1 paul drumm, 19 th May 2004 MICE RF By Phone at 16:00 FNAL: Al Moretti LBNL: Derun Li

Slides:



Advertisements
Similar presentations
Report to JMPB Topics: Progress Hall Clearance Programme Hall Layout Beam Line RF Power System MICE Management Structure Common Funds 14 th October 2003.
Advertisements

Norman McCubbin1 Report from the Collaboration MICE Project Board (CMPB) Norman McCubbin Director, Particle Physics Department MICE Funding Agencies Committee.
Andrew Moss ASTeC MICE RF workshop 16t h February 2012 Daresbury Laboratory Response to RF review for the MICE RF system.
RF Specification discussion MICE RF workshop 16 th April 2012.
1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Muon Front End Buncher, Phase Rotation, Cooling Schematics & CAD model based on MICE Cavities Alan Grant Daresbury (April 10, 2012)
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Neutrino Factories and Muon Colliders Leo Jenner.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
Andrew Moss Daresbury Laboratory Collaboration Meeting th 19 th October 2012 RAL MICE RF System review.
Andrew Moss Daresbury Laboratory August 2013 Latest results of MICE amplifier testing.
MICE RF & Controls Paul Drumm. RF Layout 2 MW Amplifier Master Oscillator Controls etc 201 MHz Cavity Module 2 MW Amplifier 201 MHz Cavity Module CERN.
MICE VC Alain Blondel 1 NEWS and RF review.
THE MICE RF SYSTEM J.F.Orrett* A.J.Moss, ASTeC, Daresbury Laboratory, WA4 4AD, UK Accelerator Science and Technology Centre
09 th April 2003 SINGLE SPLIT DRIVE CHAIN TH116 TH116 or TH526 RS2058 ex SPS AMP 7651 ex RAL SOLID STATE DRIVER LEVEL CONTROL AND SOURCE R.F. LEVEL FEEDBACK.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
Paul drumm daq&c-ws august/september Cooling Channel.
D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 1 Summary of RF Sessions Derun Li Center for Beam Physics Lawrence Berkeley National.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
Daresbury MICE Progress Andrew Moss Joe Orrett Peter Corlett.
Paul Drumm 9 Feb 2004 MICE at RF system: power source, distribution Paul Drumm RAL Ambitious title!
Report from RF Session (1:30-5:40 PM, 3/30/2004) H. Haseroth and Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration.
Paul Drumm 30 March 2004 MICE at RF Power System: power source, distribution Paul Drumm RAL Ambitious title!
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Status of the MICE Amplifier
H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 1 RF & RF power H. Haseroth CERN  Situation of 88 MHz test cavity  Availability of amplifiers.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
RF Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Andrew Moss Daresbury Laboratory Collaboration Meeting th -16 th February 2013 Coseners House MICE RF HP System rprogress.
MICE RF Project & Towards Step VI MICE Project Board - March 8, 2012 Alan Bross 1.
Collaboration meeting, DL, 19 h – 23 h October 2008 Andrew Moss ASTeC Collaboration meeting, DL, 19 th – 23 th October 2008 MICE RF distribution system.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
1 MICE RF Daresbury Laboratory Support Joe Orrett - ASTeC.
MICE Status (with a UK slant) Paul Drumm, MICE Collaboration UK-NF June 2003.
MICE RF System - Status Alan Bross Fermilab. RF Cavities for MICE I Eight 201-MHz cavities in the MICE cooling channel First five cavities arrived at.
MICE CM in New York Alain Blondel, June MICE COLLABORATION Columbia University June 2003 Action List (online) 1.Funding and some organization.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
13 th April 2007FFAG 07 Carl Beard EMMA RF System Carl Beard, Emma Wooldridge, Peter McIntosh, Peter Corlett, Andy Moss, James Rogers, Joe Orrett ASTeC,
PSI Contact PSI visit arranged for Feb 9th –Assessment of activity/contamination Possible remedial action –Seek additional equipment for solenoid Power.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
Progress on the MICE RF High Power Drive Systems K Ronald, University of Strathclyde For the MICE RF team 1MICE CM38 RF Parallel Session.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
High Gradient RF Issues and 88 MHz test results M. Vretenar for the 88 MHz team: R. Garoby, F. Gerigk, J. Marques, C. Rossi, M. Vretenar -The.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
MICE RF Power Status Paul Drumm ~ Sunday August 1 st 2004.
An H- stripping laser using commercial, diode-pumped Nd:YAG amplifiers Russell Wilcox Laser Stripping Workshop, April 11, 2011.
21 st to 25th September 2009 EMMA RF Systems At Daresbury Laboratory C Beard OVERVIEW OF THE EMMA RF SYSTEM Carl Beard ASTeC, STFC Daresbury Laboratory.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
TIARA WP 7 Ionisation Cooling Test Facility (ICTF) Task 7.2 Novel Pulsed RF Power Amplifier Design.
UK Neutrino Factory Conceptual Design
The ISIS Dual Harmonic Upgrade
MICE RF System Power Supplies, Control and Monitoring Status report
Progress on the MICE LLRF System
Second SPL Collaboration Meeting, Vancouver May 2009
RF Status 1 4 High Power Amplifier circuits available CERN(2)
High Efficiency X-band Klystron Design Study
Presentation transcript:

1 paul drumm, 19 th May 2004 MICE RF By Phone at 16:00 FNAL: Al Moretti LBNL: Derun Li Mike Zisman Present: CERN: Helmut Haseroth Maurizio Vretenar Han Broere DL: Mike Dykes Andy Moss Peter Corlett Joe Orrett Geneva: Alain Blondel RAL: Paul Drumm Roy Church

2 paul drumm, 19 th May 2004 Meeting Outline:

3 paul drumm, 19 th May 2004 Discussion: –Practicality of realising a 4MW amplifier; 2 MW amplifier in bits

4 paul drumm, 19 th May 2004 Discussion: –Practicality of realising a 4MW amplifier; 2 MW amplifier in bits – reconstruction 4 MW – need to upgrade to a higher voltage Tubes –TH116 Tube no longer easily available »Old ISIS tubes removed at 2.3 MW –TH170 alternative tube not a 4 MW tube –4 MW split between 4 cavities »Losses each time the power is split –Concluded too many risks

5 paul drumm, 19 th May 2004 …Discussion –Resolved to build two “2MW” circuits NF bunch rotation test circuit (88MHz) Old circuit rebuilt to “2MW” –1 MW in Cavity ≈ 1.25 MW in the amplifier “Old circuit” was limited to 1.8MW –Output coupling redesign –Expect to obtain up to 2.8 MW with TH170 tube. Conclusion: –CERN will build two “2MW” power amplifiers

6 paul drumm, 19 th May 2004 Overall Picture 2 MW Amplifier Master Oscillator Controls etc 201 MHz Cavity Module 2 MW Amplifier 201 MHz Cavity Module LBNL CERN 300 kW Amplifier HT Supplies Los Alamos HT Supplies Daresbury

7 paul drumm, 19 th May 2004 Timeline… Daresbury –Strip down and assess LBNL amplifiers2004 –Recondition LBNL circuits2005 –Develop Test stand 2005/6 CERN –Rebuild 88MHz circuit back to 201 MHz2005/6 –Rebuild “old” circuit MICE – stage V –4 amplifiers & 4 Cavities2007? –ISIS old ISIS tubes close to 2MW per cavity… –Purchase TH116 tubes; above 2MW per cavity MICE – stage VI –4 amplifiers & 8 Cavities –ISIS old ISIS tubes close to 1MW per cavity… –TH116 tubes; above 1MW per cavity

8 paul drumm, 19 th May 2004

9

10 paul drumm, 19 th May 2004

11 paul drumm, 19 th May 2004 Other issues See meeting notes… –Phase adjustment needed? –Lifetime of old ISIS tubes at 2MW? –Fresh look at costs: DL can make in house… Some spare CERN equipment (controls) Various synergies… –“rent” TH170 tube from CERN for tests –TH170 tubes - part of common funds? –Phase ±0.5 o ; Amplitude ±1% - sufficient? ±0.5 o MeV/c

12 paul drumm, 19 th May 2004 Conclusion Robust Scheme for 8 MW / 4 Amplifiers –Identified major components –Plan for construction –Indicative Cost Estimates £620k refurbish LBNL circuits + missing components €100k to provide 2 amplifiers from CERN €500k power splitting – Stage V to VI Plus ~2 SY at DL In the process of revising cost estimates…