HBD HV Control and Monitoring System INSTALLATION Manuel Proissl HBD Meeting 11/18/2008.

Slides:



Advertisements
Similar presentations
Module 3 Configuring Hardware on a Computer Running Windows XP Professional.
Advertisements

HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
HBD HV Control and Monitoring System HV, P/T and Gain Variations Manuel Proissl HBD Meeting 04/06/2010.
Altai Certification Training Operation & Maintenance
System Construction and Implementation Objectives:
1 Web Servers / Deployment Alastair Dawes Original by Bhupinder Reehal.
Copyright 2002: LIIF Technology Architecture Review Database Application Architecture Database Application Architecture Collaborative Workgroup Architecture.
HBD HV Control and Monitoring System A Gain vs. HV study throughout Run-9 – PART 2 – Manuel Proissl HBD Meeting 06/23/2009.
Managing Your Network Environment © 2004 Cisco Systems, Inc. All rights reserved. Managing Cisco IOS Devices INTRO v2.0—9-1.
Presented by Serge Kpan LTEC Network Systems Administration 1.
Introduction to z/OS Basics © 2006 IBM Corporation Chapter 8: Designing and developing applications for z/OS.
Do MUCH More with Less Presented by: Jon Farley 2W Technologies.
Welcome to Networking! 1. Connect your computer to the network with a cable 2. Copy the Networking folder from the flash drive to the computer or your.
Electronic Customer Portal System. Reducing Risks – Increasing Efficiency – Lowering Costs Secure Internet based Communication Gateway direct to your.
© 2013 IBM Corporation Proactive AIX Analysis for System p / Power.
© 2009 GroundWork Open Source, Inc. PROPRIETARY INFORMATION: Information contained herein is not for use or disclosure outside of GroundWork Open Source,
Network Topologies.
Introduction to the new mainframe © Copyright IBM Corp., All rights reserved. Chapter 7: Designing and developing applications for z/OS.
N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.
WORKFLOW IN MOBILE ENVIRONMENT. WHAT IS WORKFLOW ?  WORKFLOW IS A COLLECTION OF TASKS ORGANIZED TO ACCOMPLISH SOME BUSINESS PROCESS.  EXAMPLE: Patient.
CSCI 1101 Intro to Computers 6. Local Area Networks.
“web to wireless” Technology. A LEADER IN web to wireless ASSET MANAGEMENT ROM Communications Inc.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Hands-On Virtual Computing
Implementation - Deployment Methods of deployment –User PC –Network shared (workstation install) –Terminal server –Web Deployment (ActiveX) (Note: this.
Weekly Report By: Devin Trejo Week of May 30, > June 5, 2015.
Robert Fourer, Jun Ma, Kipp Martin Copyright 2006 An Enterprise Computational System Built on the Optimization Services (OS) Framework and Standards Jun.
Packet Analysis Fluke Protocol Expert & Misc Applications Brian D. Sterck.
Columbia University IN THE CITY OF NEW YORK Environmental Monitoring DOE Review June 2-3, 2009.
Computing Essentials 2014 System Software © 2014 by McGraw-Hill Education. This proprietary material solely for authorized instructor use. Not authorized.
June 6 th – 8 th 2005 Deployment Tool Set Synergy 2005.
1 Monitor System Reliability alarm on demand, sag/surge, and etc. Perform Advanced Power Quality Analysis provide real-time trending. Centralized.
HBD HV Control and Monitoring System A Gain vs. HV study throughout Run-9 – PART 1 – Manuel Proissl HBD Meeting 06/16/2009.
Networks. A network is formed when a group of computers are connected together. Computers in a Local Area Network (LAN) are fairly close together, generally.
1 Alice DAQ Configuration DB
HBD HV Control and Monitoring System PHENIX Manuel Proissl HBD Meeting 12/09/2008.
Module 5: Upgrading to SQL Server 7.0. Overview Planning an Upgrade Preparing to Upgrade Verifying the Upgrade Setting a Compatibility Level.
Computer Networking From LANs to WANs: Hardware, Software, and Security Chapter 13 FTP and Telnet.
Business Data Communications, Fourth Edition Chapter 11: Network Management.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 09/30/2008.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
1 © 2005 Cisco Systems, Inc. All rights reserved. 111 © 2004, Cisco Systems, Inc. All rights reserved. CNIT 221 Security 2 ver.2 Module 8 City College.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
HBD HV Control System Development Manuel Proissl HBD Meeting 09/18/2007.
Linux Operations and Administration
Bina Nusantara 19 C H A P T E R SYSTEM CONSTRUCTION AND IMPLEMENTATION.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
Status of PHENIX Drift Chamber Drift Chambers (DC) are one of the vital components of PHENIX central arms. During the last RHIC Run3 the major activities.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
Accurate Information … Informed Decisions Data from automated and manual sources in a central, secure repository providing easy regulatory and ad hoc reporting,
NETWORKING COMPONENTS lLTEC 4550 JGuadalupe. HUB -THIS IS A HARDWARE DEVICE THAT IS USED TO NETWORK MULTIPLE COMPUTERS TOGETHER. IT IS A CENTRAL CONNECTION.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
HBD HV Control and Monitoring System RESISTORS, CALIBRATION & CO. Manuel Proissl HBD Meeting 12/23/2008.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 03/04/2008.
1 HBD Update Bill and Ted’s Excellent Adventure T.K. Hemmick for the Wyld Stallions.
R. Krempaska, October, 2013 Wir schaffen Wissen – heute für morgen Controls Security at PSI Current Status R. Krempaska, A. Bertrand, C. Higgs, R. Kapeller,
Microsoft ® Official Course Module 6 Managing Software Distribution and Deployment by Using Packages and Programs.
IBM Express Runtime Quick Start Workshop © 2007 IBM Corporation Deploying a Solution.
The BaBar Online Detector Control System Upgrade Matthias Wittgen, SLAC.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
HBD HV Control and Monitoring System RUN-9 UPDATE Manuel Proissl HBD Meeting 04/08/2009.
SMOOTHWALL FIREWALL By Nitheish Kumarr. INTRODUCTION  Smooth wall Express is a Linux based firewall produced by the Smooth wall Open Source Project Team.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
Tech Inside Extended Document Management System (EDMS)
Web Servers / Deployment
SAP R/3 Installation on WIN NT-ORACLE
Systems Construction and Implementation
Systems Construction and Implementation
Presentation transcript:

HBD HV Control and Monitoring System INSTALLATION Manuel Proissl HBD Meeting 11/18/2008

OUTLINE  Development Status Software and Hardware components Server/HV Control Safety  Relay Board Rack in IR The New Shielding Add-on to PHENIX HV Racks  Installation Procedure Transfer from the HBD Simulation Project IR Implementation Counting Room Extension & First Testing  Coming Up Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: November 18 th, 2008 HBD HV Control & Monitoring System Manuel Proissl Page 2 of 8

DEVELOPMENT STATUS  After discussions with Martin, the shell-based control option hvcontrol_HBD has been worked out and extended for all our HV needs: Functions as init, quick_init, standby, operating, disable, set_tripcurrent, etc. are made easily available for users on va022 (hvserver needs to be running!) So far, one would have to change all config data in the perl script manually… Not any more! The new script loads at every start-up the new data from hvdb, one central database every GUI client uses Documentation on how to use it at /hv_stuff/hvcontrol_HBD coming soon!  Major VA Server Update Completed Successfully! Global HV parameters update every 5sec in one-time transmission, triggered by the client!  Software-based Trip-Behavior Function added to HV Control Based on monitoring measured (peak) current changes in 5sec update frame Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: November 18 th, 2008 HV Client HBD Server hvclient hvdb combine package HBD HV Control & Monitoring System Manuel Proissl Page 3 of 8

DEVELOPMENT STATUS  VA racks have been moved and reconnected to network  Due to complaints from RCF about gateway activities due to telnet usage of the HV Control, communication has been changed to SSH. New communication setup still in testing & improving…  Quick Intro to Control Protect TM Server Malfunction  NOT Loosing Control over Detector! Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: November 18 th, 2008 VAs HV Client SA1 Client ) VA022 not responding / available on network… 2.)Initiating switch to other VA server + based on preferred list & process activity 3.)Transfer Authorization Message + Automated Expert in Charge Call 4.)Transfer Approved by Expert via Call 5.)Start hvserver & HBD Server on VAxxx + Downtime overall less than 2min 6.)Return to VA022 when problem resolved HBD Expert via hvdb HBD HV Control & Monitoring System Manuel Proissl Page 4 of 8

RELAY BOARD RACK IN IR  All Relay Board issues have been completely resolved!  In order to protect the VERY sensitive L1471Ns, customized 1U Aluminum boxes were built and placed in our own rack  Setup successfully tested without any trips up to 4kV!  The Relay Board Rack will be installed up to the bridge in IR (2 nd Level) Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: November 18 th, 2008 LeCroy 1458HP Mainframe LC ……… Dividers Plastic isolation between chassis and board Air flow in between boxes Second Level HV Rack in IR HBD HV Control & Monitoring System Manuel Proissl Page 5 of 8

INSTALLATION PROCEDURE  HBD Simulation Project will find it’s end on installation date! Step 1: Removing Tunnel from 1008 to 510  LeCroy Module Tests NOW in the IR Step 2: LV Output tests of all 6 HBD-modified & calibrated Run9 L1471Ns with Fluke + Running HV Control on Laptop in IR + NO HV connection to actual detector!!!  HBD East (1471N #1-3) & HBD West (1471N #4-6) Hook-Up Step 3: Connecting HV modules to Relay Board Rack & Repeat Step 2 Step 4: (Re-)Connecting Relay Boards with Dividers  Hardware Installation Complete Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: November 18 th, 2008 PHENIX Wireless IBM eServer VA 022 HVCV2.0 LeCroy 1458HP Mainframe LC …… Rack IR HBD HV Control & Monitoring System Manuel Proissl Page 6 of 8

INSTALLATION PROCEDURE  Counting Room Implementation Step 5: Installing HVCV2.0 on SA1 Terminal and two backup machines Step 6: Run9 Simulation Tests with first LV detector performance statistics  HBD Expert Distribution Step 7: HV Control for download on HBD website with documentation Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: November 18 th, 2008 PHENIX LAN IBM eServer VA 022 LeCroy 1458HP Mainframe LC …… Rack IR HVCV2.0 Voltage Divider HBD HV Control & Monitoring System Manuel Proissl Page 7 of 8

COMING UP  Finalizing all functions to incorporate in HV Control (incl. FB/RB table look-up)  Intense Crash Testing & Debugging until Deadline!!! In order to guarantee system stability, this is The most important test period of all  Final Run9 database & log report setup with Martin  Distribution / Installation Files for Linux & XP/Vista Platform independence Final installation files with Installation Wizard  Planned Run9 HV System Installation: DEC 1 st, 9AM ++ Preparation Tests in PHENIX continue until the second half shipped (approx. Dec 10 th ) HBD HV Control & Monitoring System Manuel Proissl Page 8 of 8 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: November 18 th, 2008