DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO
DCP 12 May 2010 Jan Godlewski PH-DT-PO 2 Cooling plant for tests Actual status Next steps Missing parts Tests program
DCP 12 May 2010 Jan Godlewski PH-DT-PO 3 Status Test stand at cryolab Pressure test (120 bar) done Chiller connected and tested Sensors installed and connected to control rack DAQ checked and debugged Possibility of remote log-in to follow test stand function ALICE Silicon Pixel Detector interested in CO2 activities Claudio Bortolin and Rosario Turrisi have joined CO2 group
DCP 12 May 2010 Jan Godlewski PH-DT-PO 4 Minutes from the last meeting
DCP 12 May 2010 Jan Godlewski PH-DT-PO 5 P&I
DCP 12 May 2010 Jan Godlewski PH-DT-PO 6 CO2 progress and issues on the control system CO2 PLC PVSS UNICOS project creation status: 1 – Excel specification preparation √ 2 – PLC hardware configuration √ 3 – PLC & PVSS instance generation √ 4 – Process logic program preparation √ 5 – Specific functions preparation √ 6 – Code compilation √ 7 – Loading to PLC √ 8 – PVSS Data Server configuration √ 9 – PVSS panels creation √ 10 – Commissioning & operation – began – all sensors values are archived SCADA server Logic Generator Instance Generator Specification SIEMENS PLC From Łukasz
DCP 12 May 2010 Jan Godlewski PH-DT-PO 7 CO2 progress and issues on the control system Signal-electrical installation: 1 – Control rack completed √ 2 – Plant frame equipped with cable trays √ 2 – Signals cables in place and 90% connected √ 3 – Power cables in place and connected √ 4 – All sensors,actuators and cables labeled √ 5 – All PT100 connected with additional connector to ensure in case of failure fast sensor replacement √ From Łukasz
DCP 12 May 2010 Jan Godlewski PH-DT-PO 8 Missing parts and things to do Missing parts Accumulator from NIKHEF Hans Postema in contact with NIKHEF We are requesting it for mid of June Expansion valve for accumulator cooling Should come these days Some sensors Valves extensions for cold running Still to do Installing and connecting accumulator Installing valves extension Insulation Final commissioning of control system
DCP 12 May 2010 Jan Godlewski PH-DT-PO 9 Summary CO2 test stand Test stand ready for “warm” operation We are waiting for accumulator from NIKHEF First thing to test will be ATLAS Pixel stave (first half of June)