CREZ Optimization Studies Scenario 2, Alternative 4: Low Impedance Backbone for Wind Connections Cathey Carter, PE RPG CREZ meeting 12/14/2007.

Slides:



Advertisements
Similar presentations
Central California Clean Energy Transmission Project
Advertisements

Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
4 Natural Regions of Texas
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
Eau Claire Area Study Northern MAPP Subregional Planning Group January 11, 2007 Daniel Kline.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Navarro to Houston Presentation to ERCOT RPG August 27, 2013.
BRAZOS ELECTRIC COOPERATIVE Dobbin 345 Project David Albers, P.E. Manager – System Planning.
Regions of Texas Essential Question: How do physical and human characteristics distinguish the four regions of Texas?
Technical Advisory Committee December 6, 2010 Summary of the CREZ Reactive Study Warren Lasher Manager, Long-Term Planning and Policy.
ERCOT PUBLIC 5/20/ RTP July 22, ERCOT PUBLIC 5/20/ Outline  Updates to 2014 RTP  RTP Next steps.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
RTP Update RPG Meeting July 21, RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.
1 Local Area Planning Update to TRANSAC – September 18, 2014.
Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman Planning Engineer ERCOT.
October 12, 2007 ERCOT Regional Planning Group Meeting RPG-CREZ Task Force Status Report Warren Lasher System Assessment.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Aug 14, 2009 Regional Planning Group Proposed CREZ Project Modifications Warren Lasher Manager, System Assessment.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
EASTERN PLAINS TRANSMISSION PROJECT Tri-State Generation & Transmission and Western Area Power Administration.
July 13, 2012 Transmission Needs Analysis Scenario 1 Update: BAU All Technologies.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Managing West Texas Wind SWEDE 2008 Conference May 2, 2008 Presented by Paul Hassink AEPSC Texas Transmission Planning.
Katy Freeway 40 mile section of IH 10 from downtown Houston to the Brazos River Constructed in the 1960’s Design capacity of 79,200 vehicles per day –Pavement.
1 Entergy Texas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
1 Transmission Advisory Group Meeting January 25, 2007 Raleigh, NC.
Aug 17, 2012 RPG Meeting KEC & MEC – Load Addition Project – ERCOT Independent Review Ehsan Ur Rehman Planning Engineer ERCOT.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
West to North CSC Location Scenario 3b WMS August 20, 2008.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
December 7, 2012 Transmission Needs Analysis Scenario 5/7 Update.
Unit 1. A region is an area that is used to identify and organize areas of the Earth’s surface for various purposes.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
Unit 1 TEXAS.
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
April 16, 2010 RPG Meeting Lamesa Area Upgrades ERCOT Independent Review Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
February 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
OCTOBER 2, 2013 Maine 2013 Outage Coordination Redacted Copy.
© 2000 PACIFICORP | PAGE 1 SOUTHWEST UTAH AREA STUDY SEPTEMBER 2014 Nathan Wilson/Talmage Daley Need to review the LOADS before Friday.
3/28/2008 RPG CREZ Meeting CREZ Transmission Optimization (CTO) Study And The Oscar Goes To… Warren Lasher Manager, System Assessment.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
SCENARIO 2 PRESENTATION 345KV ALTERNATIVES ROBERT LONA SENIOR CONSULTANT ERCOT SYSTEM PLANNING 1/25/2008.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
August 24, 2007 ERCOT Regional Planning Group Meeting CREZ Transmission Optimization Study Warren Lasher System Assessment.
December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment.
October, 2009 Congestion Report Isabel Flores. 2 October, 2009 Background Provide trend of local congestion costs for last 13 months Costs shown in millions.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
LINE 69H REBUILD AND CONVERSION PROJECT ERCOT Regional Planning Group April 21,2016.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
2008 Annual Five Year Plan Update 4 For RPG-CREZ Meeting 12/14/2007 Department of Regional Planning Harry Liu.
1 Entergy Gulf States, Inc. (Texas) Approved & Proposed Transmission Reliability Projects Entergy/ETEC Subcommittee Meeting The Woodlands, TX November.
Houston Import Project – ERCOT Independent Review
Houston Import Study Update
Entergy Integration Study Update
Warren Lasher Manager, Long-Term Planning and Policy
4 Natural Regions of Texas
Presentation transcript:

CREZ Optimization Studies Scenario 2, Alternative 4: Low Impedance Backbone for Wind Connections Cathey Carter, PE RPG CREZ meeting 12/14/2007

2 Description This solution starts with a transmission backbone between one central point and the three load centers. The central point is not connected to the existing network. The endpoints are Zenith near Houston, Trinity between Dallas and Fort Worth, and West Gate outside Austin – San Antonio. Each endpoint must be well developed to the local load-delivery network. Additional substations can be installed any where on the lines to attach new generation.

3 Goals 1.Reduce impedance and phase angles between the three heaviest load areas. 2.Provide a strong “target” for new transmission lines from large new generation sources. Any big generator could build to the closest part of the backbone. 3.Reduce loading on existing major paths.

4 Other Possible Effects, Good and Bad 1.Improve dynamic stability? 2.Decrease loading on the biggest existing transmission paths. 3.Reduce nodal price differences among the load centers? 4.Possibly the maximum construction cost. 5.Likely public opposition along ROW, which is true for any new construction. 6.Will require upgrades of existing network for n-1 security.

5

6 Current Status of Study = Incomplete Zenith Sub Connections: 50 mile 765kV line to Bryan rated 6625 MVA (2) 2100 MVA autos to 345kV system (2) 345kV lines to O’Brien, each rated 1450 MVA (2) 345kV lines to Singleton, each rated 1450 MVA (2) 345kV lines to TH Wharton, each rated 1499 MVA

7 Current Status of Study = Incomplete Bryan Sub Connections: 50 mile 765kV line to Milam rated 6625 MVA 50 mile 765kV line to Zenith rated 6625 MVA (1) 2100 MVA kV auto, new 345kV bus (1) 600 MVA kV auto, new 138kV bus 10 miles 138kV line to BRYN_SWTCH rated 469 MVA 10 mile 138kV line to BRYN_DSBY rated 469 MVA

8 Current Status of Study = Incomplete Milam Sub Connections: 50 mile 765kV line to Bryan rated 6625 MVA 70 mile 765kV line to Corsicana rated 6625 MVA 35 mile 765kV line to Mid rated 6625 MVA

9 Current Status of Study = Incomplete Corsicana Sub Connections: 70 mile 765kV line to Milam rated 6625 MVA 75 mile 765kV line to Trinity rated 6625 MVA (2) 2100 MVA autos to new 345kV bus at existing crossing of two transmission corridors (2) 345kV lines to Venus rated 1072 MVA (2) 345kV lines to Watermill rated 1631 MVA (2) 345kV lines to Big Brown rated 1072 MVA (2) 345kV lines to Limestone rated 1631 MVA

10 Current Status of Study = Incomplete Trinity Sub Connections: 75 mile 765kV line to Corsicana rated 6625 MVA (2) 2100 MVA autos to new 345kV bus (1) 345kV line to Benbrook rated 2988 MVA (2) 345kV lines to Everman rated 2988 MVA (2) 345kV lines to Liggett rated 2988 MVA (1) 345kV line to Hicks rated 2988 MVA (1) 345kV line to Saginaw rated 2988 MVA, plus (2) 800 MVA kV autos at Saginaw (1) 600 MVA kV auto to existing Trinity 138kV bus

11 Current Status of Study = Incomplete Mid Sub Connections: 35 mile 765kV line to Milam rated 6625 MVA 65 mile 765kV line to West Gate rated 6625 MVA (2) 2100 MVA kV autos (2) 345kV lines to Salado rated 1631 MVA (1) 345kV line to Zorn rated 1630 MVA (1) 345kV line to GILLE345 rated 1630 MVA (1) 686 MVA kV auto

12 Current Status of Study = Incomplete West Gate Sub Connections: 65 mile 765kV line to Mid rated 6625 MVA (2) 2100 MVA kV autos (1) 345kV line to Red Creek rated 3000 MVA (1) 345kV line to Willow rated 1959 MVA (1) 345kV line to Gillespie rated 1959 MVA, plus (2) 800 MVA kV autos, and a 345kV line to Kendall also rated 1959 MVA (1) 345kV line to Lampasas rated 1959, plus (2) 800 MVA kV autos

13 Current Status of Study = Incomplete Other New Lines in the Model: 32 mile 345kV Hicks-Willow 2 nd Willow – Jacksboro 345kV line on same towers 2 nd Oklaunion – Bowman 345kV line on separate ROW 2 nd 345kV Twin Buttes – Red Creek line, separate ROW 20 mile 345kV Bitter Creek – Bluff Creek line 130 mile 345kV Bluff Creek – Lampasas line 30 mile 345kV Goat – Red Creek line 130 mile 345kV Red Creek – West Gate line

14 Current Status of Study = Incomplete Other Changes to the Model, not Lines: 345kV ring bus at Paint Creek, not connected to anything else All 69kV and 138kV lines between Abilene and Stephenville converted to short radials Trinity 138kV buses connected. (2) kV autos at IRV Valley Ranch 138kV load and capbank moved from Hurst N to Hurst S 69kV Seymour – Bomarton disconnected 69kV Winters – Hatch disconnected 345kV connection to Big Spring, and 138kV Midland East – Big Spring rebuilt for 469 MVA

15 Comments Please direct comments to Warren Lasher or Cathey Carter. Warren: Cathey: