Ⅱ Ⅱ General Information I I Climate Change Efforts.

Slides:



Advertisements
Similar presentations
D. Y. Patil Collage of Engg & Tech.
Advertisements

TVI Resource Development (Phils), Inc. September Canatuan Tailings Management Completion of Stage 1 Tailings Management Facilties Gossan Dam and.
In The Name Of GOD SEFIDRUD DAM DESILTATION OPERATION by M.H.Ranjbar Taklimy & E. Tolouie Sefidrud Reservoir desiltation committee, Gilan regional water.
John H. Kerr Dam and Reservoir John H. Kerr Dam and Reservoir U.S. Army Corps of Engineers Wilmington District.
MONGOLIA: Cost Benefit Analysis (CBA) Project selection Team members present at the training: Ms.Tsendsuren Batsuuri, Ministry of Environment and Green.
Cascade Charter Township
ENGINEERING GEOLOGICAL STUDIES for DAM CONSTRUCTION
DAMS.
Doosti Dam on shared river of Harirood: A Friendship Bridge Between Iran and Turkmenistan Saeed Nairizi Head of the Board & Managing Director, Toossab.
Mordecai Lincoln Dam & Hunters Pond, Scituate, MA
Dams. Enhanced economic prosperity Public health Agriculture Altered natural environments Reduced streamflows Water quality degradation Fish and wildlife.
Department of Civil Engineering, I.T.U
Placer County Water Agency Middle Fork American River Project Placer County Water Agency Middle Fork American River Project Update on Proposed Project.
Hydrological Information System Module 20 – Integrated Reservoir Monitoring System.
4 th International Symposium on Flood Defence, 6 th – 8 th May 2008, Toronto, Canada Efficiency of distributed flood mitigation measures at watershed scale.
Selection of Capacity Selection of capacity depends on: Physical characteristics Physical characteristics Inflow outflow characteristics Inflow outflow.
DAMS Dams are built for one or more of the following purposes: Irrigation Irrigation Flood Control Flood Control Power Generation Power Generation Water.
Merowe Dam: Details of Site & Engineering Design Suzanne Young February 19, 2004.
Hydro Power By: Gabriel, Joyze, Christine, Ryan F, and Joselle.
THE IMPORTANCE OF THE WATER TANK BUKOVEC TO SUPPLY THE POPULATION OF REGION KOŠICE WITH DRINKING WATER Ing. Jana Hargašová Krajský úrad životného prostredia.
Save Water, Save life Team members: Zihan Qiu , Huiwen Zeng, Yingrong Chen, Yang xin yun.
Aswan Reservoir Jennifer Sieracki. Location Aswan High Dam Begun in 1959 Goals: –Provide water for agriculture –Prevent release of floodwater to the.
Dams Mehmet Özger (Barajlar) Department of Civil Engineering, I.T.U.
Other Construction Projects
Ministry of Land, Infrastructure, Transport and Tourism Risk based Flood Management for adapting to Climate Change March 17, 2009 Toshio OKAZUMI Director.
Evaluation for the Effects of Flood Control
HYDRO POWER SYSTEMS Hydropower is the capture of the energy of moving water for some useful purpose. Hydropower now supplies about 715, 000 MWe or 19%
Irrigation Australia/7 th Asian Regional Conference Assessment of Water Supply Capability in Agricultural Reservoirs according to Climate Change Tuesday.
August 20th, CONTENT 1. Introduction 2. Data and Characteristics 3. Flood analysis 1. MOUSE 2. SOBEK 3. ARC-SWAT 4. Conclusions and suggestions.
Power Plant Construction and QA/QC Section 7.2 – Dams, Spillways, Water Conductors and Power Houses Engineering Technology Division.
Hydro-Electric Power Station Lecture No: 4. “”A generating station which utilizes the potential energy of water at a high level for the generation of.
Neotech Institute of technology Department of Civil Engineering
Climate Change, Extreme Floods, and Dam Safety in Korea
The Three Gorges Dam IB SL. Hydroelectric Power A dam is built to trap water, usually in a valley where there is an existing lake. Water is allowed to.
Middle Fork Project Project Description April 25, 2006.
Three Gorges Dam The Worlds Largest Hydro-Electric Plant.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
The Lake of the Cross The Lake of the Cross is one of the biggest natural dam in Romania and it is located in The Stanisoara Mountains in the village.
O BJECTIVE O F S OIL A ND W ATER C ONSERVATION C ONSERVATION The preservation and careful management of the environment and of natural resources.
2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt 5 pt 1pt Water Cycle Free ResponseStream TablesRiver.
CE 424 HYDROLOGY 1 Instructor: Dr. Saleh A. AlHassoun.
FLOOD MANAGEMENT By: Joyce Mathole Directorate: Hydrological Service Department of Water Affairs and Forestry.
Water resources Pacific school of engineering Department of civil engineering Guide By Group Mimansha Pandya (E)
DAMS Dept. Of Civil Engineering
Hydroelectric Energy Madison, Meghan, Emmet.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
Prevention and Cure. Contents Introduction to Reservoirs Preventing Siltation Cure Cost Benefit Analysis Conclusion.
1 Institute of Energy & Gia Lam Joint Stock Company Development of Krong Pa 2 and implementation issues Dissemination and Training workshop Hanoi December.
Flood Analysis in Geum River & Countermeasure Establishment Flood Analysis in Geum River & Countermeasure Establishment the 8th Hydro Asia 2014 Hydraulic.
Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY.
U.S. Army Corps of Engineers Wilmington District Real-Time Conservation Pool Storage Accounting for the Falls Lake Project.
Water Resources Planning and Management
1st International Workshop on TMDL and Water Quality Management March 28-29, 2007, Korean National Assembly, Seoul, Korea HISTORY AND UPDATES HISTORY AND.
KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute.
NID Data Model based on HUC CE394K.3 Term Project by Seungwon Won December 7, 2000.
Earth Day 2016 Energy, Water, and Climate Initiatives at GSAM April 6 th, 2016 Ryan Ollie, CMVP, EIT Manager of Energy Solutions Advocate Health Care.
Ruttinger & Sons Engineering Designed by: Taylor Kasperick Jacob Wilson Loren Ruttinger Presented by: Loren Ruttinger.
Erdeneburen HPP Project Implementation Unit
Hydropower development of Bulgaria: current state and future outlook Valentin Ivanov Deputy Minister Ministry of Economy and Energy.
Paper Presented by At the Zambezi River Basin Stakeholder Conference : 22 – 23 Nov Windhoek, Namibia Eng. S. Z. Mhlanga Senior Manager (Projects.
Hydrological changes resulting from dam construction
WEE WAH LAKE DAM AND POND No. 3 DAM REHABILITATION PROJECT
HPP USTIKOLINA Sarajevo, May 2017.
GANDHINAGAR INSTITUTE OF TECHNOLOGY
Suresh.R.
Lake Ralph Hall Upper Trinity Basin, Texas
Hydrology CIVL341.
Hydrology CIVL341 Introduction
AICE QUESTION.
PRESENTATION You already know what we will talk about during this presentation, but we are going to try to start a little differently. So....
Presentation transcript:

Ⅱ Ⅱ General Information I I Climate Change Efforts

1. General Information Chuncheon-si, Gangwon province, Korea : Initiated Construction : Completed Construction : Initiated O&M 2 2 Teams, 50 members Soyanggang Dam Soyanggang Dam Seoul Busan Daejeon LocationHistoryOrganization & Personnel

1. General Information Diagram of Dams in the Han-river

Flood control, water supply and electric generation Management of Dam facilities Water quality management Social contribution activities Basin Area : 2,703 ㎢ Reservoir Area : 70 ㎢ Length of reservoir : 66 ㎞ Adjacent city(1) & counties(4) (ChunCheon) & (InJe, HongCheon, YangGu, GoSeong) 1. General Information RolesCatchment Soyanggang Dam

1. General Information Rock Sand & Gravel 540m Crest EL.203m Flood water Lev 198.0m (2.9bil ㎥ ) Restricted Lev during flood 190.3m EL.80m Flood Control Capacity Normal high Lev 193.5m Dead water Lev 130.0m Low water Lev 150.0m Clay Filter Dam Type : Earth Core Rockfill Dam Height / Length : 123m / 530m Gates : B13m * H13m * 5EA B14.7m * H14m * 4EA Generator : 100,000kW * 2EA Structure

Flood reduction (12,620 → 5,500 ㎥ /sec) Preventing cities in downstream from flooding (i.e. : Seoul) Supplying water to downstream areas (i.e. : Seoul & Incheon, etc.) Preventing droughts in downstream areas Can be used by 100,000 families / yr Is equivalent to 160,000-barrel of oil consumption Flood Control : 500 mil. tons Water Supply : 1,213 mil. tons/yr Generation : 353 GWh/yr 1. General Information Benefits

2. Providing Support to the adjacent areas Supporting Farming machines Promoting welfare English village K-water supports areas around Dams through various works. (Amount : approximately 7mil. $) Hosting Mini Concerts at the Dam’s Square Overview

3. Plans to make the Dam more attractive Facilities ImprovementRemodeling of exhibition hall Opening of Dam crest road to touristsScenic lighting

1. The Enhancement of the Flood Control Capacity Installation of an auxiliary spillway for hydrological stability Climate changes (’84, ’90 Flood, Typhoon ‘Lusa’ etc) Reinforcement of dam design standard (Freq. 1,000yr → PMF) Hydrological instability (’99 Precise diagnosis of safety) Before As Is Rainfall (mm/2days) 20,700 12,400 Max inflow (CMS) 14,200 7,500 Max discharging (CMS) Before As Is Before As Is Hydrological Factor Comparison Background

Parking Lot Exhibition hall Square park observatory Inlet Outlet Ecological Park Dam Plant Spillway Access Road  Structure : low-slope tunnel type spillway  Tunnel size : D14m x 2ea(L1=1,276m, L2=1,206m)  Max outflow : 6,700 ㎥ /s (Spillway 7,500 ㎥ /s)  Construction period : 2004 ~ 2010  Construction cost : bil. Won ($154 mil.) Aerial view

DAM3km 8km12km 18km 23km 33km 43km ’ Turbid water Inflow Highly turbid water inflow after heavy rainfalls in ’06 ~ ’07 - Max turbidity : 328 NTU - Discharging duration : 226 days(<10NTU) Soil loss from landslide, roads and river bank loss by heavy rain Sand and clay loss from alpine region farm 2. The facility of a Selective Intake StatusCauses

Exhibition hall Square park Parking lot Existing intake tower New intake tower  Tunnel type : circle(D=7.3m, L=62.0m)  Building size : W16m × L22.2m × H89.2m  Gate type : W10m × H14m × 3 ea  Construction period : ~  Construction cost : 47.2 bil. won ($ 44 mil.) 2. The facility of a Selective Intake Bird’s eye view

Thank You K-water is creating a happier world with water