1 SciFi Results and Comparison Malcolm Ellis, for the MICE Scintillating Fibre Group Abingdon, 31 st October 2003.

Slides:



Advertisements
Similar presentations
Takashi Matsushita Imperial College T. Matsushita 1 Station 5 status.
Advertisements

MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
G.Barber: Mice Tracker Meeting New York1 Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
1 Simulation Status/Plans Malcolm Ellis Sci Fi Tracker Meeting Imperial College, 10 th September 2004.
MICE SciFi-tracker prototype MICE experiment Tracker: alternative technologies SciFi tracker Single-station prototype – mechanical status Single-station.
Status of MICE Tracker System H. Sakamoto, Osaka University (on behalf of the MICE Collaboration) International Muon Ionization Cooling Experiment (MICE)
KEK beam test H. Sakamoto. Purpose To optimize a concentration of the second dopant for scintillating fibers KEK beam test to study light yields for various.
MICE-SciFi team, 14 October 2003 SciFi: progress report Progress: All stations shipped to FNAL … … assembly in progress Measurements: Effect of radiated.
1 Scintillating Fibre Tracker Simulation Malcolm Ellis Imperial College London Tuesday 9 th March 2004.
First Results from Tracker 1  Cryostat Commissioning  AFE/VLSB Firmware and Readout  Cosmic Ray Setup  Tracker Readout  Software  Trigger Timing.
1 Sci Fi Simulation and Reconstruction Status M.Ellis/C.Rogers Wednesday 31 st March 2004.
Tracker Software 1M.Ellis - CM23 - Harbin - 15th January 2009  Four key areas that currently need some work: u Digitisation u Decoding files u Unpacking.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
1 Status of Cosmic Analysis Malcolm Ellis Imperial College London Wednesday 10 th March 2004.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Julia Sedgbeer Mice Collaboration Meeting, June SciFi Tracker – SW Status & Plans General SW status Simulation & Reconstruction Performance Studies.
Prototype Performance in D0 test stand M.Yoshida (Osaka Univ.)
KEK Analysis Report Makoto Yoshida Osaka Univ. 2006/06/10 MICE CM15.
Sci Fi Simulation Status Malcolm Ellis MICE Meeting Osaka, 2 nd August 2004.
KEK Beam Test Koji YOSHIMURA KEK MICE Collaboration Meeting Koji YOSHIMURA KEK MICE Collaboration Meeting
1 Online data quality and monitoring M. Ellis Daresbury DAQ Meeting 31 st August 2005.
February 8 th, 2001 Status Report: SciFi for MICE Edward McKigney Imperial College London.
MICE Video MTG 9/25/2002 MICE Fiber Tracker Design Update Requirements and Proposed Detector Implementations A. Bross Fermilab.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
Clear Fiber and Wave Guide Fab. Makoto YOSHIDA (Osaka Univ.) July MICE FT
QA for the Fibre Tracker 28 October 2004Brunel QA for fibre bundling Dr Paul Kyberd and Dr Peter Hobson School of Engineering & Design Brunel University,
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
1 KEK Beam Test Analysis Hideyuki Sakamoto 15 th MICE Collaboration Meeting 10 st June,2006.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Prototype Performance in D0 test stand & fiber intrinsic performance with KEK test beam M.Yoshida (Osaka Univ.) Osaka.
Tracking Detectors Working Group MICE Collaboration Meeting March 30, 2004 A. Bross.
1 G4MICE Analysis of KEK Test Beam Aron Fish Malcolm Ellis CM15 10th June 2006.
1 Status of the MICE SciFi Tracker Malcolm Ellis Imperial College London Tuesday 9 th March 2004.
6 th April 2005 Malcolm Ellis, Imperial College London 1 Sci Fi Status & KEK Test.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 in UK.
Simulation of a Magnetised Scintillating Detector for the Neutrino Factory Malcolm Ellis & Alan Bross Fermilab International Scoping Study Meeting KEK,
1M. Ellis - MICE Video Conference - 15th March 2007 Software Report  New G4MICE Users  TOF Simulation and Digitisation  SciFi Reconstruction  Tracker.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Measurement of 'intrinsic' properties of scintillating fibers H. Sakamoto Osaka University, Japan A.Sato M. Yoshida Y. Kuno Osaka Univ. K. Yoshimura KEK.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Tracker QA Paul Kyberd Quality Assurance A status report: A procedure for ensuring the quality of the finished tracker has been designed following our.
G.Barber: Mice-International Meeting Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
Tracker Summary Alan Bross MICE CM October 10, 2007.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
Status of cosmic-ray test of the SciFi prototype and SciFi software in G4MICE M. Yoshida (Osaka Univ.)
All DØ Meeting, 12/01/00 Central Fiber Tracker Light Guide Performance Thomas Nunnemann Fermilab 90 days before RunII … (a.k.a. 12/01/00)
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
M. Ellis - MICE Collaboration Meeting - Thursday 28th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
PID simulations Rikard Sandström University of Geneva MICE collaboration meeting RAL.
2005/10/24 MICE CM at RAL, KEK test beam, Makoto Yoshida 1 KEK Beam Test for MICE SciFi Tracker - KEK-PS T585 - M. Yoshida MICE 2005/10/ /10/24.
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
1 Light Yield results from the KEK tracker test using G4MICE M. Ellis Tracker Phone Meeting 25 th January 2006.
Summary of final results from MICE note: “ MICE Scintillating Fibre Tracker Prototype - First progress report - ” M.Yoshida (Osaka Univ.) for the SciFi.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting U.C. Irvine Monday 21 st August 2006 M. Ellis & A. Bross.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
Station Acceptance Test. 22/02/2007 M. Takahashi 2 Lab Layout at IC.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
M. Ellis - MICE Collaboration Meeting - Wednesday 27th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
Online – Data Storage and Processing
Requirements for the Software Group (and agreed actions)
Presentation transcript:

1 SciFi Results and Comparison Malcolm Ellis, for the MICE Scintillating Fibre Group Abingdon, 31 st October 2003

2 The SciFi Group Japan K. Yoshimura KEK Y. Kuno, H. Sakamoto, A. Sato, M. Yoshida, Osaka UK P. Kyberd Brunel A. Khan, L. Tong Edinburgh G. Barber, M. Ellis, K. Georgiou, R. Goncalo, K. Long, J. Sedgbeer, A. Tapper Imperial College London P. Cooke, R. Gamet Liverpool US A. Bross, J. Estrada, J. Krider, R. Rucinski, P. Rubinov FNAL D. Kaplan, Y. Torun Illinois Institute of Technology G. Hanson, A. Klier Riverside X. Yang UCLA

3 The Tracker

4 The Tracker Document Tracker Document asked specific questions, some common to both detectors, others specific to the individual types. I will first show the various things that have been done in the past few months to allow us to say Yes, and then list those few items we have not answered so far.

5 Simulation All software in G4MICE environment Simulation of nominal configuration (0.25% dead channels, 7-1 grouping, 1 GHz RF background, etc…) Position, momentum, x’, y’, t’ resolutions determined No degradation in resolutions for 100x nominal background rate.

6 Position Resolution X Resolution: 570 microns Y Resolution: 430 microns

7 Momentum Resolution P T Resolution: 1.3 MeV/c P L Resolution: 5.8 MeV/c

8 X’ Y’ and T’ X’ Resolution: 7.7 mrad Y’ Resolution: 4.9 mrad T’ Resolution: 6.7 x 10 -3

9 Pattern Recognition Efficiency Number of space points in fitted track (or zero if no track fitted) Most of the time 5 space points are made and fitted in track With no dead channels or background: 99.9 ± 0.1 % Overall tracking efficiency in nominal situation: 99.0 ± 0.5 %

10 Future Improvements Track fit still needs correct treatment of Energy Loss in Kalman package – this will be added soon Track fit currently uses space points, made from intersection of three views in a station. We can add individual fibres as measurements, and thus make full use of all available information Optimise grouping so as to maintain channel count, but increase point resolution at last station (for example).

11 RF Test 201 MHz RF transmitted in close proximity to the VLPC cryostat. Transmitting antenna operated horizontally and vertically Received power measured on scope and compared to Lab G test with the same antenna. Pedestal width increased by 0.5 ADC (0.033 PE)

12 SciFi Properties Clear fibre attenuation length measured: 7.62m Scintillating Fibre is Kuraray SCSF-3HF Light Yield measured for various scintillator types, pT ppm has highest yield at 2.6 PE per MIP, measured with a PMT Systematic effect to be understood, however no cross-talk was observed in any of the scintillating fibres. Aluminized tape 22mm 20 fibers

13 Tracker Prototype Construction Doublets (ribbons, planes, a single view) constructed at Fermilab Waveguides built and tested at KEK/Osaka Carbon Fibre Supports (IC/Liverpool) Planes aligned and glued to carbon fibre supports Fibres bundled into groups of 7 Bundles threaded into connector blocks Bundles potted, cut and polished Final assembly and test at Fermilab

14 Cosmic Ray Data Taking Two 36x36 cm 2 scintillators in coincidence form trigger. Lead sheet used for a momentum filter VLPC timing, pedestal and gains calibrated prior to waveguide connection Light yield measured Proper efficiency, dead channels, tracking to come soon…

15 VLPC Gain pedestal 1p.e. 2p.e. Typical Gain: 15 ADC counts/ p.e. Preamp Gain Setting: 0x350 Gain Setting: 0x150 6 ADC counts/ p.e.

16 Chose events with hits in Upper and Lower Stations Station A Station C X viewV view W view X view > 10 counts to select cosmic-ray

17 Light Yield in Station B X view: PT+3HF 5000ppm W view: PT+3HF 3500ppm V view: PT+3HF 2500ppm W view X view V view Peak at 24 counts  4 p.e. Mean is 4.6 p.e. Expectation from beam test in KEK 2.6 p.e. in 0.35mm scifi QE of VLPC ~ 4 times larger than PMT Transport loss in waveguide ~ 40% assume connection loss ~ 10% at each optical connector  5p.e. This has a large uncertainty due to PMT calibration

18 Expectation based on D0 From measurements with 835 micron fibre and 11.5 m waveguide – expect –10-12 pe in the current MICE prototype configuration Why the discrepancy? –Construction process Aluminisation, ribbon, bundling, connectorising, cutting, polishing, etc. –DAQ Gate timing Under investigation Check DAQ timing –Independent measurement of fibre light yield

19 Single Plane Efficiency Tracking not reliable yet, so calculate lower bound on efficiency Require clear hit in the V and W projections of station B Count hits above threshold in third (middle) station Efficiency  95% - consistent with expectations from light yield and threshold setting

20 Dead Channels Cosmic Data rate low, only 7000 triggers, however in these, there are on average 1.29 channels per plane which never have the highest hit in the plane in an event. This gives an upper estimate for the dead channel rate of 0.6% Note that as with the efficiency, this number has a large uncertainty. We will improve this with tracking.

21 Construction Schedule and Cost Prototype was completed pretty much to schedule and budget. Assume we will build 3 trackers, to allow contingency for R&D, spares. First Iteration schedule has delivery on time in 2006 if we start “now”. Full cost, $1.9M – possible saving of $975k through loan of D0 spares Excellent opportunity for collaboration with D0, but can’t delay decision long.

22 What were the “No” Answers Noise on the mains (filterable) –D0 has experience of such noise in the calorimetry electronics but not in the Fibre Tracker. –Paul has said we may be able to do this at RAL Didn’t measure performance with known sources (this is known, so perhaps lower priority) G4MICE has not yet provided emittance reconstruction

23 Achievements 7 planes (in 3 stations) of Scintillating Fibre detector have been successfully constructed and operated at D0. All simulation and reconstruction software is committed to G4MICE and can be used to check fine details of remaining question marks (P T resolution, etc…)

24 Future Open Issues: –Understanding Light Yield –Resolution in reconstructed parameters and thus emittance We plan to produce a document by the end of the year addressing all aspects (including the open issues)