Hydraulic and Hydrologic Considerations in Planning Course FLOOD RISK MANAGEMENT Chuck Shadie Mississippi Valley Division.

Slides:



Advertisements
Similar presentations
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Advertisements

F1B - 1 BU ILDING STRONG SM Flood Risk Management Module F1: Authorities and Policies.
FDR1 - 1 Flood Risk management History/Mission/Policies.
15 March 2012 WATERSHED Science & Engineering WEST Consultants.
City of Sunset Valley Drainage Master Plan Assessment Final Recommendation Report March 24, 2009.
HATCH, NM, Background Information Village of Hatch Case Study.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
Carson City Freeway Paul M. Frost, P.E. Principal Hydraulic Engineer Nevada Department of Transportation Mark E. Forest, P.E. Executive Vice-President.
CHARACTERISTICS OF RUNOFF
Hydrological Modeling for Upper Chao Phraya Basin Using HEC-HMS UNDP/ADAPT Asia-Pacific First Regional Training Workshop Assessing Costs and Benefits of.
Water Resources Planning and Management
International Workshop to Discuss the Science of Asset Management
COMMUNITY PRESENTATION
Ch  Know what design frequency means  Know how to delineate a drainage area on a topographic map 2.
The Hydrologic (Water) Cycle. Surface Water Oceans Rivers and streams Lakes and ponds Springs – groundwater becomes surface water.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Kansas City Industrial Council Hydrology and Hydraulics
HEC-FDA Flood Damage Reduction Analysis Pete Andrysiak Sources: HEC-FDA Users Manual Version 1.0 Jan 1998 Metropolitan region of Louisville, Kentucky Study.
Formulating and Evaluating Measures for Flood Risk Management Econ Analysis PROSPECT Formulating and Evaluating Measures for Flood Risk Management Econ.
1 Flood Risk Management Session 3 Dr. Heiko Apel Risk Analysis Flood Risk Management.
Private & Confidential MS Frontier Re Modeling Research Pte. Ltd. Catastrophic Risk – A Flood Perspective Kunal Jadhav 12 April 2012.
FNR 402 – Forest Watershed Management
El Vado Dam Hydrologic Evaluation Joseph Wright, P.E. Bureau of Reclamation Technical Services Center Flood Hydrology and Meteorology Group.
Beargrass Creek Case Study Description of the Study Area Hydrology & Hydraulics Economic Analysis Project Planning Assessment of the Risk Based Analysis.
Hydrologic Design and Design Storms Readings: Applied Hydrology Sections /18/2005.
Upper Brushy Creek Water Control & Improvement District
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
BUILDING STRONG ® Do not include this Slide. This template is a guide for preparing power points presentations. The information requested is important.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
Taming the Alabama River Patrick Dobbs & Clay Campbell AMEC Environment & Infrastructure, Inc Alabama Water Resources Conference.
Standards for Ecologically Successful River Restoration Palmer et al., 2005, Standards for Ecologically Successful River Restoration Palmer et al., 2005,
Project Our group collaborated with students at the University of Zacatecas (UAZ) to accomplish the following: 1- Create an accurate hydrologic model which.
Flooding New Orleans, Aug Flooding –Varies with intensity and amount of rainfall –Perhaps the most universally experienced natural hazard Flood.
James River in Richmond, Virginia looking upriver from the Robert E. Lee bridge. Belle Isle is on the right, November What is happening in this.
CE 424 HYDROLOGY 1 Instructor: Dr. Saleh A. AlHassoun.
Streams and Flooding Chapter 6  Water shapes the earth’s surface  Water also plays a role in human affairs  Floods are the most widely experienced catastrophic.
Streams and Flooding Chapter 6 Water shapes the earth’s surface
Engineering Hydrology (ECIV 4323)
Prepared by: Burnham – Floodplain Study October 23, 2009 Presented by: Marty Spongberg, PhD, PE, PG AMEC Geomatrix, Inc.
Baird Claytor Hydroelectric Project Sedimentation Study.
Roseau River Flood Damage Reduction Project Roseau, Minnesota.
Otter Creek Watershed Meeting January 19, 2008 Mike Dreischmeier Agricultural Engineer Natural Resources Conservation Service.
National-scale quantified analysis of future flood risk in the UK Paul Sayers Head of Floods and Water Management HR Wallingford, UK Jim Hall Professor.
FLOODPLAIN MANAGEMENT AND THE U.S. ARMY CORPS OF ENGINEERS Paul Bourget Directorate of Research and Development Headquarters, U.S. Army Corps of Engineers.
Development of a Geographic Framework for an Integrated Flood Modeling System Oscar Robayo Tim Whiteaker August 10, 2004 University of Texas at Austin.
Flood Risk Management Cosgrove Creek Section 205 Planning Basics.
Description of WMS Watershed Modeling System. What Model Does Integrates GIS and hydrologic models Uses digital terrain data to define watershed and sub.
1 Integrating Water Resources Engineering and Geographic Information Systems (GIS) National Weather Service NWSRFS International Workshop October 21-23,
Long Valley Creek: A Rainfall-Runoff Modeling Story Rob Thompson Hydrologist U.S. Army Corps of Engineers Sacramento District
Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY.
Update to the 1992 Dry Creek Watershed Flood Control Plan CESI/RBF RR/KM FEMA CTP HYDROLOGY.
1 Lake Ballinger and McAleer Creek Watershed Strategic Action Plan Forum Briefing #2 January 27, 2009.
Floodplain Management D Nagesh Kumar, IISc Water Resources Planning and Management: M8L5 Water Resources Systems Modeling.
Basic Hydrology & Hydraulics: DES 601 Module 6 Regional Analysis.
Flood Inundation Mapping Program
Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel.
Rio Grande Rectification Reach FLO-2D Model Development Presentation to: New Mexico – Texas Water Commission and Paso del Norte Watershed Council Project.
March Urban Flood Risk Management. March Objectives Understand the Nature of Flooding & Flood Damage Alleviation Understand the Nature of.
BUILDING STRONG ® 1 Risk Management Center Silver Jackets Program Overview Jennifer Dunn USACE, Institute for Water Resources Silver Jackets Program Manager.
FLO-2D Model Development Below Caballo Dam to Ft. Quitman Prepared by: U.S. Army Corps of Engineers Albuquerque District and Mussetter Engineering, Inc.
Preliminary Engineering Analysis and Design Foxcroft Colony and Mosby Woods Condominiums Prepared for: City Council Work Session November 3, 2015.
Development of a High-Resolution Flood Inundation Model of Charles City, Iowa Nathan Young Associate Research Engineer Larry Weber.
US Army Corps of Engineers BUILDING STRONG ® Miles City, Montana Section 205 Gwyn M. Jarrett - Project Manager Omaha District April 27, 2016.
CEE 3430, Engineering Hydrology David Tarboton
Silver Jackets Orientation
Continuing Authorities Program
Hydrologic Simulation Models
Hydrology.
MANAGING YOUR FLOOD RISK All stakeholders contribute to risk reduction
Love Field Modernization Program
Presentation transcript:

Hydraulic and Hydrologic Considerations in Planning Course FLOOD RISK MANAGEMENT Chuck Shadie Mississippi Valley Division

Objectives To review for students: –An overview of the analyses typically used in Flood Risk Management (FRM) studies. –The type of data needs for H&H analyses. –Various types of FRM alternatives (structural and non-structural measures) and the expected impacts of the alternative types. –H&H outputs to the study team.

References EM , Hydrologic Engineering Requirements for Flood Damage Reduction Studies, 31 Jan 95 EM , Flood Runoff Analysis, 31 Aug 94

Flood Risk Management

H&H Steps in a Flood Risk Management Study –Preliminary Investigations –Development of Basin Model –Hydraulic Studies –Calibrate Models to Existing Conditions –Frequency Analysis for Existing Land- Use Conditions –Future Without-Project Conditions –Alternative Evaluations –Hydraulic Design –H&H Outputs and Reporting

Preliminary Investigations Initial Preparation Obtain Study Area Maps (define watershed boundaries) Determine mapping, cross-section data, and high water mark requirements Field Reconnaissance Prepare Survey Request for mapping requirements and/or cross-sections and high water marks

Initial Preparation Scope Study Objectives and Purpose Study Team determine: H&H and Study Team requirements Study Constraints ($, Rights-of-way, etc) Review Available Documents Previous USACE work (incl Recon studies) USGS or other Federal Agency Reports Local Studies and Other related materials Collect Existing Data: Historic & Design Discharges Discharge-Frequency Relationships High Water Marks Cross-Section, Bridge, and Culvert Data Scope Major H&H Engineering Activities

Surveying Requirements Obtain study area maps. Determine required survey data needs Field Reconnaissance –Interview sponsor, residents, local agencies – Finalize cross-section/mapping needs –Estimate initial roughness values for channels and overbanks –Photograph channels and floodplain, bridges, culverts, weirs, etc. Prepare Survey Request for mapping requirements, cross-section data, and high water mark data

Development of Basin H&H Models Calibration of runoff parameters Delineation of subareas Subarea rainfall-runoff analysis of historic events Channel routing characteristics Reservoir routing (if present) Generate hydrographs

Hydraulic Studies Prepare water surface data Proportion discharges Check Elevations Obtain Rating curves

Calibration of Models to Historic Events Check Hydrologic Model Calibrate models to high water marks Adopt H&H model parameters for hypothetical frequency analysis

Frequency Analysis for Existing Land-Use Conditions Develop Frequency Curves for each stream gage Develop Frequency Storms Develop Frequency hydrographs using calibrated model Calibrate model of each frequency event to known frequency curves Develop analytical frequency curves for ungaged watersheds, if necessary Determine frequency water surface elevations and profiles from rating curves

Future Without-Project Conditions From future land-use planning data, identify extent of future urbanization Select future years in which to determine project hydrology Adjust model hydrology parameters for all affected subareas Model future conditions & determine revised discharge-frequency relationships in watershed

Alternative Evaluations Modify existing & future without-project models to simulate individual alternatives or components Model alternative features Evaluate effects of components on sediment regime Consider non-structural components Perform alternative evaluation and selection

Hydraulic Design Perform hydraulic design commensurate with the level of detail of the study –Reservoirs –Levees –Channel Improvements –Diversions –Pumping –Nonstructural Measures

H&H Outputs Evaluating alternatives – supporting benefit and cost development. Benefits: Providing input to the economic models to determine existing damages, Future without Project damages, and damages prevented (Stage/Flow Frequency data). Cost Analysis: Hydraulic design of alternatives features for design/cost analysis

H&H Outputs Supporting Benefit Analysis: –Stage-Discharge Frequency data for Existing, Future Without-Project, and Alternative(s) Conditions Supporting Cost Analysis: –Hydraulic design of alternatives features for design/cost analysis –Alignment or Right-of-Way requirements Environmental Impacts and Features

Don’t Forget Risk & Uncertainty Analysis

19 Risk & Uncertainty Analysis Outputs for Flood Risk Management Studies From ER , FRM studies will provide: –Estimate of NED (Net Economic Development) Benefits & Benefit/Cost Ratio for each alternative Include probability that Net Benefits are positive Probability that B/C Ratio is at or above 1.0 –Expected Flood Risk Management Performance to include: Annual Exceedance Probability with associated estimates of uncertainty Equivalent long-term risk of exceedance over 10-, 30-, and 50-years Ability to contain specific historic floods –Residual Risk - Expected annual probability of each alternative being exceeded.

Developing FRM Alternatives

Team Effort –Planning, Engineering, Environmental, Economics, Stakeholders, Project Mgmt, etc. Define problem locations –Causes of Flooding –Economic Damage Locations –Environmental Areas of Concern Level of Detail –Reconnaissance, Feasibility, CAP, etc.

Developing FRM Alternatives Alternative Types –Structural Measures – Physical modifications designed to reduce the frequency of damaging levels of flood inundation (Get water away from people). –Non-Structural Measures – Reduces flood damages without significantly altering the nature or extent of flooding (Get people away from water).

Structural Alternatives Reservoirs Channels Improvements (including natural stream design) Levees and Floodwalls Diversions Pumps

Non-Structural Measures Flood Proofing House Raising Relocation Flood Warning & Evacuation Floodplain Regulation

Dams and Reservoirs

Detention Ponds

Reservoir Hydrograph Impacts

Reservoir Impacts to Discharge-Frequency Curve

Reservoirs & Dams Performance Considerations –Capacity, Configuration, and Location –Operation Rules –Other Considerations Dry vs Wet Reservoirs Dam Safety Evaluation –Minimize Hazard when Capacity is Exceeded –Failure Evaluation Environmental Impacts

Diversions

Channel Modifications

Types –Clearing & Snagging –Enlargement –Channel Lining (Concrete, Rock, etc.) –Realignment

Levees and Floodwall

Monroe, LA Folding Floodwall

Interior Drainage

PUMPS

Non-Structural Measures Flood Proofing House Raising Relocation Flood Warning & Evacuation Floodplain Regulation

Flood-proofing - Depth of water in structure up to 2.5 feet - Uses waterproofing and brick veneer in combination with waterproof closures over doors - Cost: $15/sf of structure to be floodproofed

Structure Raising - Depth of water in structure from 2.5 feet to 5 feet - Physically raise houses by use of jacks - Cost: $50-$100/sf of house (depending on 1 or 2 story and pier or slab construction) (2008 price levels)

Relocation Moving property so it is less susceptible to damage from flooding. May be accomplished by: Relocating Contents within an existing structure at its current location Removing the contents or the structure and contents from a flood hazard area

Flood Warning- Preparedness May be implemented as: A stand alone measure when other measures are not feasible, An interim measure until others are in- place, A component of other measures

Floodplain Regulation Future-condition damage may be reduced through land-use and construction regulation or by acquisition. Although neither is used commonly in Corps flood damage reduction plans, both are potentially components of a complete plan in which costs are shared with local partners.

Floodplain Regulation

Regional Differences for Flood Damage Reduction Measures Ice & Snow Arid/Wet Climates Soil Infiltrations Social Likes/Dislikes

Summary Objectives: To review for students: –An overview of the analyses typically used in Flood Risk Management studies. –The type of data needs for H&H analyses. –Various types of FRM alternatives (structural and non-structural measures) and the expected impacts of the alternative types. –H&H outputs to the study team Questions/Discussion