Challenges Facing Ports Today Containership capacities and containership fleet continues to expand Global economic development leading to growing world.

Slides:



Advertisements
Similar presentations
Alabama State Port Authority Infrastructure for Tomorrows Market October 2005.
Advertisements

Update on the Port of Long Beach Doug Thiessen, P.E. ACEC LA
ICTT Vallarpadam First Trans-shipment terminal in India.
Corporate Presentation
STAR Reefers Presentation November Presentation 23 November Reefer Market Caracteristics Reefer Market Caracteristics Commodities in specialised.
SEE Port Development A Variation on the Story of the Rabbit and the Turtle Erich Cossutta, President Confindustria Serbia.
NCFRP 04: Identifying and Using Low-Cost and Quickly Implementable Ways to Address Freight System Mobility Constraints Presenter: Joan Yim (CH2MHill) Project.
GLOBAL TRENDS IN MULTIMODAL TRANSPORTATION Legal Status of Intermodal Logistics and facing challenges in the global supply chain Presenter: Dr. Carrol.
Planned Expansion of the Panama Canal a brief discussion of the potential effects Western Dredging Association, Eastern & Gulf Chapters 2007 Fall Meeting,
CONTAINER TERMINAL FSC Container Terminal FSC Company Presentation December 2010.
1 Mike O’Brien Port Facilities Security Officer Infrastructure Interdependencies May 2, 2012.
1 Presentation for the 11th Annual Atlantic Intracoastal Waterway Conference By David B. Sanford Director, Navigation Policy & Legislation American Association.
Georgia's transportation systems
Department of Industrial Engineering1 Economic Evaluation of the Impact of Waterways on the Port of Cincinnati-Tristate Heather Nachtmann, Ph.D. River.
Use of hubs in the Container Terminal Industry Carl Jensen, Vice President APM Terminals International (Singapore Regional Office) IAPH Forum, HCMC Vietnam.
Metroplan Orlando Freight Advisory Council July 23, 2012 Stephanie Lane CSX Regional Development.
Theodore Roosevelt Expressway Annual Meeting Watford City, November 26, 2013 Plenty to Do… Amid Growing Opportunities Joe Kiely Vice President of Operations.
“Does Moving from A to Z Matter?” Thoughts on Freight Corridors in the Southeast.
The diversified customer base of APM Terminals.  We currently serve more than 60 container lines across our facilities world-wide.  Our key Client Program.
Uniport Multipurpose Terminals B.V.
DCT GDANSK GDANSK BECOMES THE NEW GATEWAY FOR RUSSIA AND THE CEE European Economic Congress, May 15th Boris Wenzel Chief Executive Officer DCT Gdansk 0.
13 June 2007 Securing the lifeblood of the NSW economy Presentation to the BTRE Transport Colloquium Presentation by Greg Martin Chief Executive Sydney.
The 2011 Rail Conference: Moving Freight and Passengers in the 21 st Century Seaports and Freight Rail Eric D. Johnson Executive Director Washington Public.
Mission Promoting the development and growth of maritime shipping via the kingdom's national port of Aqaba through; mobilizing business skills and concepts.
 Hartsfield–Jackson is ranked as the world's busiest airport, both in passengers and number of flights.  In 2011 it accommodated 92 million passengers.
HOW DO YOU DESCRIBE A CONTAINERPORT? Henry S. Marcus Massachusetts Institute of Technology.
SHIPPING,TRADE TRENDS AND THEIR IMPACTS ON PORT INFRASTRUCTURE
Port of New Orleans Pat Gallwey Chief Operating Officer Port of New Orleans Counselors of Real Estate Oct. 13, 2009.
Maritime Transport Sector Infrastructure Imperatives June 2006, CSME Roland Malins-Smith.
PORT EVERGLADES. 3.7 MILLION CRUISE GUESTS 6 MILLION TONS OF CARGO AND 924,000 CONTAINERS The total value of economic activity at Port Everglades in FY.
“Rail – The Intermodal Connection” AASHTO SCORT – Portland, ME
Global Appalachia Access and Opportunity in the Global Economy of the 21 st Century.
PNWA Summer Conference Port of Grays Harbor: Proposed Crude By Rail Projects June 23, 2014 Kayla Dunlap Public Affairs Specialist.
NCBFAA Government Affairs Conference September 24, 2007 Vessel Operators and Non-Vessel Operators: Partners or Adversaries in Contract Negotiation? Tim.
Logistics Aspects & Multi-Modal Transportation 29 November 2004 Presented by Peter O. Lehman, Esq. Director, Planning & Business Development South Carolina.
IHS Consulting U.S. Economic Outlook FHWA Talking Freight Seminar Steve Owens Consultant, Commodity Flow Analysis & Forecasting February 16, 2011.
Port Financial Management Challenges Financing Freight Transportation Improvements St. Louis, Missouri April 29 to May 2, 2001 Financing Freight Transportation.
Planning for the Panama Canal Expansion – A Port Perspective Richard Wainio Port Director and Chief Executive Tampa Port Authority October 21, 2009.
Network Appalachia Access to Global Opportunity in the 21 st Century.
America’s Port Future Ports – Annual Conference San Pedro, California June 23, 2014 Port of Los Angeles.
General Organisation of Sea Ports (GOP)1 Kingdom Of Bahrain General Organisation of Sea Ports Bader Hood Al Mahmood Head, Port Operations & Regulations.
University of Gothenburg, School of Business, Economics and Law, March 1, 2013 Global Containerized Maritime Shipping: Emergence and Divergence Jean-Paul.
Port Everglades Master / Vision Plan Status Broward County Board of County Commissioners May 4 th, 2010.
GROWTH OF THE MARITIME INDUSTRY IN THE GULF REGION AND THE DEMAND FOR QUALIFIED MARITIME PROFESSIONALS AMERICA’S ENERGY COAST LEADERSHIP HEARING GALVESTON,
 LOCATION: -Located on the left side of Thi Vai river, 5 km from the confluence of Cai Mep Thi Vai and 29.7km (18 NM) away from the “ zero” bouy of Vung.
Interim Report on Cutting Cost and Time in Maritime Container Transport Maritime Experts Group 23 May 2006 Hanoi, Viet Nam 27th APEC Transportation Working.
Harbors Module NH2: Problem Identification, Inventory and Forecast, and Determination of Objectives and Constraints.
Network Appalachia Access to Opportunity in the Global Economy of the 21 st Century.
Alabama Water Resources Assoc. * September 5-7, 2007 * CAWA Emerging Opportunities for Our Inland Waterways Alabama Water Resources Association September.
Jeff Florin Deputy Executive Director, Operations Virginia Port Authority Capital Outlay Program & Facilities Maintenance Overview Board of Commissioners.
SWFL Mini Freight Summit October 8, :00 pm - 4:30 pm Lee County Port Authority Airport Training and Conference Center Air Cargo Lane Fort Myers.
Djibouti Ports – DP World Jérôme Martins Oliveira
James M. Dwyer, Maryland Port Administration National Maritime Strategy Roundtable Global Competitiveness Port’s Challenge May 16, 2016.
Djibouti Ports – DP WorldPresented By Jérôme Martins Oliveira CHIEF EXECUTIVE OFFICER.
Linking Northern, Central and Southern California to the world and the nation.
Stewards of Tomorrow 1 THE PORT OF VIRGINIA: KEEPING VIRGINIA’S ECONOMY MOVING JOSEPH P. RUDDY CHIEF INNOVATION OFFICER MAY 19, 2016 JOSEPH P. RUDDY CHIEF.
PORT OF TACOMA. Request adoption of Resolution , developing a Port of Tacoma Drayage Truck Improvement Program to improve the local and regional.
Contents  Port Side handling of containers  Issues  New Levels of service standards.  Increasing Terminal Capacities.
Port of Everett MASTER PLAN UPDATE April 8, 2008.
H:\VERTR\SEKR\neue Präsi\Entwurf.ppt The importance of RoRo traffic within the Baltic Sea Jörg Ullrich, Lübecker Hafen-Gesellschaft mbH – Port of Lübeck.
Infrastructure and Shipping in Taiwan
North Georgia Water Resources Partnership
MUUGA CONTAINER TERMINAL.
Global Influences on the Workboat Market
PORT OF EVERETT MARINE TERMINALS MASTER PLAN UPDATE
Djibouti Ports – DP WorldPresented By Jérôme Martins Oliveira CHIEF EXECUTIVE OFFICER.
Presentation November
Introduction: Aden Container Terminal is the largest container terminal in Yemen and currently operated by the Aden Ports Development company (APDC). The.
Presentation transcript:

Challenges Facing Ports Today Containership capacities and containership fleet continues to expand Global economic development leading to growing world trade Emerging markets lacking suitable infrastructure Global container traffic is expected to double by 2014 Capacity issues in major port locations Infrastructure issues in major port locations Capacity issues in inland infrastructure –Highway Network –East-West Rail Network Increase in Environmental Restrictions

Evaluation Criteria of Business Development Group Overall global development objectives Development/update of port and terminal capacity levels Market analysis Identification of local and/or regional capacity issues Project Duration Identification of key market location Key Client relationship/joint venture opportunities Trade Lane analysis Growth opportunities in local region Competitive position Benefits/Local port conditions

Benefits of the Port of Mobile 45 foot Channel and 3 hours steam time from sea buoy. Planned turning basin to accommodate up to 8000 TEU vessels Strong commodity base including Automotive, Poultry, Apparel, Chemicals and Forest Products Balanced cargo flow Favorable Labor Environment Well established highway network – Adjacent to I-10 – 5 miles from I-65 Opportunity to serve inland markets via waterway network Access to 5 Class 1 Railroads – Available North-South Rail Capacity Competitive inland costs to South Atlantic and Mid-West by all modes Future expansion opportunities

Distances from the Port of Mobile DestinationDistance Kingston, Jamaica1108 Miles Freeport, Bahamas749 Miles Manzanillo, Panama1370 Miles

Key Trucking Markets in 4 Hour Increments

Rail Connections in the Port of Mobile

Inland River System from the Port of Mobile

Southeast Distribution Centers

Background of Mobile Container Terminal, LLC. Mobile Container Terminal is joint venture between APM Terminals North America and Terminal Link USA. APMT holds an 80% share and will be the operating company for MCT. Terminal Link USA is a terminal operating company owned by CMA-CGM and is currently expanding into several US markets. MCT is currently pursuing opportunities with steamship lines for direct calls to Mobile.

ASPA Construction Schedule Yard –Uplands area available for handover to allow for MCT building construction. –Phase 1 Yard completion by November ’07. –Surcharge of southern 1000’ of berth complete by November ’07. Wharf –2000’ of deck poured. –Punch list items being addressed. –Berth dredging to commence November ’07. Access Road Improvements –Plans currently being finalized for improvements to Virginia St. and Ezra Trice Blvd providing for elevated track crossing. –Estimated start date December ‘07. –Project Duration 12 to 18 months

Mobile Container Terminal Specifics Phase 1 construction will total 95 acres –Throughput capacity at start up will total 350,000 TEU –178 Reefer Plugs –Buildings and Gate Complex –SWM, Utilities, Security, Lighting, and Paving Phase 2 construction will add an additional 40 acres –Throughout capacity upon completion will total 550,000 TEU –300 Reefer Plugs –Estimated to be needed within 5 years from start of operations Phase 3 construction will convert the facility to an RTG grounded facility –Full build out capacity will total 800,000 TEU –Estimated to be needed within 12 years from start of opeations Wharf Length: 2,000 feet Draft alongside: 45 feet

Mobile Container Terminal October 2007

Mobile Container Terminal at Completion of Phase 1

Mobile Container Terminal at Full Build Out

Mobile Container Terminal and Future ICTF

Administration Building

Ship to Shore Cranes 18 Wide Post Panamax 100’ Gauge

MCT Construction Schedule and Milestone Dates ZPMC Arrival2/27/2008 Stage 1 – Power to Cranes4/2/2008 Crane 1 Commissioned4/14/2008 Crane 2 Commissioned4/21/2008 Stage 2 – Power/Utilities to Buildings6/1/2008 Delivery of 2 Linde Reachstackers6/1/2008 Administration Building Complete6/20/2008 M&R Building Complete7/25/2008 Stage 3 – Gate Delivery7/31/2008 Delivery of 3 Linde Reachstackers8/1/2008 Stage 4 – Yard Delivery8/30/2008 Gate Opening9/2008 First Vessel Call9/2008 Phase 1 Complete3/28/2009

MCT Outstanding Schedule and Milestone Dates IT Infrastructure RFP/Contract11/15/07 Gate Technology/Infrastructure RFP/Contract12/1/07 Labor Contracts12/31/07 Terminal Service Contracts1/30/08 Terminal Tariff1/30/08 Operations Staff Hiring5/1/08 Terminal Equipment7/1/08 –Empty Handlers –Yard Hustlers –Support Equipment Forklifts Bombcarts Terminal Vehicles

Contacts Mobile Container Terminal, LLC. Brian Clark Project Director office cell APM Terminals North America Henrik Friis Vice President Sales and Marketing