E.Huttel, Vacuum Workshop, ALBA, 12-13 Sept.05 Forschungszentrum Karlsruhe / ANKA The ANKA Vacuum System S.HermleA.Völker E.HuttelT.Fischböck.

Slides:



Advertisements
Similar presentations
8 th January, 2007 European Linear Collider Workshop, DL, UK ILC DR Vacuum System Progress in ECLOUD Task (Goal 7) for the ILC DR Dr. Oleg B. Malyshev.
Advertisements

Vacuum & Cooling Systems Updates F. Makahleh On behave of Vacuum & Cooling Group TAC 2013, F. Makahleh, Vacuum & Cooling 1.
1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
E-CLOUD VACUUM OBSERVATIONS AND FORECAST IN THE LHC Vacuum Surfaces Coatings Group 03/07/2011 G. Bregliozzi On behalf of VSC Group with the contributions.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
John Amann – ILC Mechanical Engineering 11/13/06
26-28 August 2008 Final EUROTeV Scientific Workshop, Uppsala University, Sweden 1 ILC DR vacuum system related problems and solutions Oleg B. Malyshev.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
1 Tetsuhiko Yorita JASRI/SPring-8 Acc. Div. SPring-8 Vacuum System Contents - Outline of Vacuum system - Pressure behavior - Some topics.
Erhard Huttel ISS/ANKA 1 CLIC damping wiggler CERN Vacuum Requirements etc. for ANKA General Requirements for UHV Vacuum: Pressure without.
13/09/2005Vacuum Systems for Synchrotron Light Sources Workshop, Barcelona, Spain 1 Gas Flow Modelling in Design of the Vacuum System for of the Synchrotron.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Installation and vacuum conditioning, 12 th and 13 th September 2005 L. Schulz.
SR Vacuum Systems and Front Ends
Vacuum studies at LAL Bruno Mercier, Christophe Prevost Alexandre Gonnin, Christian Bourgeois, Dirk Zerwas R.P. ILD MDI Meeting 24/3/15.
NSLS-II ASAC Review, 10/9-11/06 H-C. Hseuh,…, SR Vacuum Systems Storage Ring Vacuum Systems H-C. Hseuh, C. Foerster, J. Hu, G. Mahler, S. Pjerov, S. Sharma,
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
Summary of Working Group II – Chamber Coating and Treatment Participants: Michel ChanelCERN Ping HeBNL Dick Hseuh BNL Roberto KersevanESRF Yulin LiCornell.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
F. Mazzolini Vacuum Systems for Synchrotron Light Sources Barcelona, September 12– Front-end vacuum system F.Mazzolini.
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
ICFA Workshop, December 9-12, 2003 Andreas Krämer - GSI Darmstadt1 Ion Beam Induced Desorption Yield Measurements at GSI The 13th ICFA Beam Dynamics Mini-Workshop.
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Vacuum Technology, 12 th and 13 th September 2005 L. Schulz Introduction Pumps.
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
Center for the Advancement of Natural Discoveries using Light Emission Vacuum system for the AREAL linear accelerator Vacuum Systems A.Gevorgyan.
1 NEG COATING RESULTS AND TRENDS R. Kersevan, Vacuum Group, Tech.Serv.Division, ESRF, Grenoble ALBA-MaxLab Workshop on Vacuum Systems for Synchrotron Radiation.
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional.
41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.
1 of 30 rjrALBA Workshop, Barcelona, th Sept 2005 The Evolution of Vacuum System Design for Accelerators over 30 years at Daresbury Lab Ron Reid.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review Vacuum Systems H.-C. Hseuh January 4, 2007 Vacuum Systems.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
NSLS Vacuum Experience Eugene J. Hu National Synchrotron Light Source Brookhaven National Laboratory Upton, NY USA September 12-13, 2005 (prepared.
Experience Fabricating the Storage Ring Vacuum Chambers for NSLSII
Accelerator Vacuum Systems at DESY M.Seidel, DESY Workshop on Vacuum Systems of Synchrotron Light Sources Barcelona,
1 Vacuum chambers for LHC LSS TS Workshop 2004 Pedro Costa Pinto TS department, MME group Surface Characterization & Coatings Section.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
2007/09/17-21 SLAC IRENG07 1 A Basic Design of IR Vacuum system Y. Suetsugu, KEK Possibility of a pumping system without in-situ baking at z < L*
1 MONTECARLO CALCULATIONS OF PRESSURE PROFILES FOR THE ESRF DIPOLE/CROTCH AREA R. Kersevan – Vacuum Group, Tech.Serv.Division, ESRF, Grenoble ALBA-MaxLab.
THIN FILMS FOR CLIC ELEMENTS Outline Motivation The role of MME-CCS DB and MB transfer lines Main beam Main beam quadrupoles Other issues conclusions CLIC.
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
OLAV05 ESRF VACUUM GROUP ESRF VACUUM GROUP P reventive M aintenance for S torage R ing O peration 11 / 12 April 2005 Michael Hahn reporting for Jean-Louis.
E.Huttel, Vacuum Workshop, ALBA, Sept.05 Forschungszentrum Karlsruhe / ANKA Absorber Design for Synchrotron Radiation Sources S.Hermle, D.Einfeld,
ALBA labs  Magnetic lab  RF lab  Vacuum lab Francis Perez.
F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– The ELETTRA vacuum system F.Mazzolini, L.Rumiz, J.Miertusova, F.Pradal, E.Mazzucco,
E.B. Holzer BLM Meeting: Q & A March 20, Questions and Answers.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
Warm Girder UHV Components John Heckman Anthony DiPette Vacuum Group 2/29/2016.
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
The PSI protium gas filling system (status report by Claude Petitjean to the Gatchina collaboration meeting June 14-17) Main components of the PSI gas.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
1 Vacuum in LER and HER. First estimation for the pumping system requirements (part II) A.Variola for B.Mercier, C.Prevost Annecy - Mars 2010.
1 Workshop on Vacuum System Design for Synchrotron light Source ALBA - Barcelona, Sept New trends in the vacuum design and technology.
2007/09/17 SLAC IRENG07 1 Comment on IR Vacuum system Y. Suetsugu Pumping System without in-situ baking at z < L*
τ- Charm Vacuum System Preliminary
Vacuum System P. Chiggiato TE-VSC
High Gradient Magnet Design for SPring-8 Upgrade Plan
Vacuum Problems in the ILC Damping Ring
ELENA installation and commissioning status
SAES Project: Combination of NEG module and sputter ion pump
General remarks about the HESR and PANDA vacuum system
SPS - EYETS 2016/17 Vacuum systems planning
Leak Detection Tutorial Work
CEPC Vacuum System Dong Haiyi 2017/11/5.
Martin Dommach TDR ART Review, Hamburg, September 14, 2012
Action People Time [h] Shutting down the SR 2 1
XFEL Collimation and Beam Switchyard Vacuum Issues
Специализированный источник синхротронного излучения Anka Характеристики и экспериментальные возможности.
Vacuum in LER and HER. First estimation for the pumping system requirements A.Variola for B.Mercier, C.Prevost, F.Letellier.
Presentation transcript:

E.Huttel, Vacuum Workshop, ALBA, Sept.05 Forschungszentrum Karlsruhe / ANKA The ANKA Vacuum System S.HermleA.Völker E.HuttelT.Fischböck

E.Huttel, Vacuum Workshop, ALBA, Sept.05 Forschungszentrum Karlsruhe / ANKA ANKA Parameter Energy0.5 – 2.5GeV Emittance50nm Circumference110.4m Current0.2 (0.4)A Loss per Turn0.6MeV Energy Accept B bend 0.3 – 1.5T Damping3, 3, 1.5ms In operation: 3 Beam lines for Micro fabrication 9 Analytical Beam lines In planning: 3

E.Huttel, Vacuum Workshop, ALBA, Sept.05 Forschungszentrum Karlsruhe / ANKA One of the Row BESSYANKASLSCLSASP First BeamApril 1998 Jan 2000 Dec. 2000Dec. 2003(2006) MaterialLN316 AbsorberLumped + Distributed Lumped PumpsTriodeDiode (Ti) Diode (Ti+Ta) Diode (Ti) BakingIn-situPre bake‘In–situ’ FlangesCF VAT Seal ManufacturerPINK, FMBFMB Ingmar Lehmann, FMB Lothar Schulz, SLS Erhard Huttel, ANKA

E.Huttel, Vacuum Workshop, ALBA, Sept.05 Forschungszentrum Karlsruhe / ANKA Vacuum Chamber Lay Out

E.Huttel, Vacuum Workshop, ALBA, Sept.05 Forschungszentrum Karlsruhe / ANKA Lay out, Continued Following chamber: e-beam chamber only Distributed Absorber Small pumps (150 l/s) every 1.5 m Large Chamber (Dipole plus following Quad /Sextupole ) e-beam Chamber plus Ante Chamber Each ante chamber: Lumped absorber (Covering 80% of SR) Large (500/300 l/s) pumps

E.Huttel, Vacuum Workshop, ALBA, Sept.05 Forschungszentrum Karlsruhe / ANKA Pumping Standard Diode Ion pumps Varian 16 x 500 l/s 16 x 300 l/s 63 x 150 l/s 30 Controller 300 l/s l/s connected to 1 Contr. Up to l/sconnected to 1 Contr. Each pump current measured

E.Huttel, Vacuum Workshop, ALBA, Sept.05 Forschungszentrum Karlsruhe / ANKA Vacuum Preparations and Assembling Specification:Leak rate < mbar l/s Desorption rate:< mbar l/ (s cm 2 ) Masses>40< 0.01 No Firing Baking and test at factory Baking and assembling on side (Pumps, gauges, absorber) Venting with N 2 Assembling in storage ring Pumping

E.Huttel, Vacuum Workshop, ALBA, Sept.05 Forschungszentrum Karlsruhe / ANKA Production

E.Huttel, Vacuum Workshop, ALBA, Sept.05 Forschungszentrum Karlsruhe / ANKA Expected Vacuum Behavior Distributed Absorber C.Herbeaux et al. Vac60(2001)113 Lumped Absorber V.V.Anashin et al. EPAC(1998) Ah 100 Ah Exposed: m Factor 10 difference for dose per length

E.Huttel, Vacuum Workshop, ALBA, Sept.05 Forschungszentrum Karlsruhe / ANKA What We Get (Logarithmic Scale) ! Prediction PAC98 Linear in Energy and Current SLS Saturation due to Touscheck

E.Huttel, Vacuum Workshop, ALBA, Sept.05 Forschungszentrum Karlsruhe / ANKA What Happened (Linear scale) ! Kr Accident SUL Wiggler Wera Undulator + Broken Window SCU14 50 Ah to recover, when ¼ of storage ring vented N Ah, when vented with air With more Valves now, 10 Ah to recover when venting straight section only

E.Huttel, Vacuum Workshop, ALBA, Sept.05 Forschungszentrum Karlsruhe / ANKA Major Accident I (Kr Lamp 2002) (Standard diodes do not pump noble gases) Pumped Storage Ring with Turbo Pumps While baking all Pumps Recovered!! Not my design!! They did not tell us! Look for the BL design!! Syn.Rad. Kr lamp for baking behind Be – Mirror (Exposed to SR) Broke Conclusion: Standard Diodes or ok

E.Huttel, Vacuum Workshop, ALBA, Sept.05 Forschungszentrum Karlsruhe / ANKA Major Accident II 2003 (Broken FE Window) Exposed SR to air H 2 O !, Not dry N 2 ! Cleaning with Syn.Rad. took 100 Ah to recover! Syn.Rad. Pyrex window in Diagnostic Front End Replaced after 3 Year of Use (became brown) New one broke after 6 month

E.Huttel, Vacuum Workshop, ALBA, Sept.05 Forschungszentrum Karlsruhe / ANKA Instrumentation (Storage Ring) No Pirani, I do not miss them ! 12 Penning Gauges 4 QMS 95 Ion Pump Current Monitors

E.Huttel, Vacuum Workshop, ALBA, Sept.05 Forschungszentrum Karlsruhe / ANKA Manufacturer ProductTypNo.Manuf.Cost € Chamber316 LN110.4 mFMB0.6 Millok Ion Pumps Controller 150 – 500 l/s Midivac 63/16/16 30 Varian0.4 Millok now ok Roughing Turbo 150 l/s6Varian0.05 Millok Gauges - Sector Valves Roughing 100 CF 63 CF 6 16 Cetec0.02 Millok (Schedule-) Gauges, QMS Leak Det. IKR70, PG300, QMS422 8Pfeiffer0.02 Millok

E.Huttel, Vacuum Workshop, ALBA, Sept.05 Forschungszentrum Karlsruhe / ANKA Conclusion EffectGain FiringReduces H 2 ? Pre bakeRemoves H 2 ONeeded ‘In situ’ bake outRemoves H 2 O better20 Ah Material: Desorption Conductivity Cost => better.η (Al) > η (SS) ~ η (Cu).λ (SS) < λ (Al) ~ λ (Cu) Cost (Cu) > Cost (Al) > Cost (SS) Steel best cost performance? unless you go to NEG coating Ti SublimatorAdditional pumping speed? Standard DiodesPumping speed 50 % higherYes NEG coatingRemoves H 2 CO200 Ah Only Lumped absorber Better conductance source to sink % better pressure