratory analysis into student attitudes towards the flipped classroom approach to learning Enhancement Themes conference,
Chief Digital Officers (CDOs) are establishing themselves as new executives at the top management level of companies that go through a digital transformation.
Application Outsourcing: Achieving Success & Avoiding Risk
SHRM Survey Findings: The Ongoing Impact of the Recession—State and Local Government September 25, 2013.
BANKING INFORMATION SYSTEMS
Identify the Risk of Not Doing BA
Enterprise Resource Planning (ERP) Systems
Presentation transcript:

EDUCAUSE Center for Applied Research The Promise and Performance of Enterprise Systems May 22, 2003 Robert B. Kvavik Senior ECAR Fellow The Promise and Performance of Enterprise Systems May 22, 2003 Robert B. Kvavik Senior ECAR Fellow

Page 2 Presentation Agenda Industry Overview – current snapshot of higher education’s experience with “enterprise systems”

Page 3 Background Findings based on study of nearly 500 colleges and universities conducted in mid-late 2002 CIO/IT organization perspective (dominantly) Study conducted by ECAR, authored by Kvavik and Katz, with a significant research team Quantitative, qualitative, and case study methodologies employed *New = implemented 7/1995 – 7/2002

Page 4 Caveats Sample is not random – sample bias (acceptable) Small N in sub populations (Carnegie, vendor …)

Page 5 The study addressed four questions: What is ERP and why should universities invest in it – the business case? What is the current status of ERP implementation nationally? What were the perceived benefits and costs? What lessons were learned? And lastly, what is next?

Page 6 The survey respondents were mostly CIOs and other IT professionals 43% of respondents have been in their positions for five or more years 62% of respondents have been with their institution for five or more years N=480

Page 7 The majority of respondents participated in the entire ERP project in a significant role When Did Respondents Join the Project? 78% of respondents indicated that they played a significant role on the project, either as an executive sponsor, project leader, management team member, or functional / technical specialist N=257

Page 8 Identifying who implemented ERP for purposes of this study Gartner described ERP systems as having the following attributes. This definition was adopted for purposes of this study. ­Multiple in scope, tracking a range of activities including Human Resources Systems (HR), Student Information Systems, and Financial Systems ­Integrated, meaning when data is added in one area, information in all areas and related functions, also change ­Modular in structure ­Industry specific solutions that enhance standard systems by providing best practices for key business processes In addition, this study bounded survey responses with the following criteria: ­Institutions had to have implemented at least one vendor-supplied Finance, HR, or Student module ­Implementations must have been completed after July 1, of 480 (54%) institutions responding to the survey implemented ERP, according to these criteria

Page 9 The largest number of implementations were reported in the 1998 – 2000 timeframe N= 646 total implementations

Page 10 SCT (30%), PeopleSoft (25%) and Datatel (19%) installed the most modules for our respondents N= 646 total implementations

Page 11 Distinctive purchasing patterns were evident in each Carnegie Class Carnegie Class/ERP module FinancialHRStudent Doctoral Intensive SCT/PeopleSoft Doctoral Extensive PeopleSoft SCT/PeopleSoft MASCT/PeopleSoft SCT/Datatel BAJenzabar/SCTSCT/DatatelJenzabar/Datatel AASCT/PeopleSoft CanadaSCT/Datatel Top two vendors, by number of reported implementations, for each Carnegie Class group

Page 12 What combination of modules were installed? Module combinationsNumberPercent Financial only176% HR only41% Student only6824% Financial and HR7125% Financial and Student2810% HR and Student52% All three9633% Of those who have not implemented all three modules but planned to install additional modules in the future, 56% say they are following a phased implementation plan, and haven’t finished yet

Page 13 Six primary reasons emerged for package selection decisions Why did institutions pick a particular vendor? Respondents were asked to “pick all that apply” Note that this does not necessarily mean that these were the most important reasons packages were selected – just that they played a role in the decision

Page 14 The primary reason institutions implemented ERP was to replace aging legacy systems Mean of Factors Identified Respondents were asked to gauge the importance of each of these factors, with “1” being “most important” Frequencies of factor identified as “most important” Respondents were asked to select one of these as the primary reason they implemented an ERP system The pattern of responses was similar across Carnegie Classes

Page 15 Cost of ERP and viability of legacy systems are the most important factors preventing wider adoption of packaged software Respondents were asked to “select all that apply”

Page 16 ERP implementations were more difficult than other large technology projects, particularly around process change Difficulty compared to other large technology projects Respondents were asked to assess overall difficulty on a 1-5 scale, with 1 being “Very Easy”, 3 being “About the Same”, and 5 being “Very Difficult”

Page 17 The largest obstacles to ERP implementations were internal to the institutions Respondents were asked to select the three largest obstacles to implementing each system. Responses are ranked by weighted means

Page 18 CIOs and business officers were most involved with ERP implementations Respondents were asked to assess overall difficulty on a 1-4 scale, with 1 being “Not At All”, and 4 being “Active Involvement”. Figures represent weighted means

Page 19 Consultants played a role in a significant number of implementations Project Activity FinancialHRStudent Training112 Upgrades264 Project management338 Ongoing support423 System selection541 System design676 Project planning755 Technical implementation887 Process redesign999 Consultant Support For Implementation Activities Figures represent rank order of percentage of project team comprised of consultants 2/3 of respondents used consultants for at least one aspect of their implementation Consultants were used more frequently for Student implementations 90% of respondents agreed or strongly agreed that consultants helped the institution achieve its implementation objectives 2/3 of respondents felt their consulting dollars were well spent. However, 50% indicated concern with prices that exceeded estimates, or fees that were not tied to achieving milestones

Page 20 Most implementations were reported to be finished on their original timeline and budget Budget/SystemFinancialHRStudent On or under budget68%73%68% Over budget by up to 50%28%24%27% Over budget by more than 50%4%3%5% 60% of respondents indicated their modules went live within 1-2 years after planning Planning and purchasing took under 1 year at 80% of institutions On average, Financial systems went in the quickest, and Student the slowest

Page 21 “Plain vanilla” was the preferred implementation strategy, and most institutions came close Customization was found to be the most statistically significant variable affecting project outcomes Doctoral institutions were the most likely to customize, across all modules Overall, Student systems were the most heavily customized HR Systems in private institutions showed by far the least degree of customization

Page 22 No major project management issues were apparent, although the responses show room for improvement Responses represent a 1-4 scale, with 1 being “Strongly Disagree”, and 4 being “Strongly Agree”. Figures represent weighted means Full-time project managers were assigned at 55% of institutions 75% of project managers were internal, 10% external, and 15% joint internal and external 54% of the project managers had no previous experience implementing ERP, and 75% had not implemented the chosen package before

Page 23 For the majority of institutions, desired project outcomes were mostly achieved We asked our respondents whether they achieved their intended project outcomes. 124 or 51% answered yes, 112 or 46% partially, and only 6 or 3% answered no

Page 24 However, the benefits of ERP are not immediate in many cases, and may require institutional change to achieve How long to achieve desired outcomes? FrequencyPercent Immediately4821% Within three months3415% Within three to six months3918% Within six months to one year5524% Over one year4922% 54% of respondents indicated that their institutional productivity dropped immediately after the implementation 70% indicated that their productivity has improved today 69% indicated that the workload at both the central and departmental level has increased 66% believe the nature of the work performed by the institution’s employees has changed significantly

Page 25 The majority of respondents indicated their institutions received major benefits from ERP The respondents were asked to assess the impact the ERP had on management, students, staff, and faculty 87% perceived significant benefit for management, 85% for staff, 78% for students, and 68% for faculty 85% of respondents indicated that their implementation was worth the cost

Page 26 The majority of respondents indicated they would take a similar approach again, with some improvements The respondents were asked whether they would build or buy if they were to do it again. 88% would buy, 7% would build, and 5% had no opinion. Two-thirds of the respondents would use a similar approach if they were to do an ERP project again. 46%, of the non-ERP schools would continue with their current approach.

Page 27 Support costs went up in many instances Responses represent a 1-7 scale, with 1 being “Increased Significantly”, 5 being “Did not Change”, and 7 being “Decreased Significantly” Responses are ordered by weighted means

Page 28 ERP implementations are ongoing, with new components being added at many institutions

Page 29 A Word About Non-Implementers (n=203)