Furnaces and Wet bench area Savitha P. Wet bench - Movement CMOS wet bench moving to the new clean room Purchase orders for chemicals still not released.

Slides:



Advertisements
Similar presentations
Furnaces and Wet benches Savitha P. Weekly trend chart – Dry ox (5nm) Conditions: 1000 deg C – 1 min, 6 slpm oxygen flow, 20 min anneal oxide thickness.
Advertisements

for Pipelines & Casings
Chemistry safety Part 2.
Additional Precautions Personal Protective Equipment (PPE) Gloves Gown* Mask* Individuals in Contact Precautions do not require PPE when leaving their.
Without reference, identify principles relating to Intraoral X-Ray with at least 70 percent accuracy.
Evaluating Kitchen Hoods Rudy Hawkins C-1. Hood Designs and Categories - Background o Commercial Kitchen Hoods have two designs: o Exhaust Hoods o Grease.
Carbon Monoxide Detectors & Smoke Detectors. 1.Purchase carbon monoxide (CO) and smoke detectors when you first move into a house. CO when using natural.
Science By Ben, Michael, Callum and Alex G:\Assingmments\1703_Science Self Reflection_co.doc G:\science\unit 1\Science assessment.doc.
©2012 Fluke Corporation SPRT Health 1 Health Monitoring of SPRTs.
E122 E123 E124 E125 E126 E127 E128 E129 E130 E131 E135 E136 E137 E138 E136 Solar Support Centre Desks for 4 people + connection to Bruce’s Workbenches.
Furnaces and Wet bench area Savitha P. Wet bench July and August month was very busy CeNSE usage includes lab course, INUP hands-on electroplating slots.
Preventing nosocomial water- borne infections by controlling water and water systems. Leif Percival Andersen Head of Infection Control Copenhagen University.
Serene Reflection Meditation Questions based on the film.
Furnaces and wet benches Savitha P. Annealsys new RTP: facilities hook up over, waiting for gases hook up, what about the pump? K-space Ultra scan:
Furnaces and wet benches Savitha P. Metal annealing furnace – No “gold contaminated substrates” Different tubes will be provided for people worried.
Furnaces and wet benches Savitha P. TEOS installed – problems stabilizing temperature and pressure Solved with First Nano’s help – Under optimization.
Furnaces and wet benches Savitha P. Annealsys new RTP: Pump quote, hook up quote in process, time for spare parts Visit to SITAR regarding TEOS deposition.
NATIONAL NANOFABRICATION CENTRE CLEAN ROOM COMMITTEE MEETING TUMS Murthy 26 July 2011.
Residential Plumbing Where does the water in your home come from and where does it go?
Marine Engineering I.
Furnaces and wet benches Savitha P. Entry submitted for KLA Tencor contest: “Very informative and precise entry”, as per KLA – Thank you Prof. Akshay.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Arun Kumar Menon Oct 7, 2014 Cleanroom Admin Committee Meeting.
1 Copyright 2008 Digital-2000 Inc AEPP LOCKOUT/TAGOUT – HAZARDOUS ENERGY SOURCE 2.
Waste Anesthetic Gases. The anesthetic gas and vapors that leak out into the surrounding room during medical and surgical procedures are considered waste.
7 Novemeber 2014 Name 1 This report was submitted in compliance with the UNCC Code of Student Academic Integrity ( UNCC Catalog, p 276) AB OP.
Furnaces and wet benches - update Savitha P. Current status of old equipments One bench could work: Exhaust problem need to be solved Wet oxidation and.
Safety Orientation for New Employees Christine Inman Norris USCA Health and Safety Manager.
Integrated Probe Storage Easy to Read LCD Display Bright LED Indicator Light Simple 4 Arrow Navigation with Enter Key (Circle) By the Numbers: Food.
-Attaching metal with solder -Adhesion -Alloy of lead & tin- used in soft soldering- low melting point.
Performance Team Pro Software  Data base for athlete’s gains and losses during their training  There are five major pieces of equipment that will be.
Home Care and Cleaning Products. 1. Helpful Housecleaning Hints: Plan a schedule and organize the work. Certain cleaning jobs are done daily, weekly,
20/04/2012Rui De Oliveira1 20/04/2012. Rui De Oliveira2 30 cm x 30 cm example.
Sl.NoItemOwnerStatus 1a. To get the cost estimate of having a centralized compressor for all the labs at CeNSE. b. Estimate the cost of running a new pipeline.
Welcome Tips to be Green While Gardening. Recycle as much as possible Plant a tree Go paperless when possible Reuse old planting pots Purchase recycled.
Dry Etch and Thin films & Process Integration April 28th, 2015 NNfC monthly admin committee meeting.
Monthly Management Report December Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Techniques of synthesizing mono-layer Molybdenum Sulfide (MoS 2 ) Wu Kam Lam.
Furnaces and Wet bench area Savitha P. Wet bench Currently has two wet benches – one exclusively for CMOS processes Two hours slots TMAH and KOH etching.
Totaline Copper pipe for 410. Why Totaline 410 A Copper TOTALINE COPPER SPECIFICATIONS FOR R410A  Annealed coil and hard drawn straight  Chemicals UNS.
Update on module mounting on staves and stavelets 13/6/11 1 1) Status of clean room for next assembly kit 2) DC to DC stave.
Selection Sort Comparison Data Movement Sorted.
Furnaces and wet benches Savitha P. Metal annealing furnace – Semi clean substrates only – No “gold contaminated substrates” Annual maintenance shut.
Part 5: Meeting the Challenge of the “EC Tracers” Healthcare Engineering Consultants How Should I Prepare for the “EC Tracer” Part of the Survey?
Lab design Assignment 3 Unit 2.
Ref: P.ppt (03/02/2016) 1 EUROTHERM CONTROLS a bc 26/2704CP Zirconia Controller 26/2704CP-Released Mar 2002 Application specific version Compatible with.
Admin. Manager Maintenance Unit Support Asst. Administrative Services EquipmentInstrumentsLinen DON-ADMINISTRATIVE SECTION Organizational Chart.
Floods in the Lab “In nature, floods are acts of God, but in the chemical laboratory, floods are preventable accidents that still happen.” – Bruce D. Pollard.
Furnaces Today’s Agenda Function of a furnace Furnace operation Fuel Furnace parts Furnace drafts Furnace designs.
Lab Equipment & Procedures. Goggles Protect eyes.
Furnaces and Wet bench area Savitha P. Wet bench Mainly Lab course and INUP Need to have purple-nitrile gloves for all processes?
The purpose of installing fire fighting equipments is to protect the public, property, and assets in fire emergency. Manufacturers of fire protection.
Nursing Orientation. All staff AND visitors should follow the precautions listed on the sign All PPE (personal protective equipment) should be on prior.
Argon By: Chloe. -A-Argon is a gas. At room temperature that is. -Argon is non metal.
IT 244 Week 5 Assignment Physical Security Policy To purchase this material link 244-Week-5-Assignment-Physical-Security-
Tips for Efficient Air Conditioning Maintenance
Working with Beryllium in JSC “Kompozit”
Undergraduate Laboratories: Course Check-In List
The Flow of Food: An Introduction
كار همراه با آسودگي و امنيت
خطوات البحث العلمي.
Part 2 – Control and Protection
Safety Equipment and Precautions
60 Years Clean.
Around the room Orders of operations.
Counting actions- PowerPoint months
But the room is still warm, so…
Standard Business Processes

Lab Equipment Figure It Out.
Stuff I brought back from Fermilab
Presentation transcript:

Furnaces and Wet bench area Savitha P

Wet bench - Movement CMOS wet bench moving to the new clean room Purchase orders for chemicals still not released MOS chemicals will take 3-4 months to ship after release of the purchase order

Furnaces - Movement All except annealing furnaces moving to Equip. dev. room Maintenance need to be done for all – Change thermocouple (Euros ) – Gas connections to suit clean room – New tubes/ clean old tubes

Dektak, 4-probe, Film thickness probe measurement and CPD Moving to new clean room – Document made regarding precautions while moving Stylus/ probe tip to be protected Probe head to be cushioned – CPD moving to Equp. dev. room