New Timing and Control Equipment At LSU Wildwood, NJ.

Slides:



Advertisements
Similar presentations
ESTeem RF Design Tools SECTION 4 - RF System Design.
Advertisements

AMATEUR RADIO TRAINING
U.S. COAST GUARD NAVIGATION CENTER FY 2003 LORAN PERFORMANCE LCDR MAX CARUSO, NAVCEN OPS.
Feasibility of Increasing Loran Data Capacity using a Modulated Tenth Pulse Benjamin Peterson Peterson Integrated Geopositioning International Loran Association.
Differential Loran Ben Peterson, Ken Dykstra & Peter Swaszek Peterson Integrated Geopositioning & Kevin Carroll, USCG Loran Support Unit Funded by Federal.
Chapter 13 Transmission Lines
1 Broadcaster Relocation Fund Workshop Expanded Presentation June 25, 2012 Presented by: Jay Adrick, Vice President Broadcast Technology.
Transitioning to Time of Transmission Control in the U.S. Loran System ILA 2003 Boulder, CO Mr. Gene Schlechte CAPT Curtis Dubay, P.E. U. S. Coast Guard.
The Game Plan for Loran-C Modernization John J. Macaluso U. S. Coast Guard Mitchell J. Narins U. S. Federal Aviation Administration International Loran.
Controls Setup. Wiring Controls Setup Wire Nest.
Microwave Amplifier Power Supply
Paul Drumm 30 March 2004 MICE at RF Power System: power source, distribution Paul Drumm RAL Ambitious title!
Improve Run Generation Overlap input,output, and internal CPU work. Reduce the number of runs (equivalently, increase average run length). DISK MEMORY.
1 04/03/02 01:30 utc IR. 2 04/03/02 02:00 utc IR.
5 Number Summary, Boxplots, Outliers, and Resistance
Box and Whisker Plots and the 5 number summary Chapter 6 Section 7 Ms. Mayer Algebra 1.
Mitigation of the Effects Early Skywaves Ben Peterson, Peterson Integrated Geopositioning & Per Enge, Stanford University Funded by Federal Aviation Administration,
V-1 TFE: The New Heartbeat of Loran T. P. Celano, Timing Solutions Corporation LT Kevin Carroll, Loran Support Unit.
A Preliminary Study of Loran-C Additional Secondary Factor (ASF) Variations International Loran Association 31st Annual Convention And Technical Symposium.
Silent Classroom Timer
Data Link Control Protocols
1 Electromagnetic Sensing for Space-borne Imaging Lecture 6 Antenna Lore, Transmission and Reception Patterns, Phased Arrays, Sparse Aperture Theorem.
October 29, 2002 International Loran Association Design and Test of the First Article Accufix 7500 Transmitter Presented by Mark Danieli.
October 28, 2002 International Loran Association Modernization of Nii Jima Transmitter Control Presented by Michael Weisenbloom.
Building Your LPFM Station Presented by John George.
Enhanced LORAN Receiver (ELR) Kirk Montgomery – Symmetricom/Advanced Timing Solutions 2007 Convention and Technical Symposium - ILA-36 Orlando, Florida.
1 Timing with loran Judah Levine Time and Frequency Division NIST/Boulder (303)
A Hardware Perspective DUAL POLARIZATION UPGRADE.
Continued… Obj: draw Box-and-whisker plots representing a set of data Do now: use your calculator to find the mean for 85, 18, 87, 100, 27, 34, 93, 52,
Maintenance and Accelerator Support RHIC StartUp10.
Status – U.S. Maritime Backup Issues Session 2, 28 October 2002 –Status & Plans of LORAN-C Service Providers 31st Annual Convention & Technical Symposium.
Simulation and Analysis of Entrance to Dahlgren Naval Base Jennifer Burke MSIM 752 Final Project December 7, 2007.
Loran Integrity Performance Panel The Loran Integrity Performance Panel (LORIPP) The LORIPP Team Loran Team Meeting McLean, VA July 30, 2002.
World History I Teacher: Mr. Robert Michel. Hello! I’m Mr. Michel. Born and raised in Charlottesville, VA Bachelor’s of Science in Psychology Christopher.
“Status of the Loran Recapitilization Project” FAA Team Meeting – July 2002 CDR G. K. Weeks Jr., U. S. Coast Guard, Commanding Officer USCG Loran Support.
NSTX Upgrade Test Cell Initial Schedule Vent vacuum vessel by 9/19 No vessel entry at this time Period of removals prior to start of outage: 9/19 – 10/14.
Transmitter Performance Section Participants –LSU –NAVCEN –NAVCEN (West) –Peterson Integrated Geo-positioning, Inc –BAH LORIPP Meeting #2 Portland, OR.
LORAN Modernization Loran Data Channel Mr. Raymond Agostini International Loran Association Orlando, FL October 15, 2007.
Modernizing Loran Command and Control U.S. Coast Guard Loran Support Unit Pacific Ave. Wildwood, NJ Raymond Agostini James R. Betz International.
Objective 39 Honors Geometry WP: Pythagorean Theorem.
5 Number Summary, Boxplots, Outliers, and Resistance.
Radio Assignment NM3420 AUDIENCE CONTEXT ANALYSIS.
Data Collection Effort Objectives Time of Transmission (TOT) monitors Time of Arrival (TOA) monitors Pulse Analysis Measurements re UTC, & sign of delay.
RF over Fiber - Application Riedel solutions for broadcast applications 1 Application Examples – RF over Fiber.
AMATEUR RADIO TRAINING Transmitters & Receivers Release: v1.21 hamtrain.co.uk.
AMATEUR RADIO TRAINING
AMATEUR RADIO TRAINING
Pin-fed back to back pyramidal horn antenna
Sector 0 RF System Installation of components (Master Amplifier and PEP Phase Shifter) in October down time. Testing and commissioning during October.
Elecbits.
15 seconds left 30 seconds left 3 minutes left 2 minutes left 1 minute
Box and Whisker Plots.
CONTROL OF BUILDING SITES
Constructing Box Plots

Around the room Orders of operations.
Box and Whisker Plots and the 5 number summary
Box and Whisker Plots and the 5 number summary
Box and Whisker Plots and the 5 number summary
Basic Ham Radio Licensing Course POWER SUPPLIES
Box and Whisker Plots and the 5 number summary
CONTROL OF BUILDING SITES
ESTARTIT NOV 2009 I served aboard Loran Station Estartit twice. Once the first time was in Oct 1977 – Apr This was my best tour of duty. The town.
Sec 4.3: HOW DERIVATIVES AFFECT THE SHAPE OF A GRAPH
“Teaching Chess, and Life”
Creating the jwork folder
Median from a list of data:
Number Summaries and Box Plots.
Technician Licensing Class
Presentation transcript:

New Timing and Control Equipment At LSU Wildwood, NJ

New Transmitter At LSU Wildwood, NJ

Building Construction Begins At LORSTA George, WA

New Transmitting Complex At LORSTA George, WA (bottom – left)

New Transmitting Complex At LORSTA George, WA

New Transmitter Room At LORSTA George, WA

New Operations Room At LORSTA George, WA

Ready To Install New Equipment At LORSTA George, WA

New Equipment At LORSTA George, WA

New Timing and Control Equipment At LSU Wildwood, NJ

New Transmitter At LORSTA George, WA

New Transmitter At LSU Wildwood, NJ

ET1 McKinney Changing Antenna Feed At George, WA

Mr. Paulus Has The Honor At LORSTA George, WA

Old Equipment Secured At LORSTA George, WA

Old Tube Transmitter Silent At LORSTA George, WA

OCTOBER 15OCTOBER 23 MEAN MEDIAN MAX MIN

OCTOBER 15OCTOBER 23 MEAN MEDIAN MAX MIN OCTOBER 15OCTOBER 23 MEAN MEDIAN MAX MIN

Commissioning Crew At LORSTA George, WA

Primary TOT (Secondary) RF Gate Secondary PCI SZC Secondary Transmits SZC Locus TINO Alternate TOT (Secondary) UTC (Secondary) XMTR Delay Master PCI Master UTC PCI RF Gate Master received at Secondary RF Gate Loran (Master) RF Gate Secondary received at Master UTC Baseline Length (in Usec) UTC Master Transmitter Delay Alternate TOT (Master) Locus TINO (Master) SZC Baseline Length (in uSEC) (Secondary) Loran (Secondary) Primary TOT (Master 30 uSEC) Master Transmits SZC Timing Ladder Diagram