DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO https://espace.cern.ch/CO2/default.aspx.

Slides:



Advertisements
Similar presentations
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI.
Advertisements

Control and IT Systems status and strategy ALBA, Piotr Goryl on behalf of Michał Ostoja-Gajewski, Krzysztof Wawrzyniak, Łukasz Żytniak, Tadeusz.
ALICE TPC Ne/CO2 Gas System. Mixing Rack CO 2 -Removal & (O 2,H 2 O)- Cleaning Rack.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Sept. 30, 2004 NIKHEF-1 Hans de Vries Status NIKHEF Mechanics Secondary vacuum box Bellows Vacuum system CO 2 cooling: Bart Verlaat.
IBL CO 2 UNICOS CPC6 based control system Lukasz Zwalinski – PH/DT/PO.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
Vacuum - CONTROL SYSTEM 29 June Agenda MSRC design, first ideas and plans – Antonio quiet cooling fans test – Irene some scada SW review - Martin.
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
European Organization for Nuclear Research LHC Gas Control System Applications G.Thomas, J.Ortola Vidal, J.Rochez EN-ICE Workshop 23 April 2009.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
IBL cooling status Pixel week 15 October 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Claudio Bortolin, Piotr Gach, Artur Szlachcic, Olivier Crespo.
Ethernet IP solution for ATLAS IBL and CMS Pixel detectors CO 2 cooling plants Lukasz Zwalinski PH/DT/DI.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
Michal Zimny Cracow University of Technology Seminar - Internship programmes at CERN PH-DT-DI.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO Łukasz Zwaliński PH-DT-PO 1 J.Godlewski,
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
“The LHC GCS Framework” Geraldine Thomas CERN, IT-CO A complete PLC and PVSS automatic code Generation.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
May 14, 2003The Detector Safety System for LHC Experiments1 Agenda 1) Minutes of last meeting 2) DSS Back End software progress by Giulio Morpurgo 3) DSS.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
60kW Thermosiphon control system
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
JCOP - 17 October 2001NA60_GAZ - E. Mazel J. Rochez1 A Project for the GAS control System At NA60.
Thermo-siphon Control Design Lukasz Zwalinski – PH/DT Alexandre Moraux – PH/DT
Overview of recent CO 2 cooling developments As an example for LHCb-Velo and UT cooling? Kick-off meeting 28 may 14 Bart Verlaat 1.
ACS news RF cabling campaign: DONE Final tests cavity tuning motor (ctrl): in progress recabling software upgrade Water cooling: ADT static pressure test:
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
H.-G. Moser, PXD Workshop, Valencia, January 2016 IBBelle for VXD 1 Use one unit first Assemble on a platform which fits in a 20’ container No redundancy.
C. Kiesling, 11th B2GM PXD Session, KEK, March , Slow Control System for the PXD PXD Support Systems & Control UNICOS Standard PVSS User Interface.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
Internship final report Joanna Staniszewska Cracow University of Technology –
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
IBBelle: Status & Plans
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
Rosario Turrisi INFN Padova
Detector Cooling Project WP2 CO2 activities status report
Gas System Commissioning
Flexible lines production and planning
Christian Veelken last updated 11/09/06
Forum on Tracking Detector Mechanics - Bonn, May 2016
Tracker cooling loop “check out” draft for discussion
MAUVE CO2 cooling review
Pixel CO2 Cooling Status
Presentation transcript:

DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO

DCP 12 May 2010 Jan Godlewski PH-DT-PO 2 Cooling plant for tests  Actual status  Next steps  Missing parts  Tests program

DCP 12 May 2010 Jan Godlewski PH-DT-PO 3 Status  Test stand at cryolab  Pressure test (120 bar) done  Chiller connected and tested  Sensors installed and connected to control rack  DAQ checked and debugged  Possibility of remote log-in to follow test stand function  ALICE Silicon Pixel Detector interested in CO2 activities  Claudio Bortolin and Rosario Turrisi have joined CO2 group

DCP 12 May 2010 Jan Godlewski PH-DT-PO 4 Minutes from the last meeting

DCP 12 May 2010 Jan Godlewski PH-DT-PO 5 P&I

DCP 12 May 2010 Jan Godlewski PH-DT-PO 6 CO2 progress and issues on the control system CO2 PLC PVSS UNICOS project creation status: 1 – Excel specification preparation √ 2 – PLC hardware configuration √ 3 – PLC & PVSS instance generation √ 4 – Process logic program preparation √ 5 – Specific functions preparation √ 6 – Code compilation √ 7 – Loading to PLC √ 8 – PVSS Data Server configuration √ 9 – PVSS panels creation √ 10 – Commissioning & operation – began – all sensors values are archived SCADA server Logic Generator Instance Generator Specification SIEMENS PLC From Łukasz

DCP 12 May 2010 Jan Godlewski PH-DT-PO 7 CO2 progress and issues on the control system Signal-electrical installation: 1 – Control rack completed √ 2 – Plant frame equipped with cable trays √ 2 – Signals cables in place and 90% connected √ 3 – Power cables in place and connected √ 4 – All sensors,actuators and cables labeled √ 5 – All PT100 connected with additional connector to ensure in case of failure fast sensor replacement √ From Łukasz

DCP 12 May 2010 Jan Godlewski PH-DT-PO 8 Missing parts and things to do  Missing parts  Accumulator from NIKHEF  Hans Postema in contact with NIKHEF  We are requesting it for mid of June  Expansion valve for accumulator cooling  Should come these days  Some sensors  Valves extensions for cold running  Still to do  Installing and connecting accumulator  Installing valves extension  Insulation  Final commissioning of control system

DCP 12 May 2010 Jan Godlewski PH-DT-PO 9 Summary  CO2 test stand  Test stand ready for “warm” operation  We are waiting for accumulator from NIKHEF  First thing to test will be ATLAS Pixel stave (first half of June)