Front-end Electronics for the Alice Detector Kjetil Ullaland Department of Physics and Technology, University of Bergen, Norway NFR meeting, University.

Slides:



Advertisements
Similar presentations
TPC / PHOS / HLT Readout Electronics overview Annual Evaluation Meeting for CERN-related Research in Norway November, 2004 University of Oslo Kjetil.
Advertisements

HLT Collaboration; High Level Trigger HLT PRR Computer Architecture Volker Lindenstruth Kirchhoff Institute for Physics Chair of Computer.
Irradiation results K.Røed, D.Röhrich, K. Ullaland, B. Pommeresche University of Bergen, Norway B.Skaali, J.Wikne, E.Olsen University of Oslo, Norway V.Lindenstruth,
Discussion of: “Terrestrial-based Radiation Upsets: A Cautionary Tale” CprE 583 Tony Kuker 12/06/05.
TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
ICAP CONTROLLER FOR HIGH-RELIABLE INTERNAL SCRUBBING Quinn Martin Steven Fingulin.
DAQ for the TPC Sector Test at Test Beam T10 ALICE DAQ Group ALICE TPC Collaboration Meeting Cagliari, Sardinia 16 – 17 May 2004.
Radiation Tolerant Source Interface Unit for the ALICE Experiment E. Dénes et al. LECC September 2005, Heidelberg.
HEP2005, Lisboa July 05 Roberto Campagnolo - CERN 1 HEP2005 International Europhysics Conference on High Energy Physics ( Lisboa-Portugal,
Torsten Alt - KIP Heidelberg IRTG 28/02/ ALICE High Level Trigger The ALICE High-Level-Trigger.
Timm M. Steinbeck - Kirchhoff Institute of Physics - University Heidelberg - DPG 2005 – HK New Test Results for the ALICE High Level Trigger.
HLT Collaboration (23-Jun-15) 1 High Level Trigger HLT PRR Planning Volker Lindenstruth Kirchhoff Institute for Physics Chair of Computer Science University.
CHEP03 - UCSD - March 24th-28th 2003 T. M. Steinbeck, V. Lindenstruth, H. Tilsner, for the Alice Collaboration Timm Morten Steinbeck, Computer Science.
Sept TPC readoutupgade meeting, Budapest1 DAQ for new TPC readout Ervin Dénes, Zoltán Fodor KFKI, Research Institute for Particle and Nuclear Physics.
UNIVERSITY OF BERGEN DEPARTMENT OF PHYSICS 1 UiB DR 2003 High Level API for the TPC-FEE control and configuration.
RCU Status 1.RCU hardware 2.Firmware/Software 3.Test setups HiB, UiB, UiO.
Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme.
DCS Detector Control System Hardware Dirk Gottschalk Volker Kiworra Volker Lindenstruth Vojtech Petracek Marc Stockmeier Heinz Tilsner Chair of Computer.
The High-Level Trigger of the ALICE Experiment Heinz Tilsner Kirchhoff-Institut für Physik Universität Heidelberg International Europhysics Conference.
Normal text - click to edit Configuring of Xilinx Virtex-II Kjetil Ullaland, Ketil Røed, Bjørn Pommeresche, Johan Alme TPC Electronics meeting. CERN
M. Adinolfi – University of Oxford – MAPMT Workshop – Imperial College 27 June Rad-Hard qualification for the LHCb RICH L0 electronics M. Adinolfi.
TRIGGER-LESS AND RECONFIGURABLE DATA ACQUISITION SYSTEM FOR POSITRON EMISSION TOMOGRAPHY Grzegorz Korcyl 2013.
RiceNIC: A Reconfigurable and Programmable Gigabit Network Interface Card Jeff Shafer, Dr. Scott Rixner Rice Computer Architecture:
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
Experience from using SRAM based FPGAs in the ALICE TPC Detector and Future Plans Johan Alme – for the ALICE TPC Collaboration FPGA.
ALICE Rad.Tolerant Electronics, 30 Aug 2004Børge Svane Nielsen, NBI1 FMD – Forward Multiplicity Detector ALICE Meeting on Rad. Tolerant Electronics CERN,
J. Christiansen, CERN - EP/MIC
Status-report TPC Electronics Meeting Dieter Röhrich, Kjetil Ullaland, Ketil Røed, Mattias Richter, Sebastian Bablok, Johan Alme.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
2/2/2009 Marina Artuso LHCb Electronics Upgrade Meeting1 Front-end FPGAs in the LHCb upgrade The issues What is known Work plan.
RCU Status 1.RCU design 2.RCU prototypes 3.RCU-SIU-RORC integration 4.RCU system for TPC test 2002 HiB, UiB, UiO.
S.Vereschagin, Yu.Zanevsky, F.Levchanovskiy S.Chernenko, G.Cheremukhina, S.Zaporozhets, A.Averyanov R&D FOR TPC MPD/NICA READOUT ELECTRONICS Varna, 2013.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
Data Acquisition Backbone Core J. Adamczewski-Musch, N. Kurz, S. Linev GSI, Experiment Electronics, Data processing group.
13/17 Sept th Workshop on Electronics for LHC and future experiments P. Antonioli INFN-Bologna 1.The TDC module of ALICE/TOF 2.Irradiation at.
17th March 2005Bernardo Mota / CERN - PH TPC FEE Status and Planning CERN, 7th March 2005 Content  Introduction  Status and Milestones  PASA, ALTRO.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
DAQMB Status – Onward to Production! S. Durkin, J. Gu, B. Bylsma, J. Gilmore,T.Y. Ling DAQ Motherboard (DMB) Initiates FE digitization and readout Receives.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
The Past... DDL in ALICE DAQ The DDL project ( )  Collaboration of CERN, Wigner RCP, and Cerntech Ltd.  The major Hungarian engineering contribution.
FPGAs in ATLAS Front-End Electronics Henrik Åkerstedt, Steffen Muschter and Christian Bohm Stockholm University.
XLV INTERNATIONAL WINTER MEETING ON NUCLEAR PHYSICS Tiago Pérez II Physikalisches Institut For the PANDA collaboration FPGA Compute node for the PANDA.
FPGA Co-processor for the ALICE High Level Trigger Gaute Grastveit University of Bergen Norway H.Helstrup 1, J.Lien 1, V.Lindenstruth 2, C.Loizides 5,
Filippo Costa ALICE DAQ ALICE DAQ future detector readout October 29, 2012 CERN.
Readout Control Unit of the Time Projection Chamber in ALICE Presented by Jørgen Lien, Høgskolen i Bergen / Universitetet i Bergen / CERN Authors: Håvard.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Ketil Røed - LECC2005 Heidelberg Irradiation tests of the ALICE TPC Front-End Electronics chain Ketil Røed Faculty of Engineering, Bergen University.
The ALICE TPC Readout Control Unit 10th Workshop on Electronics for LHC and future Experiments 13 – 17 September 2004, BOSTON, USA Carmen González Gutierrez.
Radiation Tolerance Studies using Fault Injection on the Readout Control FPGA Design of the ALICE TPC Detector Johan Alme Bergen University College, Norway.
October 12th 2005 ICALEPCS 2005D.Charlet The SPECS field bus  Global description  Module description Master Slave Mezzanine  Implementation  Link development.
The ALICE Data-Acquisition Read-out Receiver Card C. Soós et al. (for the ALICE collaboration) LECC September 2004, Boston.
Ketil Røed University of Bergen - Department of Physics Ketil Røed MSc student, microelectronics University of Bergen Norway Irradiation tests of Altera.
Use of FPGA for dataflow Filippo Costa ALICE O2 CERN
Pressure monitoring system for the CMS muon chambers
Irradiation test results for SAMPA MPW1 and plans for MPW2 irradiation tests Sohail Musa Mahmood
Børge Svane Nielsen/JJG
University of California Los Angeles
Status of the Front-End Electronics and DCS for PHOS and TPC
University of California Los Angeles
Radiation Tolerance of an Used in a Large Tracking Detector
A microTCA Based DAQ System for the CMS GEM Upgrade
PCI BASED READ-OUT RECEIVER CARD IN THE ALICE DAQ SYSTEM
Irradiation Test of the Spartan-6 Muon Port Card Mezzanine
Torsten Alt, Kjetil Ullaland, Matthias Richter, Ketil Røed, Johan Alme
Commissioning of the ALICE-PHOS trigger
Presentation transcript:

Front-end Electronics for the Alice Detector Kjetil Ullaland Department of Physics and Technology, University of Bergen, Norway NFR meeting, University of Bergen

The ALICE Experiment

Time Projection Chamber Main tracking detector Provides particle id and momentum Detection of charged particles by ionization of the gas volume 2-dimensional read-out at end-caps, drift time gives 3rd coordinate 2 x 18 sectors 4356 Front-End Cards, serving roughly channels simulated low multiplicity event designed for dN ch /dy = 8000 : ~ tracks

36 TPC Sectors, served by 6 readout subsystems, Readout Control Unit (RCU) in total 216 RCUs and 4356 Front-End Cards Ethernet ( 1 MB/s ) Detector Data Link ( 200 MB / s ) COUNTING ROOM ALTRO bus ( 200 MB / s ) ON DETECTOR FEC 128 ch FEC 128 ch FEC 128 ch FEC 128 ch FEC 128 ch FEC 128 ch DETECTOR TTC optical Link (Clock, L1 and L2 ) RCU DCS board SIU interface Trigger interface ALTRO Bus Interface Monitoring and Safety Module Data assembler Branch A Branch B Data Acquisition Incl. HLT-RORC Detector Control System Trigger and Clock System Local Slow- Control (I 2 C-serial link) TPC Front-end Electronics

Readout Control Unit Consists of: –the RCU motherboard –a DCS (Detector Control System) board embedded computer –a SIU (Source Interface Unit) mezzanine card. The system makes use of SRAM based FPGAs. –Flexibility & options for reconfiguration Major concerns are –Radiation tolerance of the electronics. –The huge data rate of the system (up to 710 GB/s without zero-suppression). Low-level data rate lowered by: –A trigger based system. (Only read out data when there are valid data) –Compressing algorithms on the ALTRO chip on the Front End Card.

Readout Control Unit SIU DCSRCU

Readout Control Unit

In ALICE, complete RCUs are to be used in: – TPC sub-detector – PHOS sub-detector – FMD sub-detector – EMCAL sub-detector DCS board used in ALICE TRD sub-detector as well. Other experiments have also expressed an interest to use the RCU. Readout Control Unit

Detector Control System (216 RCUs with DCS Boards) (PC’s with communication software) (PC’s with graphical user interface) Supervisory Layer Control Layer Field Layer Front-End Device Interface (FED) Front-End Electronics Interface (FEE)

DCS Board Embedded Computer Single board computer used in several detectors in ALICE Combines LINUX operating system with a Programmable Logic Device (PLD) Device drivers introduces an abstraction layer, decoupling software from hardware. The conceptual design is a co-development between Bergen and Heidelberg. Final hardware designed and produced in Heidelberg. Firmware/software co-designed by Bergen and Heidelberg

RCU Motherboard RCU motherboard: –Prototype developed by Bergen. –Final version a co-development between Bergen and CERN. Mass production ongoing now! –Firmware is a co-development between Bergen and CERN RCU motherboard is in the data readout chain in the TPC detector. RCU motherboard host basic controlling functionalities for the FECs Irradiation tolerance is critical!

Radiation Effects Single Event Effects (SEE) –Single Event Latch-up (SEL) –Single Event Upset (SEU) –Single Event Functional Interrupt (SEFI) Cumulative Effects –Total ionizing dose (TID) –Displacement damage SEE : Single event effects are radiation induced errors due to a single charged particle depositing energy through ionization of the material. Si p

Programmable Devices FPGA: Field Programmable Gate Array –Introduced in 1985 by Xilinx, Inc. –Array of programmable logic blocks –Logic gates, LUTs, flip-flops etc SRAM based Configuration Memory –Controls behaviour of the logic blocks –SEE major concern –Sensitive to ionizing particles –Configuration memory may change content: 1  0 / 0  1 Flash based Configuration Memory –Cumulative effects is a concern

Simulations of Radiation Enviroment Main particles of concern are hadrons of energy above MeV (nuclear interactions) Total dose for 10 Alice years is 5.7 Gy or ~0.6kRad Expected hadron flux ~ 800 hadrons/cm 2 -s (worst case) Peak at MeV (Morsch, Sandoval, Tsiledakis GSI)

Irradiation Tests at TSL and OCL SRAM based FPGAs: –Xilinx Virtex-II Pro 7 (RCU) –Altera APEX20K (RCU old prototype) –Altera EPXA1-ARM (DCS card) FLASH based FPGAs: –Actel ProAsic APA075 (RCU) Integration test –DCS embedded computer –Full FEE readout Chain Discrete components Proton irradiation –Energy: ~29, 38 & 180 MeV –Flux [p/cm 2 /s] Neutron irradiation –Energy: 50, 95, 180 MeV –Flux: 10 3 – 10 4 [n/cm 2 /s]

Results Actel FPGA: Survived dose of ~ 7 kRad. Expected for ALICE: ~ 0.6 kRad 180 MeV) Xilinx & Altera FPGA:

Conclusions of the Irradiation Tests SRAM based FPGAs: –Error rate at the limit of what can be tolerated –Radiation tolerant schemes –Detect SEUs instantaneously –Real-time read-back of configuration memory –Active partial reconfiguration (supported by Xilinx) –Error detection and correction techniques Actel FPGA (Flash): –Dose results satisfying –(exp: ~ 0.6 kRad, res: ~ 7 kRad)

Active reconfiguration Functionality of both DCS and RCU board can experience errors due to radiation effects in the FPGAs Simple reloading of configuration data causes downtime and is thus not applicable to RCU board (interruption of data-flow) -Active error detection and reconfiguration scheme using an FPGA capable of refreshing firmware w/o interrupting operation Active Partial Reconfiguration “scrubbing”

Preliminary test results with scrubbing SEFI test with Xilinx Virtex-II Pro FPGA Scrubbing started after ~200 s: Errors are corrected Continuously ~sec to “scrubb” full device Improved to ~ms seconds Bit Lines, RED = Errors Plain Shift Register (flux ~1.5*10 7 p/cm 2 -s) Test carried out by G. Tröger, KIP

HLT-RORC

The HLT-RORC is the low-level part of the High Level Trigger. Main purpose is to do online processing of the data incoming data. Found on each of the Front-end Processors on the HLT Computer Farm, receiving data directly from the RCU. A dual purpose co-processor is being implemented which alternatively can do: –Hough-transform of collected raw-data. –Cluster-finding Implemented with a Xilinx Virtex-4 FPGA and a PCI interface

HLT-RORC Developed by Bergen: –Firmware for the Clusterfinder –Conceptual Software for the Clusterfinder and the Hough-transform –DMA controller with interrupt handling –Prototype HLT-RORC PCI card for firmware/software development and testing Engineering prototype of HLT-RORC mezzanine card developed by KIP in Heidelberg.

Status Mass production of RCU motherboard and DCS board embedded computer has started. Firmware on RCU, both on the main FPGA and on the support FPGA soon ready as final engineering prototype. Firmware and Software on DCS board soon ready as final engineering prototype. HLT RORC engineering prototype finished. HLT RORC firmware/software is under development.

Outlook More irradiation tests of FEE are scheduled. –Discrete components –Integration tests Assembling of Front End Cards in the TPC end plates at CERN December 2005 – February Commissioning of TPC RCU system from February-August TPC Electronics will be installed in the ALICE pit September HLT RORC: Integrate existing firmware modules. To be fully operative by commissioning of ALICE detector in 2007.

Acknowledgements J. Alme, B. Pommeresche, M. Richter, S. Bablok, D. Larsen, B. H. Straume, O. Torheim, K. Ullaland, D. Röhrich –Department of Physics and Technology, University of Bergen, Norway K. Røed, H. Helstrup –Faculty of Engineering, Bergen University College, Norway B. Skaali, E. Olsen, J. Wikne –Department of Physics, University of Oslo A. Prokofiev –The Svedberg Laboratory, Uppsala University T. Krawutschke –Institute of Communication Engineering, University of Applied Sciences Cologne, Germany R. Keidel, Ch. Kofler –Center for Technology Transfer and Telecommunications, University of Applied Science Worms, Germany U. Frankenfeld –GSI, Gesellschaft für Schwerionenforschung, Darmstadt, Germany T. Alt, G. Tröger, D. Gottschalk, V. Lindenstruth, H. Tilsner –Kirchhoff Institute of Physics, University of Heidelberg, Germany B. Mota, R. Campagnolo, C. Gonzalez Gutierrez, A. Junique, L. Musa –CERN, European Organization for Nuclear Research, Geneva, Switzerland

TPC-Subsystem as used in radiation beam test in Uppsala April RCU system used in TPC sub-detector and in PHOS sub-detector (different Front-end Cards!) - Close to interaction point - Exposed to radiation TPC Front-end Electronics