Doc.: IEEE 15-08-0456-00-0000 15-July-2008 Author: FitzPatrick/NIST Submission : NIST Roles under 2007 EISA 1 Project: IEEE P802.15 Working Group for Wireless.

Slides:



Advertisements
Similar presentations
NIST Interoperability Framework for the Smart Grid
Advertisements

Doc.: IEEE g TG4g - SUN November 2009 Phil Beecher, Beecher Communications Consultants Ltd Slide 1 Project: IEEE P Working Group.
The NIST Smart Grid Interoperability Framework and the Role of CIM Jerry FitzPatrick National Institute of Standards and Technology CIM Users Group Meeting.
Doc.: wng0 Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Smart Grid.
TG4g - SUN May 2009 Brian K. Seal, Electric Power Research Institute doc.: IEEE g Project: IEEE P Working Group for Wireless Personal.
Smart Grid Interoperability Standards George W. Arnold, Eng.Sc.D. National Coordinator for Smart Grid Interoperability National Institute of Standards.
Common Information Model and EPRI Smart Grid Research
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
1 Re-energizing America: Establishing Standards for a Nationwide Smart Grid Dean Prochaska National Coordinator for Smart Grid Conformance National Institute.
Doc.: IEEE g Submission: Possible PAR changes for g 13 May 2009 Kendall Smith, Mark Thompson, Aclara RF Project: IEEE P
Interoperability Standards and Next Generation Interconnectivity Pankaj Batra Chief (Engineering) CERC.
Doc.: IEEE /044r0 Submission March, 2000 Cypher/NISTSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
Doc.: IEEE /241r0 Submission May 2004 Reed Fisher Oki Electric IndustrySlide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE f Submission September 2009 Mike McInnis, The Boeing Company Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /430r0 Submission José A. Gutierrez November 02 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
IEEE u Submission Amarjeet Kumar, Procubed Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
IEEE g Sub missi on July 2010 Klaus Bender, PE, Utilities Telecom Council Sli de 1 Project: IEEE P Working Group for Wireless.
Doc.: IEEE /241r4 Submission November 2004 Reed Fisher Oki Electric IndustrySlide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE g TG4g - SUN September 2009 Phil Beecher, Beecher Communications Consultants Ltd Slide 1 Project: IEEE P Working Group.
Doc.: IEEE g TG4g - SUN November 2009 Phil Beecher, Beecher Communications Consultants Ltd Slide 1 Project: IEEE P Working Group.
May 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [PHY proposal for existing Sub 1-GHz bands in.
Submission Title: WNAN Tutorial Introduction
Submission Title: [ Wireless Neighborhood Area Networks – WNAN ]
Submission Title: [Add name of submission]
Smart Grid Interoperability Standards
July 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG3c Project Timeline] Date Submitted: [13.
June 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposed Scenarios for Usage Model Document.
<month year> IEEE P xxxx g July 2009
Project: IEEE P Coexistence TAG
doc.: IEEE <doc#>
16 November 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Call For Applications Response Date.
November 18 doc.: IEEE led July 2013
DOE Smart Grid Activities
doc.: IEEE <doc#>
November 18 Nov 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: SG4e Closing Report for Atlanta.
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Smart Grid Overview] Date Submitted: [13.
Submission Title: [WG-Treasurer’s Report Sept04]
<month year> doc.: IEEE /271r0 September, 2000
March 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Toumaz response to TG6 Call for Applications]
<May,2009> doc.: IEEE <doc .....> <July 2009>
July 2013 Robert Moskowitz, Verizon
March 2005 doc.: IEEE a March 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Submission Title: [R2SG Monday Meeting] Date Submitted: [18Sept00]
doc.: IEEE <doc#>
February 19 May 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: LECIM-IG Closing Report for Beijing.
平成31年2月 doc.: IEEE /424r1 November 2008
Submission Title: Monterey e/ Liaison Report.
January 2003 doc.: IEEE /056r0 May 2004
<month year> doc.: IEEE <030158r0> September 2003
1 December 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4g Timeline Discussion] Date Submitted:
October 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG3c Project Timeline] Date Submitted:
doc.: IEEE /XXXr0 Sep 19, 2007 June 2009
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3-System-Interface Discussion] Date Submitted:
July 2013 Robert Moskowitz, Verizon
April 19 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4g-SUN Closing Report for Montreal, May 2009.
July 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [UTC Presentation to IEEE802] Date Submitted:
<month year> <doc.: IEEE doc> March 2015
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4n Chinese Medical Band Closing.
May 2013 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: May 2013 closing report Date Submitted: May.
November 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: SRU IG Closing Report for Dallas November.
<month year> doc.: IEEE <030158r0> <March 2003>
January 2000 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Study Group Summary and Motion for .15WG.
September 2003 doc.: IEEE /0423 r0 September 2003
September 19 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: 802 Tutorial – 15.4g Overview Date Submitted:
<month year> <doc.: IEEE doc> March 2015
Mar Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: March 2014 closing report Date Submitted: March.
July 2003 doc.: IEEE <03/242> July 2003
Submission Title: TG9ma Agenda for September Meeting
Presentation transcript:

Doc.: IEEE July-2008 Author: FitzPatrick/NIST Submission : NIST Roles under 2007 EISA 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [NIST Roles under 2007 EISA on Smart Grid Networks] Date Submitted: 15 July, 2008 Source: [Gerald J. FitzPatrick] Organization [National Institute of Standards and Technology] Address: [100 Bureau Drive, MS 8172, Gaithersburg, MD ] Tel [ ] Re: IEEE 802 Plenary WNAN Tutorial Abstract: To provide information on the NIST role mandated by the 2007 Energy Independence and Security Act (EISA) in coordinating the development of an interoperability framework for Smart Grids. Purpose:To brief IEEE 802 Membership on the status of WNAN application area and related developments, including need for standards Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P

Doc.: IEEE July-2008 Author: FitzPatrick/NIST Submission : NIST Roles under 2007 EISA 2 Jerry FitzPatrick NIST Electrical & Electronics Engineering Lab NIST Roles Under 2007 EISA for Smart Grid Networks

Doc.: IEEE July-2008 Author: FitzPatrick/NIST Submission : NIST Roles under 2007 EISA 3 The National Institute of Standards and Technology (NIST) is the U.S. National Measurement Laboratory -- Mission: to develop and promote measurement, standards, and technology -- support objectives of federal participation in the development and use of voluntary standards. NIST – Who We Are

Doc.: IEEE July-2008 Author: FitzPatrick/NIST Submission : NIST Roles under 2007 EISA 4 NIST Pre-EISA Smart Grid Activities Synchrophasor Metrology state-of-the-art standards test facility for phasor measurement units (PMUs) state-of-the-art standards test facility for phasor measurement units (PMUs) standard communication protocol for sharing data and commands among different automation and control equipment in a facility foundation in HVAC and Lighting Developing communication protocols between utilities and commercial buildings / Industrial Control System (ICS) Security Project develop standards,guidelines and test methods to secure critical control systems develop standards,guidelines and test methods to secure critical control systems MW Zero- Emission Fuel Cell Power Plant 300 MW Zero- Emission Fuel Cell Power Plant 800 kV DC Power Transmission DoE/NIST High-Megawatt Converters reduce cost of grid interfaces through high voltage, high frequency power electronic converters

Doc.: IEEE July-2008 Author: FitzPatrick/NIST Submission : NIST Roles under 2007 EISA 5 Increased use of digital information and controls technology Dynamic optimization of grid operations (with full cybersecurity) Deployment and integration of distributed resources and generation, including renewables Development of “smart” technologies including appliances, and devices Development of standards for communication and interoperability of appliances and equipment connected to the grid Smart Grid Characteristics from EISA

Doc.: IEEE July-2008 Author: FitzPatrick/NIST Submission : NIST Roles under 2007 EISA 6 Energy Independence and Security Act (EISA) of 2007 Title XIII, Section Smart Grid Interoperability Framework The Framework: Protocols and standards that shall further align policy, business, & technology solutions Enable connection of all electric resources, including demand-side resources, into an efficient, reliable grid Seek input from: –FERC, DoE OE & Smart Grid Task Force, Smart Grid Advisory Committee, and other relevant Federal agencies –GWAC, IEEE, NEMA NIST Roles in Smart Grid NIST “… shall have primary responsibility to coordinate development of a framework that includes protocols and model standards for information management to achieve interoperability of smart grid devices and systems …”

Doc.: IEEE July-2008 Author: FitzPatrick/NIST Submission : NIST Roles under 2007 EISA 7 Scope of framework: –Flexible, uniform, technology-neutral –Needs to accommodate traditional generation and transmission distributed generation, renewables, energy storage, energy efficiency enabling devices and systems flexibility to accommodate –regional and organizational differences –new technologies –Should include voluntary standards for electric appliances and equipment for homes and businesses that Enable emergency response or demand response for –load reduction –adjustment to load to provide ancillary services –response to crisis or load shedding to preserve grid reliability NIST Roles in Smart Grid (cont’d)

Doc.: IEEE July-2008 Author: FitzPatrick/NIST Submission : NIST Roles under 2007 EISA 8 Smart Grid Highly efficient technologies Fuel Cell Plant Biofuels Plant Photovoltaic Farm Smart Meter PHEV Net Zero Energy Building Solid State Lighting DG Photovoltaic HTS Cable

Doc.: IEEE July-2008 Author: FitzPatrick/NIST Submission : NIST Roles under 2007 EISA 9 Standards Committees Activities ANSI/NEMA Electricity Metering Committee C12 NASPI/EIPP PMU System Testing and Calibration Guide Task Team IEEE Electricity Metering Subcommittee IEEE PES Power Systems Instrumentation and Measurement Committee ASHRAE BACnet Utility Integration Working Group IEEE , Media Independent Handover group IEEE , WPAN, Task Group (TG) 6 on Body Area Networks (BANs) Interagency Advanced Power Group – Electrical Systems Working Group

Doc.: IEEE July-2008 Author: FitzPatrick/NIST Submission : NIST Roles under 2007 EISA 10 NIST work plan summary 1.(June - Sept 08) Review the current state of Smart Grid related standards and interoperability and present this in an overview Landscape Map tied to a detailed standards knowledge base. This will become a platform for developing consensus on where interoperability gaps exist and priorities for addressing those gaps. 2.(Sept 23-25) Present this information at GridWeek and invite participation in a NIST Interoperability Standards Workshop at GridInterop (Nov 11) that will be focused on evaluating a roadmap for addressing standards gaps and path toward interoperability. 3.NIST is also working to develop domain expert working groups to help with Gridweek and the workshop as well as to guide and sustain action on standards development and harmonization activities.

Doc.: IEEE July-2008 Author: FitzPatrick/NIST Submission : NIST Roles under 2007 EISA 11 December 2007 EISA enactment Ongoing Standards coordination December 08 progress report Sept 23-25, DC GridWeek Meetings with NIST Stakeholders Website up and work plan available Nov. 11 Atlanta GridInterop NIST SG Workshop SG Knowledge Base development Development of Domain Expert Working Groups (DEWGs) DEWGs input on draft standards interoperability roadmap Roadmap presentation and review in domain breakouts Work with stakeholders: Roadmap design GridWeek and workshop planning Landscape Map prep June Present SG Knowledge Base and Landscape Map at GridWeek NIST EISA Work Plan schematic 2008 March December 2008 progress report will include: Introduction with EISA directions and scope Summary of completed work efforts Standards Landscape Map and overview of Smart Grid KB. Smart Grid Standards Roadmap version 1.0 Summary of stakeholder input Future year plans

Doc.: IEEE July-2008 Author: FitzPatrick/NIST Submission : NIST Roles under 2007 EISA 12 DOE Smart Grid Task Force NIST Executive NIST Smart Grid Interoperability Framework Stakeholders Group GWAC, IEEE, NEMA, FERC, EPRI Domain Expert Working Groups B2GI2GH2G Cross-cut Domain Interface T&D Outside contractor support (KB and meetings facilitators) Outside technical and administrative support Wider EISA interaction NIST EISA organization chart NIST Smart Grid Working Group

Doc.: IEEE July-2008 Author: FitzPatrick/NIST Submission : NIST Roles under 2007 EISA 13 Summary 2007 EISA has mandated that NIST lead the coordination of a interoperability framework of object model standards and protocols DEWGs are being established to identify standards needs in Smart Grid domain areas A one-day NIST Interoperability Standards Workshop will be held in November co-joined with the GridInterop conference A report will be published in December on the status of interoperability standards for the Smart Groups