NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at 757-824-7450 or 7451 is with copies to

Slides:



Advertisements
Similar presentations
EUMETSAT Data Collection System
Advertisements

IT Asset Management Status Update 02/15/ Agenda What is Asset Management and What It Is Not Scope of Asset Management Status of Key Efforts Associated.
Spacecraft Constellation GOES-12 scheduled for de-commissioning in Dec 2013 –GOES-12 still supporting South American mission –GOES-12 DCS is turned on.
December 9, Objectives Command Post Support for downlink, internet and video conferencing Distribution of local camera feed throughout the network.
GOES Direct Services. Topics  Direct Broadcast Services  GOES Data Collection Services  Search and Rescue.
NOAA COMMAND AND DATA ACQUISITION STATION
GOES-R Ground Segment Project Update American Meteorological Society Annual Meeting Atlanta, Georgia January 20, 2010 Vanessa Griffin Project Manager,
Himawari-8 Project Plans and Status. Background 2 NESDIS is implementing a capability to ingest Advanced Himawari Imager data from JMA, process and generate.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
Technology Steering Group January 31, 2007 Academic Affairs Technology Steering Group February 13, 2008.
Enterprise Service Desk (ESD)
Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility.
DCS Alternate Data Distribution System (DADDS) Database Development Status Presentation to the STIWG/TWG July 9, 2008.
Hands-On Microsoft Windows Server 2008 Chapter 8 Managing Windows Server 2008 Network Services.
1 GOES DCS Status and Information Dan Schwitalla – th Meeting of the STIWG– 18 – 20 May 2009.
1 EDDN Status and Information Dan Schwitalla – 2009 USGS STIWG/TWG – 6-8 May 2014.
GOES-8 to GOES-12 Transition Direct Readout Conference Cindy Hampton NESDIS/Office of Satellite Operations.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers  DCS Help Desk at or 7451 – 24 Hours/ 7 Days a Week  Al McMath at (757)
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
1 GOES-R Update Greg Mandt System Program Director GOES User Conference 3 Nov 2009.
NOAA Satellite and Information Service GOES Constellation Status Chris Wheeler GOES Team Lead Office of Satellite Operations National Environmental Satellite,
Robin Pfister (GOES-R Ground Segment Deputy Project Manager)
Coordination Group for Meteorological Satellites - CGMS NOAA Response to Action Presented to CGMS-41 plenary session.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or 7451 Contact Phil Whaley at (757) or Al McMath at.
LRGS Enhancements for LRIT NOAA TWG Meeting May 12, 2011 Sutron Corporation Davis Drive, Sterling VA Tel: (703)
Review of NWS IT Consolidation Efforts For HIC Meeting July 2006 Tom Schwein Team Leader of Desktop Management Tiger Team SOD CRH.
1 DCPR Power Ranges Proposed for CS v.2.0 DCS Manufacturers Meeting June 13, 2007 Peter Woolner Noblis
NESDIS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 2, 2012.
SMS 2003 Deployment and Managing Windows Security Rafal Otto Internet Services Group Department of Information Technology CERN 26 May 2016.
Upcoming Frequency Topics: Future GOES-R Concerns
1 National Satellite and Information Service Geostationary Operational Environmental Satellites (GOES) Mary E. Kicza Deputy Assistant Administrator for.
Gene Legg Office of Satellite Data Processing and Distribution Asia Pacific Satellite Data Exchange and Utilization Meeting Honolulu, HI, September 20-22,
3 rd Party Registration & Account Management SMT Update To AMWG Status February 24, 2014.
Kay Metcalf NOAA GOES DCS Program Manager Office of Satellite Data Processing and Distribution NOAA’s Satellite and Information Service GOES DCS: NOAA.
LRIT Testing at NOAA/CO-OPS STIWG Oct CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES CO-OPS operates a DOMSAT system at its two regional.
Support for GOES Data Collection System Presentation to the Advisory Committee on Water Information by Charles Kazimir, Chairperson of the Satellite Telemetry.
Civil Air Patrol Command Council Meeting 1-2 March 2013 Arlington, VA.
A Proposal to Update LRIT to Provide Reliable Rebroadcast Tool for GOES DCS Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 12,
DEC.10,20061 Santos Rodriguez, NWS EMWIN CURRENT EMWIN OVERVIEW.
2 DCS MANAGEMENT ACTIVITIES UPDATES ON ALL OUR ONGOING PROJECTS OTHER INFORMATION HELPFUL TO USERS ALL ITEMS MAY BE CONSIDERED WORKS IN PROGRESS QUESTIONS.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers  DCS Help Desk at or 7451  Contact Phil Whaley at (757) or Al McMath.
EUM/SIR/VWG/12/0375, v1, 10 July 2012 Coordination Group for Meteorological Satellites - CGMS EUM/SIR/VWG/12/0375, v1, 10 July 2012 Coordination Group.
NOAA Satellite and Information Service: Dissemination Systems Update George Jungbluth Senior International Relations Specialist NOAA Satellite and Information.
LRIT Project Status Update STIWG/TWG, Boise, ID Mark Bushnell NOAA/NOS/CO-OPS May 02, 2012 Definitions LRIT – Low Rate Information Transmission LRGS –
GOES Program October 1, 2002 Steven P. Kirkner GOES Program Manager, NOAA/NESDIS.
NOAA Satellite Direct Readout Conference Welcome! – to the 2011 NOAA Direct Readout Conference! Kathleen Kelly Director, Office of Satellite Products and.
G Z LIGO's Physics at the Information Frontier Grant and OSG: Update Warren Anderson for Patrick Brady (PIF PI) OSG Executive Board Meeting Caltech.
Geostationary Operational Environmental Satellite (GOES) User’s Conference Current Status of the NOAA GOES Direct Services Paul Seymour – Broadcast Services.
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) MAY 19, 2009.
GOES Data Collection System Status of Version II Transmitter Implementation Information Brief for TWG Kay Metcalf NOAA GOES DCS Program Manager May 12,
1 Emergency Managers Weather Information Network in the GOES-N Era: a Status Report WMO ISS September 2002.
Top Recommendations GOES POES Services Frequencies.
DADDS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 6, 2014.
ESPC CIP Update November 7, COPC Action Item  NESDIS is currently in the process of reviewing and planning upgrades for the critical infrastructure.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or 7451 Contact Phil Whaley at (757) or Al McMath at.
NESDIS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager November 17, 2010.
GOES Program Review Satellite Direct Readout Conference for the Americas Miami, Florida December 9, 2002 Gerald Dittberner Advanced Systems Planning.
PDS4 Project Report PDS MC F2F UCLA Dan Crichton November 28,
DADDS New Features Tuesday, May 3, 2016Sioux Falls, SD Letecia Reeves, GOES DCS Customer Service Specialist NOAA/NESDIS/OSPO/SPSD.
Office of Administration Enterprise Server Farm November 2004 Briefing.
CERN - IT Department CH-1211 Genève 23 Switzerland t Service Level & Responsibilities Dirk Düllmann LCG 3D Database Workshop September,
GOES-R Product Distribution Logistics Before and After Handover Kathryn Miretzky GOES-R User Services Coordinator Product Readiness and Operations (PRO)
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) DECEMBER 5, 2008.
Satellite Information Flow
NOAA Satellite and Information Service GOES Constellation Status
VAS Update Julie Marsland
DCS Alternate Data Distribution System (DADDS)
Iowa College Aid Processing System (ICAPS)
GOES DCS Customer Interaction/Access Training
PeopleSoft TAM Transition
Presentation transcript:

NOAA COMMAND AND DATA ACQUISITION STATION

WCDAS Numbers DCS Help Desk at or is with copies to Contact Phil Whaley at (757) or Al McMath at (757) DOMSAT frequency is 11,817.5Mhz. No longer supporting telnet

WCDAS Numbers Wallops Pilot (channel 100) Wallops Backup Pilot MHZ (channel 0)

Wallops LRGS Configuration The demodulators for both East and West continue to feed the LRGS directly through the DAMS-NT. The cdadata server is consider the primary LRGS The cdabackup server is considered the secondary LRGS which mirrors EDDN The drot should be considered a troubleshooting tool to verify the DOMSAT downlink. LRGS version 7.0 has become the standard and all Wallops LRGS have been updated (drot and cdabackup updated in the last month). Accounts are built through NOAA and shared with USGS Sites and IPs: – ( ) – ( ) – ( )

Wallops LRGS Configuration Recent (Oct 09) updates to the LRGS/LRIT applications provided: Wallops with the ability to simultaneously stream the DCS data to the NSOF primary, backup, and the OSDPD Backup Facility (OBF) LRIT servers Provided Wallops with enhanced troubleshooting tools to monitor the LRIT delivery of the three streams

LRIT Status The OSDPD has acceptance tested new Domain servers that should resolve Domain data transfer problems to Wallops. The new systems are currently being integrated The DCS component of LRIT is transferred from Wallops to Suitland (via Internet) and then back to Wallops (via T-1). Occasionally, during a planned outage Wallops will simu-cast a single stream to both East and West (this keeps DCS up). LRIT is an advantage to international users because DOMSAT is limited to CONUS. 1 meter antenna receives full LRIT stream There are no re-occurring costs associated with LRIT reception.

Spacecraft Status GOES-10 is scheduled for decommission on Dec 1, 2009 (1230Z – 7:30am) Still awaiting NOAA administrator for signoff on GOES-10 decommission (approved by NESDIS). GOES-12 currently primary (75W) for East GOES-12 will support South American mission in May ‘10. Fuel available for 3 years coverage. This allows for East-West not North-South mnvrs.

Spacecraft Status GOES-13 remains in storage – but not for long GOES-13 will replace GOES-12 as the primary East spacecraft in April 2010 GOES-13 becomes East S/C at 81W and continues drift to 75W. No reposition of DCP antennae required.

Spacecraft Status GOES-11 is the primary West (135W) spacecraft and it will remain so. GOES-14 is positioned (105W) and will remain active to support the XRS instrument Batteries on GOES-11 look OK. We did not have to use GOES-13 for DCS/LRIT/EMWIN during Fall eclipse. GOES-P (GOES-15) launch is scheduled for March 10, 2010 Post Launch Testing at Wallops during the Spring of 2010

Spacecraft Constellation GOES-13 will be prime East (Apr 2010) GOES-11 will be prime West GOES-12 will support the South Americans (May 2010) GOES-14 will be in “storage” but still support XRS (X-Ray Sensor) GOES-13 will be first spacecraft to support 750Hz channelization (function of S/C power) GOES-P/15 will be placed in storage due to 5 warranty of instruments. No plans to activate S/C at this point.

Certification Version 2 (channel splitting & tighter receive filtering) of Cert Standards ratified by OSD in Oct 2009 Three certification test sets to support the new standards have been upgraded and are being deployed to vendors upon request It is not expected that 100bps will not be supported for certification after ver 2 standards are adopted (this is policy, only 4 years left on 100bps support). It has been proposed that the Wallops 300 & 1200bps test channels, for East and West, be upgraded to be compliant with the ver 2 certification standard.

Wallops Backup A second pilot remains active (channel 0) at the WBU. The frequency is 401.7MHz. Wallops staff has remote control/status capability of the WBU systems including the pilot from Wallops. LRIT and EMWIN equipment is at WBU & FCDAS still waiting for connectivity to OSDPD – multicast issue.

DAPS IT team is working security –later slide Dial-in lines were terminated in June A few calls but no serious issues in transitioning users. Dial-in users have been transitioned to the LRGS. Telnet discontinued on Oct 5, 2009 All DOMSAT and Weather Service dissemination is through DADDS Wallops Operations verifies and reports the DCS pilot levels daily.

DOMSAT Sep 1, 2009 to Aug 31, 2010 began Option Period-8 The current contract with Americom Government Services (AGS) expires September Wallops in discussion with DOMSAT provider to identify modem options for consideration in follow- on DOMSAT contract discussions (x25 and 56k bandwidth may not be practical after FY12)

DCS - Security Certification and Accreditation efforts began on Oct 1. Boundaries include Wallops and NSOF C&A package due Mar 2010 (wanted 60 days in adv) Most of DADDS security H/W in place HTTPS on Wallops systems is now in place

DADDS The transition to the DCS Alternate Data Distribution System (DADDS) began on Oct 5, 2009 DAPS –B continues to ingest data but the database is drifting. OSD has been provided requirements to transition to DADDS full time The system is being used to support NWSTG and DOMSAT feeds full time GOES Incident Reports are being written Test Transmitter delivery expected in Nov. Addition software by the end of the year.