Guidance for Implementation of National Forests Monitoring Systems CAMBODIA MGD Session Sydney, Australia March 4 th – 6 th 2015.

Slides:



Advertisements
Similar presentations
Trend of international discussions on the UNFCCC
Advertisements

Governance for REDD+ Crystal Davis Governance of Forests Initiative World Resources Institute REDD Civil Society Coordination Seminar CIFOR campus, Bogor.
PRESENTATION OUTLINE Introduction Climate change initiatives Capacity Challenges.
GEF PROJECT TEMPLATES ANDGUIDELINES George Manful (PhD) Senior Task Manager, Climate Change UNEP UNFCCC Asia and Pacific Regional Workshop on Preparing.
GFOI Capacity Building Summit Armenia, Colombia – September 17 to 19, 2014 MRV & Capacity building status CAMBODIA Sar Sophyra Forestry Administration.
Page 1 Regional Institutional Capacity Building in the Implementation of Clean Development Mechanism in ASEAN Countries March 2004 Jakarta, Indonesia.
REDD PLUS -- What is that?. 1. REDD PLUS – in brief Background: Deforestation has become a problem that the world cannot ignore.  Deforestation results.
MGD Advisory Group Meeting Sydney 5 th March 2015.
Session 12: Overview of road map - proposed actions Federal Democratic Republic of Ethiopia Ministry of Agriculture Federal Democratic Republic of Ethiopia.
Presented at the IISD and ASB Regional Workshop Hanoi, 19 th May 2011.
Basic Considerations  outlines the process by which the Government of Kenya will develop its national strategy for participating in an evolving international.
MRV and forest monitoring for REDD+ in Bangladesh Key-issues in forest monitoring and MRV for REDD+ (based on principles and provisions of Article 4 of.
Advance in the Development of a Monitoring, Reporting and Verification System Cambodia SDCG-7 Sydney, Australia March 2 th 2015.
REDD + AND SAFEGUARDS - Human Rights - Environmental Integrity - Governance Victoria Tauli Corpuz Executive Director, Tebtebba Chair, UN Permanent Forum.
READINESS TO IMPLEMENTATION Lessons and Experiences from Zambia Presented by: Deuteronomy Kasaro National REDD+ Coordinator 7th November,
MRV & Reporting Status & Related Space Data Needs CAMBODIA SDCG-7 Sydney, Australia March 4 th – 6 th 2015.
National Inventory System in Finland Workshop on QC and QA of GHG Inventories and the Establishment of National Inventory Systems 2-3 September 2004, Copenhagen.
Module developers: Erika Romijn, Wageningen University
National circumstances and inventories of GHG emissions Mirja Kosonen UNFCCC WS, Dublin.
Romania’s Reporting Activities under the UNFCCC and Kyoto Protocol Mr. Vlad Trusca Head of Climate Change Unit, UNFCCC National Focal Point Ministry of.
WMO GFOI Simon Eggleston SGCD-4, 4 th -6 th Sept 2013, Caltech, Pasadena, USA.
A. N. Gichu Kenya Forest Service REDD+ and REDD Readiness.
Presentation by Alfred N. Gichu Kenya’s REDD+ Readiness.
CDM National Authorities : an Example Prepared for the National Workshop on Capacity Development for Clean Development Mechanism (CD4CDM) March 2003,
CAPACITY BUILDING ON CLIMATE CHANGE IN UZBEKISTAN: monitoring and evaluating The Centre of Hydrometeorological Service at the Cabinet of Ministers of the.
Module 1.1 UNFCCC context and requirements and introduction to IPCC guidelines REDD+ training materials by GOFC-GOLD, Wageningen University, World Bank.
DEVELOPMENT OF THE NATIONAL INVENTORY SYSTEM IN THE REPUBLIC OF BELARUS Belarus has signed UNFCCC in June, 1992 Ratified in May, 2000.
In the Name of God, Most Gracious, Most Merciful.
Climate Change and CDM in Thailand
Introducing the REDD+ Roadmap Process Bangladesh REDD+ Roadmap Launching Workshop Dhaka, 26 th October 2011.
Strengthening MRV (Measurement, Reporting and Verification) for REDD+ Renforcer MRV (Mesure, Rapports et Vérification) pour REDD+ With support from the.
World Bank - Forest Carbon Partnership Facility: REDD+ Readiness and Country Needs Alexander Lotsch Forest Carbon Partnership Facility The World Bank
GLOBAL DIRECTION IN REDD APPROACHES AND METHODOLOGY DEVELOPMENT SINCE COP-14 UNFCCC Nur Masripatin Regional Coordinator of ARKN-FCC
1 Asian Regional Workshop on “Capacity Development for the Clean Development Mechanism” October 2005 AIT, Bangkok, Thailand Institutional Building:
Forest Carbon Partnership Facility Global Dialogue on Developing a Readiness Preparation Proposal August 13-14, 2009 Structure of the R-PP template Review.
IGES-URC Regional Workshop in Asia on Capacity Development for the Clean Development Mechanism March 2004 Siem Reap, Cambodia CDM INSTITUTIONAL FRAMEWORK.
Sustainable Fertilizers Production and Use Faustin MUNYAZIKWIYE Director/ Climate Change and International Obligations in REMA REPUPLIC OF RWANDA NAMA.
REDD+ After Cancun: Moving from Negotiation to Implementation
Developing Incentives for Reducing Emissions from Deforestation and Degradation (REDD) The Readiness Mechanism Some ideas for your consideration next steps.
ENABLING ACTIVITIES FOR THE PREPARATION OF THE KINGDOM OF CAMBODIA’S SECOND NATIONAL COMMUNCIATION TO THE UNFCCC (SNC Project) Presented by Long Rithirak.
National Forest Monitoring Systems: M & MRV in the context of REDD+ Activities MJ Sanz, FAO REDD MRV Workshop for developing a roadmap to establish an.
PRIVATE SECTOR ENGAGEMENT ON REDD+ IN VIETNAM, CURRENT AND POTENTIAL FUTURE Prepared by Vu Thanh Nam Vietnam administration of Forestry (VNFOREST)
20 February 2009 Tanzania Natural Resource Forum Carbon-Forestry Working Group 1 Conceptual and Practical Challenges in the Operationalization of REDD.
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS presented by Ermath Harrington GEF Regional Focal Point.
Guidance for Implementation of National Forests Monitoring Systems COLOMBIA EDERSSON CABRERA M. Coordinator Forest and Carbon Monitoring System SDCG-7.
Guidance for Implementation of National Forests Monitoring Systems KENYA MGD Session Sydney, Australia March 4 th – 6 th 2015.
Institutional Set-up and Staffing Arrangements FNR_Rio Project Afghanistan 13 March 2012 Tehran, Iran.
1 Second Regional Workshop Capacity Development for the Clean Development Mechanism (CD4CDM) 23 March 2004 Siem Reap, Cambodia Review and Future Plan of.
R-PLAN and REDD activities Review Lao PDR Flag of your country.
Capacity Development for the Clean Development Mechanism in the PHILIPPINES STATUS REPORT Asian Regional Workshop 16 th January 2003 Phuket, Thailand.
Global Forest Observations Initiative Simon Eggleston GFOI SDCG 5, Rome, Italy, 25 Feb 2014,
Session 10: Linking CBR+ with National REDD+ Programme in Cambodia Training of Trainer on REDD+ Concept for UNDP GEF SGP/CBR+ Grantees 7 October 2015.
CDM Development in Thailand Capacity Development for the Clean Development Mechanism Office of Natural Resources & Environmental Policy and Planning (ONEP)
REDD+ negotiations and key milestones from Cancun to Durban Geneva, 9 May 2011 Clea Paz-Rivera, UN-REDD Secretariat.
Monitoring and MRV context of the Country National Forest Inventory (NFI): the previous NFI has not covered some forest type (the sampling strategy did.
Support to National REDD+ Action: Global Programme Framework (SNA) Work Plan and Budget 2015 Information and Knowledge Sharing Sessions Twelfth.
Western Balkans Climate Resilience Workshop, Vienna, 11 – 12 May 2016.
CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM-CAM) National Workshop on Capacity Development for the Clean Development.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment and Climate Change.
Implementing REDD+ Sarah Marlay, US Forest Service, May 9, 2016.
Introduction to Malawi REDD+ Process and Outlook
Global Forest Observations Initiative - GFOI
Kenya’s REDD+ Readiness Activities
REDD+ FOR THE GUIANA SHIELD Technical Cooperation Project
Bradley Reed USGS Climate and Land Use Change
Data Component Scoping Meeting
Cambodia National REDD+ Strategy Development: Progress and Challenges
UN REDD FAO-UNDP-UNEP July 2008
DEVELOPMENT OF MRV-SYSTEM & REL/RL IN TANZANIA
ASB Partnership / ICRAF
Presentation transcript:

Guidance for Implementation of National Forests Monitoring Systems CAMBODIA MGD Session Sydney, Australia March 4 th – 6 th 2015

2 I. National REDD+ Strategy Main Strategy: Support for effective management of Cambodia’s forest, in accordance with existing laws and policies :  Innovative Financing models  Improving Forest Law enforcement and governance  Local forest protection contracts  Valuing forest ecosystem services and promoting REDD+ Co- benefit  Adopting the nested approach to REDD+ implementation Designing and implementing effective strategies to address drivers from outside the forest sector  The driver of deforestation and forest degradation that causes land use change in Cambodia ( migration, Agro-industrial development, land concession, poor ESIA..etc) MGD Session Sydney, Australia March 4 th – 6 th 2015

II. National REDD+ Management Arrangements NATIONAL CLIMATE CHANGE COMMITTEE - Main Government Coordination mechanism for climate change CAMBODIA REDD+ TASKFORCE - Chair: FA - Deputy Chair: GDANCP - Includes FA, GDANCP, MLMUPC, FiA, MEF, MoI, MRD - Decisions made by consensus REDD+ ADVISORY GROUP - Key Development Partners & Experts TASKFORCE SECRETARIAT - Chair: FA - Vice-Chair: GDANCP - National Coordinator - Taskforce Secretary - Other supporting staff MRV/REL Technical Team Benefit-sharing Technical Team Consultation and Safeguards Technical Team REDD+ Demonstration Technical Team REDD+ CONSULTATION GROUP - NGOs and Civil Society - REDD+ Projects/ Private Sector - Academic Institutions (tbc) MGD Session Sydney, Australia March 4 th – 6 th 2015 Technical Advisor -UNREDD-FAO -JICA-CAMREDD

4 RGC/Council of Ministers - management of all state properties - adopts management plans for state properties - transfers, reclassifies and designates entrusted authorities for state properties Ministry of Economy and Finance - maintains inventory of state properties - executive agent of the RGC in managing state properties, including transfer, sale, lease, concessions, etc - management of state revenue - co-chair of state trust funds 2008 Public Financial Management Law, 2006 Subdecree # 129, 2000 Subdecree #04 Ministry of Land Management, Urban Planning & Construction - manage cadastral administration of state immoveable properties - issue title/ownership certificates to all immovable properties - management of maps of Cambodia 2001 Land Law, 1999 Subdecree # 62 Ministry of Agriculture, Forestry and Fisheries - general jurisdiction for forests and forest resources (PA management under MoE) - registration of permanent forest estates Forestry Administration: - responsibility for the Permanent Forest Estate - developing and implementing national forest programme (including community forestry) - studying and collecting data on all state forests - conducting assessments of national forest carbon stocks - developing forest carbon trades - reforestation Fisheries Administration: - responsibility for flooded forest and mangrove areas - developing and implementing national fisheries plan (including community fisheries) 2002 Forestry Law, 2008 Subdecree #188, 2006 Fisheries Law Ministry of Interior (inc. NCDD) - subnational administration (prov/dist/comm) - commune development plans & funds identify functions to be transferred to sub- national councils (NCDD) 2008 Organic Law Ministry of Environment - management of Protected Areas - review environmental impact assessments - CDM interim designated national authority General Department (GDANCP): - developing and implementing National Protected Areas Strategic Management Plan - responsibility for international environmental conventions Department of Climate Change of GDANCP: - cooperate with relevant institutions to : develop national climate change strategies, and carbon credit policy, manage climate change trust funds; Secretariat of NCCC - UNFCCC focal point: negotiations, implementing UNFCCC decisions and preparing national GHG inventory reports - coordinating implementation of CDM and carbon credit projects 2008 Protected Areas Law, 1993 Royal Decree, 2008 Subdecree #37, 2009 Subdecree #175 Ministry of Rural Development - Recognize indigenous communities for registration with MoI 2001 Subdecree Institutions involved in MRV

5 III. the Progress of Phase I of NFMS for Cambodia Since we are generally in Phase I stage, our progress in Phase I is reviewed. Actions to be takenPresent situation Define the national REDD+ strategy  National REDD+ Strategy is now being drafted.  Target of completion is considered to be August Define the pillars of work of the NFMSDefinition of the satellite land monitoring system, the national forest inventory (NFI),and the national GHG inventory for Cambodia is now being made. Design NFMS and begin institutional and technical capacity building on relevant elements, including the national forest inventory and GHG inventory, to allow the measurable, reportable and verifiable emissions and removals estimates due to REDD+ activities Design of NFMS is now being discussed intensively. Design of NFI, satellite monitoring system and GHG inventory has been discussed extensively and has started to finalize. MGD Session Sydney, Australia March 4 th – 6 th 2015

6 Need to determine:  Overall design of NFMS and strategy for NFMS development  Subjects and/or activities to be monitored by who and how  Methodology to use the monitoring results 1. Design of NFMS Actions to be taken MGD Session Sydney, Australia March 4 th – 6 th 2015

7  May need to review two things based on the findings of actual mapping:  Land use/cover classes  Details of mapping  (Maps will be completed by the end of May 2015) 2. SLMS (Satellite Land Monitoring System) MGD Session Sydney, Australia March 4 th – 6 th 2015

3. NFI (National Forest Inventory) 8 Need to make:  NFI implementation plan (feasibility study) Need to determine:  NFI design (based on the feasibility study)  Relation between NFI and satellite based forest monitoring system. Complementing each other? MGD Session Sydney, Australia March 4 th – 6 th 2015

4. GHG Reporting 9 Need to determine:  Availability of activity data –for data not available now, default values of IPCC guideline need to be used.  Software to be used (or, select manual calculation method)  Default values to be used. MGD Session Sydney, Australia March 4 th – 6 th 2015

10 What are the guides used for planning and designing the National Forest Monitoring System (NFMS)  “National Forest Monitoring Systems: Monitoring and Measurement, Reporting and Verification (M & MRV) in the context of REDD+ Activities”, 2013, UN-REDD Programme.  This UN-REDD document outlines methodological proposals of the UN-REDD Programme to implement NFMS. While it is still a proposal and each country can design its own NFMS, basic requirements are the same.  It the guideline, more detail on technical aspect and statistical approach MGD Session Sydney, Australia March 4 th – 6 th 2015

11  Limited Human resources  MRV/REL Technical Team don’t have good understanding on development of NFMS  Lack of Knowledge for Awareness (documents, methodology, consultancy etc.)  Limitation of Cooperation between intergovernmental agencies  How to integrate all source of document to support NFMS and provide the robust system  Time of submission of REDD+ national strategy and REL Challenges for Development of National Forest Monitoring System MGD Session Sydney, Australia March 4 th – 6 th 2015

SDCG-7 Sydney, Australia March 4 th – 6 th Thank You For Your Attention Mrs. Sar Sophyra Contact address: FORESTRY ADMINISTRATION #40 Norodom BVLD, Daun Penh, Phnom Ppenh, CAMBODIA.

Space Data Needs What are the guides used for planning and designing the National Forest Monitoring System (NFMS) What is your current level of understanding of the GFOI MGD document Current challenges and obstacles for applying guidance while designing the NFMS Maximum of 5-6 slides MGD Session Sydney, Australia March 4 th – 6 th 2015