Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs.

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

Module Floor Systems.
Buildings and Structures 1
FVCC Fire Rescue Forcible Entry.
Rest Rooms Concessions Rest Rooms Concessions CAUTION TAPE Block sidewalk for safety of bands and spectators. BACK GATE Band Entrance Coordinate and Check.
Personal Mobility Lift Capstone Team Members: Jim Folgate Bill Beers Ryan Pelton David Zuercher.
Heavy Concrete Construction Formwork
Copyright © by NCCER, Published by Pearson Education, Inc. Carpentry Fundamentals Level One Module National Center for Construction Education.
INAR 243 FLOORS.  Structural element  Proper ground for functions.
EDT Foundation Plan Design1 Weekend Cabin Retreat Project Foundations Sacramento City College EDT 300.
Wall construction steps and illustrations Incan construction.
Wilson School Construction 2014 Tearing out the old courtyard to put in the new sewer line.
1000 Trees Housing Pvt. Ltd. Front External Landscape Sample Flat.
Chapter 34 Bridge Construction.
Unit 42 Floor Framing Floor Unit Resting on Sill Plates • Floor Unit Resting on Cripple Walls • Posts and Beams • Floor Joists • Subfloor • Floor Underlayment.
Stairways and Ladders 1926 Subpart X - Stairways and Ladders
Construction Cost Estimating Class #5 - Concrete Prof. Ralph V. Locurcio, PE.
OSHA Office of Training & Education
OSHAX.org - The Unofficial Guide to the OSHA1 Stairways and Ladders.
Stairways and Ladders.
1 Telecom Cabling Ladder safety. 2 OSHA Office of Training & Education ation Telecom Cabling Stairways and Ladders.
Structures Mrs. Bader. Definition Slide Structure - an arrangement of parts.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
Developments as of Dec OUR ENTRANCE TO WORLD ENVISION Still we have to construct a gate and arch which will be done by February 2013 hopefully.
Fence Example 5-wire barbed. Storing posts before use If posts are left lying on the ground they are prone to rot and insect damage.
Metal Forging Chapter 3.13.
LADDER & STAIRWAY SAFETY
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Floor Systems and Foundation Support
"Secure Wall" High Security Fence System * Patent Pending * Created and Fabricated by: South Lyon Fence Co., Inc.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
Fences in Front Yards and Along Saltwater Canals City Council Workshop March 31, 2015.
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Route 364 (Page Ave. Extension) The Missouri Department of Transportation.
8 th Grade Industrial Technology 8 th Grade Industrial Technology.
Basic Building Techniques. Exploration Time Use the next 15 minutes to build. After the 15 minutes are up, everything will need to be broken apart and.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
School Building ready for Slab casting.. View of the Children's Home.
Wall and Ceiling Construction
CHAPTER 4, SECTION 2 Access and Key Control. Access Control Equipment  Hall mirrors  Closed-circuit televisions  Parking lot gates  Exit doors and.
Hot work permit.
Building Plans.
FORMS, SCAFFOLDING and STAGING
MNM Fatal Falling Material Accident Falling Material Accident April 4, 2013 (Arizona) April 4, 2013 (Arizona) Copper Operation Copper Operation.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Personnel David Lipscomb, CEO Nathan Andreu, Chief Engineer Nathan Ruggieri, Technical Advisor Lisa Ellis, Technical Advisor Personnel David Lipscomb,
Definitions of terms associated with concrete masonry units A.Masonry Units: Blocks made from concrete, cinders, or other aggregates. B.Laying Block:
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
THS Automotive Technology Safety Lesson 3: Raising and Supporting Vehicles Safely Raising and Supporting Vehicles Safely.
Access for All – The WMI Elevator Project What started as a dream several years ago is now becoming a reality. By the fall of 2010, the WMI will have a.
Photo Tour of Building an Earthship 11 Sep 1999 – 2 Nov 2011 Section 1.2 by Ron and Joy Oliver.
AFFORDABLE HOUSING & MUCH MORE
What will be done I will be installing an area for a kindergarten playground. Next year the school is moving to full day kindergarten and a playground.
Cupid Shuffle.  Everyone find a line on the floor and face the stage.  Now put your arms stretched out to your sides, you should not be able to touch.
Constructions… Before class starts, get a ruler, compass, and one piece of candy from the round table on the North side of the room by the fish tank. Then,
SOUTH LAGUNA TUNNEL STABILIZATION & SEWER PIPELINE REPLACEMENT PROJECT Providing Quality Water & Wastewater Services To the Coastal Communities.
Gonzales Iron Works Custom Steel Awnings Austin TX
Gonzales Iron Works Custom Metal Fabrication Austin TX
ERECT AND DISMANTLE STEEL TUBULAR SCAFFOLDING WITHIN OSHA GUIDELINES.
New Vehicle Construction
Construction Technology
Metal Forging.
Total Fitness Gym By Student Architect Jhonatan Rubio
INDOOR BASEBALL / SOFTBALL FACILITY
Structures Mr. Hickey.
External Views of Entrance and exit
By Penelope Smith and Alan Vara
START DIRECTIONS QUIZ.
Avera St. Luke’s Therapy Addition January 2012 Update
PRESENTATION TITLE HERE
Presentation transcript:

Congratulations on a Great 2007 Summer Here is an update on work at the MIT Campus and an outline of urgent needs

H building progress (Dorm)

H building progress Jeff Winston welding the metal beams on the H Building Pastor Joel and his crew assembled the main support beam and lifted the cross beams

H Building update The Block work on the North side of the building is nearly done Next we will put up the beams on the North side

Fall 2007 Security and Safety measures It is our goal to completely secure the property by the end of 2007! We will do this in four phases.

Phase 1 Metal Fence Construction along the North Wall Priorities: –Safe and Secure environment –Open and inviting place for ministry

Phase 1 Metal Fence Construction along the North Wall Each fence section costs $ All 13 sections cost a total of $4,252 (including material and labor)

Phase 1 Metal Fence Construction along the North Wall The metal fencing will provide the necessary security! The metal fencing will allow for a transparent and inviting ministry environment

Phase 2 Metal Gate North Wall main entrance The main gate will be built to last! Two 15’ wide by 8’ high gates will span the 30’ opening 4” steel gate posts, Solid steel beams Built to take abuse even from a 15 passenger van!

Phase 2 Metal Gate North Wall main entrance $710 USD The price for Materials and Labor for this 30 foot wide double gate!

Phase 3 Finish the Rest of the Block Wall We are nearly finished!!!! The block parts of the wall are 94% finished! We only need 900 more blocks to be done with the block wall FOREVER!!!

Phase 3 Finish the Rest of the Block Wall $1066 USD For materials and labor This includes filling in the block with cement for structural strength and replacing blocks that have fallen out

Phase 4 South Wall gate and metal work 13 fence sections ($327 ea) South Metal Gate ($710)

Totals Phase 1 –Metal fencing on North Wall = $4,252 Phase 2 –30 foot front gate (double hinged) = $710 Phase 3 –Finish ALL Block work on Wall = $1066 Phase 4 –Finish South Wall (gate / sections)= $4,962 Total = $10,992