DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The pixel telescope DAQ Daniel Haas/Emlyn Corrin DPNC Genève EUDET Annual Meeting 2008 NIKHEF, Amsterdam.

Slides:



Advertisements
Similar presentations
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The DevDET/EUVIF Program: a FP7 project CHIPP Workshop on detector R&D Geneva, June 2008 Daniel.
Advertisements

PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
LHCb Upgrade Overview ALICE, ATLAS, CMS & LHCb joint workshop on DAQ Château de Bossey 13 March 2013 Beat Jost / Cern.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
EUDRB: the data reduction board of the EUDET pixel telescope Lorenzo Chiarelli, Angelo Cotta Ramusino, Livio Piemontese, Davide Spazian Università & INFN.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
Performed by: Rami May, Roee Cohen Instructor: Daniel Alkalay המעבדה למערכות ספרתיות מהירות High speed digital systems laboratory הטכניון - מכון טכנולוגי.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
USB host for web camera connection
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
Emlyn Corrin, DPNC, University of Geneva EUDAQ Status of the EUDET JRA1 DAQ software Emlyn Corrin, University of Geneva 1.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Ingrid-Maria Gregor, DESY, JRA1 Milestone JRA1 Pixel Telescope at CERN SPS Present at CERN: Tobias Haas Marcin Jastrzab Uli Koetz Livio Piemontese Philipp.
AIDA annual meeting,Vienna, 26th March 2014Václav Vrba, Institute of Physics, Prague 1  design of sensors for production submission  design of the readout.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
JRA1 – Next Steps towards the Final Telescope Ingrid-Maria Gregor, DESY EUDET Annual Meeting Paris, October 2007.
David Cussans, AIDA/CALICE DAQ Palaiseau, 10 Nov 2011 Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006.
ILC Trigger & DAQ Issues - 1 ILC DAQ issues ILC DAQ issues By P. Le Dû
Who is UMA ? Peter Fischer, I. Peric, F. Giesen, V. Kreidl Lehrstuhl für Schaltungstechnik und Simulation Institut für Technische Informatik Universität.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Data Acquisition for EUDET Example: JRA1 DAQ Daniel Haas DPNC Genève LCWS Hamburg Outline EUDET JRA1.
Bart Hommels Univeristy of Cambridge EUDET Annual Meeting, Ecole Polytechnique, Paris JRA3: DAQ Overview Objectives System Overview Status of.
EUDRB: the data reduction board of the EUDET pixel telescope Lorenzo Chiarelli, Angelo Cotta Ramusino, Livio Piemontese, Davide Spazian Università & INFN.
Michal Szelezniak – LBL-IPHC meeting – May 2007 Prototype HFT readout system Telescope prototype based on three Mimostar2 chips.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Towards the ‘final’ JRA1 DAQ Daniel Haas DPNC Genève EUDET Annual Meeting 2008 NIKHEF, Amsterdam Outline.
LKR Working group Introduction R. Fantechi October 27 th, 2009.
SiTra DAQ integration into EUDAQ Zdeněk Doležal, Daniel Scheirich (Charles U. Prague) With info from Hao Yin and Thomas Bergauer.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 Parallel - DAQ Status, Emlyn Corrin, 8 Oct 2007 EUDET Annual Meeting, Palaiseau, Paris DAQ Status.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 DAQ Status Daniel Haas DPNC Genève Status DAQ board INFN Strasbourg DAQ boards TLU Bristol Software.
IPHC - DRS Gilles CLAUS 04/04/20061/20 EUDET JRA1 Meeting, April 2006 MAPS Test & DAQ Strasbourg OUTLINE Summary of MimoStar 2 Workshop CCMOS DAQ Status.
A simple Desktop DAQ for U2F readout Ulf jörnmark Physics Dept. Lund Status and plans.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
Compton Trigger Design Update Tanja Horn Compton Working Group 6 June 2008.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 - Data Acquisition Status Report Daniel Haas DPNC Genève Extended SC Meeting 1 Sep 2008.
SoLiD/PVDIS DAQ Alexandre Camsonne. DAQ limitations Electronics Data transfer.
Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.
David Cussans, 18 th October 2006 JRA1 Beam Telescope DAQ and Trigger.
JRA-1 Meeting, Jan 25th 2007 A. Cotta Ramusino, INFN Ferrara 1 EUDRB: A VME-64x based DAQ card for MAPS sensors. STATUS REPORT.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
Guirao - Frascati 2002Read-out of high-speed S-LINK data via a buffered PCI card 1 Read-out of High Speed S-LINK Data Via a Buffered PCI Card A. Guirao.
Ingrid-Maria Gregor, DESY, JRA1 Milestone JRA1: Pixel Telescope Test Beam Campaigns Pixel Telescope: Status Demonstrator Testbeam 1 (DESY) Testbeam 2 (DESY)
.1PXL READOUT STAR PXL READOUT requirement and one solution Xiangming Sun.
JRA 1 Status Tobias Haas DESY 19 December EUDET SC Meeting, 19 December Brainstorming, 3/4 DESY 15 people present, 3 via VRVS 15 people present,
Amsterdam, Oct A. Cotta Ramusino, INFN Ferrara 1 EUDRB: status report and plans for interfacing to the IPHC’s M26 Summary: EUDRB developments.
Status of Integration of Busy Box and D-RORC Csaba Soós ALICE week 3 July 2007.
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
JRA1 – Next Steps towards the Final Telescope Ingrid-Maria Gregor, DESY EUDET Annual Meeting Paris, October 2007.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE FACULTÉ DES SCIENCES UNIVERSITÉ DE GENÈVE EUDET JRA1 Meeting Munich October 2006 DAQ Status Emlyn Corrin.
JRA1 – JRA2 Interface Tobias Haas DESY 4 January 2006.
JRA1 Status: PCMAG, Testbeam Infrastructure and Pixel Telescope Tobias Haas DESY/F1 27 August 2007.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 DAQ Emlyn Corrin.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Planning 2009 JRA1 Meeting, Strasbourg March 4 th 2009 Ingrid-Maria Gregor DESY.
X SuperB Workshop - SLAC Oct 06 to Oct 09, 2009 A.Cotta Ramusino, INFN Ferrara 1 SuperB IFR: outline of the IFR prototype electronics A.C.R
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
András László KFKI Research Institute for Particle and Nuclear Physics New Read-out System of the NA61 Experiment at CERN SPS Zimányi Winter School ‑ 25.
DUT integration DAQ buffers & data format
Silicon Lab Bonn Physikalisches Institut Universität Bonn
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Read-out of High Speed S-LINK Data Via a Buffered PCI Card
Planning for the Demonstrator
The CMS Tracking Readout and Front End Driver Testing
Multi Chip Module (MCM) The ALICE Silicon Pixel Detector (SPD)
Presentation transcript:

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The pixel telescope DAQ Daniel Haas/Emlyn Corrin DPNC Genève EUDET Annual Meeting 2008 NIKHEF, Amsterdam Outline JRA1 DAQ Hardware JRA1 DAQ Software Offline Software Achievements User integration The ‘final’ DAQ Roadmap

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Daniel Haas, EUDET Annual Meeting, Oct 2008 Page 2 The JRA1 DAQ scheme (HW)

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Daniel Haas, EUDET Annual Meeting, Oct 2008 Page 3 DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Page 3 JRA1 - Trigger Logic Unit Simple Handshake via Trigger/Busy/Reset on RJ45 LVDS lines (or TTL-Lemo) Timestamp and event-number via USB Eventnumber via advanced data handshake on RJ45 available In collaboration with Bristol

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Daniel Haas, EUDET Annual Meeting, Oct 2008 Page 4 DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Page 4 JRA1 - EUDRB VME based readout card for our telescope (analog) sensors and to apply zero suppression Upgradeable to ‘final’ digital chip Data is bundled on VME CPU and sent to main DAQ

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Daniel Haas, EUDET Annual Meeting, Oct 2008 Page 5 The JRA1 DAQ scheme (SW) Application Thread Buffer Key: Listening Socket Command Data Logging Signal /data

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Daniel Haas, EUDET Annual Meeting, Oct 2008 Page 6 The JRA1 DAQ scheme (SW) from P. Roloff

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Daniel Haas, EUDET Annual Meeting, Oct 2008 Page 7 from P. Roloff

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Daniel Haas, EUDET Annual Meeting, Oct 2008 Page 8 from P. Roloff

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Daniel Haas, EUDET Annual Meeting, Oct 2008 Page 9 from P. Roloff

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Daniel Haas, EUDET Annual Meeting, Oct 2008 Page 10 from P. Roloff

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Daniel Haas, EUDET Annual Meeting, Oct 2008 Page 11 Current Achievements & Goals Implemented DAQ Architecture is robust, multi-platform, scalable, simple-to-use and adoptable to different users Offline processing fully on the GRID, using ‘standard’ ILC software Lots of documentation now available Current Speed achieved: ~600 Hz (2 boards/Mimotel) in ZS mode Goals (for FP6): –1 kHz –more documentation (code) Goals are (nearly) achieved see and

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Daniel Haas, EUDET Annual Meeting, Oct 2008 Page 12 User integration Creating new Producers for users is harder than it needs to be Currently each Producer requires it’s own Event data type, but they all do the same thing Need to provide a generic RawDataEvent (similar to universal reader) –Can store arrays of raw data of variable size –Has a tag with the format of the data (EUDRB / DEPFET etc.)

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Daniel Haas, EUDET Annual Meeting, Oct 2008 Page 13 Get ready for final chip EUDRB + newly designed digital daughter card (Baseline): Current VME driver could transfer data from 6 cards at around 1 kHz To achieve more, we need: –decoupling of input/output buffer in EUDRB (boards should be ready for the next frame immediately after having finished the current frame) –multi-event buffer in the EUDRB and 2e SST

DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Daniel Haas, EUDET Annual Meeting, Oct 2008 Page 14 Roadmap Next 6-9 months should bring final readout We are busy to get ready for this If other JRAs want to use our DAQ, they should provide manpower for implementation changes (we are willing to help) We should discuss requirements (dedicated meeting with TPC after this meeting)