US CMS DOE/NSF Review, 19-21 May 2003 - Trigger C&S Parallel - W. Smith1 Trigger Cost, Schedule Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.

Slides:



Advertisements
Similar presentations
LHC CMS Detector Upgrade Project US CMS Trigger Upgrade Introduction to Cost & Schedule Wesley Smith, U. Wisconsin Fermilab Directors Review 16 July 2013.
Advertisements

US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
P. Chumney, U. Wisconsin, CHEP, March 2003 CMS Regional Calorimeter Trigger - 1 Level-1 Regional Calorimeter System for CMS P. Chumney, S. Dasu, M. Jaworski,
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
C. Foudas, Imperial CMS Upgrades Workshop FNAL – Trigger Introduction Status of the CMS Trigger Upgrade Activities: –uTCA and Optical Link upgrades.
Wesley SmithAug. 17, 2010 Trigger Budget Review: Travel & COLA - 1 US CMS FY 2011 Budget Review Trigger Travel & COLA Wesley Smith Aug. 17, 2010 Outline.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
US LHC Detector M&O Evaluation Group, February 5-6, 2004: Trigger1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
AGATA Pre-processing team report AGATA Week, July 2008.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 1 US CMS FY 2011 Budget Review Trigger Labor & M&S Wesley Smith Aug. 18, 2010 Outline Overview.
DOE/NSF Review May 8-10, US CMS US CMS Detector Project Overview Dan Green US CMS Project Manager DOE/NSF Lehman Review, May 8-10, 2001.
S. Dasu, University of Wisconsin September Regional Calorimeter Trigger Outline: Status of Prototypes Plans for Production Testing Plans for Integration,
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
W. Smith, et al., U. Wisconsin, Oct 13, 2011 Calorimeter Trigger Upgrade- 1 Calorimeter Trigger Schedule M. Bachtis, A. Belknap, M. Cepeda, S. Dasu, E.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 1 US CMS TriDAS US CMS Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project.
W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
W. Smith, August 2002 U. Wisconsin Task T - 1 Task T - CMS at LHC Personnel: Professors. D. Carlsmith, S. Dasu*, D. Reeder, W. Smith* Senior Scientist.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 1 US CMS Trigger 2006 LPC Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager February.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
P. Klabbers, U. Wisconsin, LECC September 2006 CMS Regional Calorimeter Trigger - 1 Integration of the CMS Regional Calorimeter Trigger into the Level-1.
W. Smith, U. Wisconsin, IEEE, November 1, 2006 CMS Regional Calorimeter Trigger - 1 The CMS Regional Calorimeter Trigger Electronics Integration W. H.
Global Muon Trigger / RPC Interface Warsaw and Vienna Groups RPC Electronics System Review Warsaw, 8 July 2003 presented by Claudia-Elisabeth Wulz.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
W. Smith, U. Wisconsin, LHC Electronics Conference, October 1, 2003 CMS Calorimeter Regional Trigger - 1 Full Crate Test of the CMS Regional Calorimeter.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
CMS Trigger Upgrades Phase-I (1) Muon Trigger Upgrades: – CSCTF (CSC TrackFinder) – MPC (Muon Port Card) Calorimeter Trigger Upgrades: – HCAL TPG – Calorimeter.
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
CMS EMU TRIGGER ELECTRONICS
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
CSC Trigger Update Specific issues:
Darin Acosta University of Florida
Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production Complete - U. Wisconsin
CSC Trigger Meeting Summary
Sector Processor Status Report
Plans for the 2004 CSC Beam Test
Presentation transcript:

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith1 Trigger Cost, Schedule Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Review May 20, 2003 This talk is available on:

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith2 Cal. Trigger Status Processing Cards 160 MHz Backplane - all tests passed ex. full Crate Receiver Card - in production Clock Card - in production Electron ID Card - in production Jet Summary Card - pre-production under test Serial Link Cards Serial Link Test Card - finished & set sent to CERN Serial Link Mezzanine Cards - in production ASICs All ASICs tested by Vitesse & Delivered Phase, Adder, BSCAN, EISO, Sort All Designs validated ex. full crate data for EISO Full Crate Test in June, then full board production Uses first 7 Receiver, Electron production cards

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith3 RCT ASICs and Cards Component# neededStatus Backplane18Under Test - waiting for full crate* Clock & Control Card18 In production - 2nd prototype validated* Receiver Card126 In production - 2nd prototype validated Electron ISO Card126 In production - 2nd prototype validated Mezzanine Card1026Validated - in production Jet/Sum Card18Under Test - waiting for full crate* Serial Link Test Card10All Produced, in use at CERN EISO ASIC252Under Test - waiting for full crate* Sort ASIC576Validated - all in hand Adder ASIC378Validated - all in hand Boundary Scan ASIC1008Validated - all in hand Phase ASIC1026Validated - all in hand Spares not included *End of May

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith4 Cal Trigger Plans Complete Full Crate Test Uses production Crate, Backplane, Clock & Control, Receiver Card & Electron Isolation Cards Uses pre-production Jet/Summary Card Integration Tests: Integrate Serial Links w/ECAL,HCAL front-ends Operating in ECAL Lab at CERN, available to HCAL now Test interface with Global Calorimeter Trigger Planned for Fall. Uses existing Jet/Summary Card Complete production & test All production parts ordered, proceed with boards, assembly and test.

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith5 Cal. Trig. Detailed Milestones ItemEventOriginal DateUpdated Date ASICsPrototypes doneJan-01 Done BackplanePrototype done Jun-01 Done CCCPrototype done Jul-01 Done RCPrototype done Aug-01 Done EIDCPrototype done Oct-01 Done ASICsPrototype testedDec-01Jun-03 CCCPrototype testedDec-01 Done JSCPrototype doneJan-02 Done RCPrototype testedFeb-02 Done BackplanePrototype testedMar-02Jun-03 JSCPrototype testedApr-02 Jun-03 EIDCPrototype testedMay-02 Done ASICsProduction doneJun-02 Jun-03 Backplane Production doneAug-02Jan-04 CCCProduction doneSep-02Jan-04 CCCProduction testedOct-02Jan-04 RCProduction doneJan-03Jan-04 EIDCProduction doneMar-03Jan-04 RCProduction testedMay-03Jun-04 EIDCProduction testedJul-03Jun-04 JSCProduction doneFeb-04Jun-04 BackplaneProduction testedMar-04Jun-04 JSC Production testedMar-04Jun-04 ASICsProduction testedMar-04Jun-03

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith6 Muon Trigger Status On-Detector Electronics 6 Muon Port Card pre-production prototypes produced, tested stand-alone MPCs tested with Trigger Mother Boards MPC optical link testing with Sector Receiver/Processor now 20 Clock & Control Boards produced and in use Off-Detector Electronics: Track-Finder Sector Receiver/Processor pre-production prototype produced SR/SP optical link tests with MPC underway 4 Sorter preproduction boards produced, one stuffed and under test Structured Beam (25 ns) tests w/CSCs in June

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith7 CSC Muon Trigger Cards ComponentNeeded*ResponsibilityStatus MPC48Rice6 PPP built & being tested SR/SP12FloridaPPP built & being tested Clock & Control Board1Rice20 built & in use CSC Muon Sorter 1RicePPP built & under test Crates, Backplanes1FloridaPPP built & under test DDU readout1 Florida/ Ohio State Use EMU Readout *Spares not included

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith8 CSC Trigger Plans Complete Testing Program Structured beam (25 ns) with full CSCs, electronics Integration tests: MPC-SR/SP Modifications to Pre-production Prototype Designs Present boards have done well in testing & have full functionality Expect modifications to be minor Begin Production Purchase parts (FPGAs) & Manufacture boards Write Firmware & Software Program and prepare tools for FPGA configuration

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith9 Muon Trig. Detailed Milestones ItemEventBaseline DateUpdate SR/SPProto doneSep-02Done MPCProto doneSep-02Done BckplProto testedSep-02Delay: Sep-03 CCBProto testedSep-02Done SR/SPProto testedMar-03Delay: Sep-03 MPCProto testedMar-03Delay: Sep-03 SR/SP-MPC-CCBTestedJun-03Delay: Sep-03 SortProto doneAug-03OK SortProto TestedNov-03OK SortFinal Bd doneMar-04 BckplProd. doneMar-04 CCBProd. doneMar-04 SortFinal Bd TestJun-04 SR/SPProd. doneJun-04 MPCProd. doneJun-04 BckplProd. testedAug-04 CCBProd. testedAug-04 SR/SPProd. testedNov-04 MPCProd. testedNov-04

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith10 US Trigger FY03 Planning Largest costs: production parts orders Engineering costs for testing/final revisions Muon Trigger Sector Receiver/Processor & Backplane Pre-prod. Prototypes (Florida) Muon Trigger Muon Port Card, Sorter & Clock/Control Pre-prod. Prototypes (Rice) Cal Regional Trigger Production Parts & Boards (Wisconsin)

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith11 Schedule Performance Schedule changes since Lehman 2002: No schedule changes As reported in Lehman 2001/2, delays accrued due to: Change to single crate CSC Trackfinder design Adoption of newer (better performing) Cal. Trigger Link Chip Adjustment of Cal. Trig. Proto schedule to expedite ASIC validation Schedule maintained at delay offsets from 2001/2 No schedule slip experienced or anticipated Schedule mitigation planned Full-function prototypes are serving as pre-production prototypes Removes a design cycle from Muon & Cal Trigger 23 mo. scheduled production + test time can be shortened to 18 mo. Based on experience -- fully recovers schedule Schedule lag is less than installation date lag.

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith12 Recent Trigger Milestone Performance (v33) Prototypes performed sufficiently to serve as pre- production Production will proceed on schedule

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith13 Cost Performance Cost Increases since Lehman 2002: Additional Calorimeter Trigger Serial Link Cards: $59K Used for integration with ECAL & HCAL, mezzanine card production testing Additional Cal. Trig. Engineer Support: $61K Wisconsin engineer J. Lackey announces retirement for end of June Hire original trigger team engineer, T. Gorski & pay for 3 mo. Overlap & 2 mo. Lackey consulting (anticipated) Increased CSC Track Finder proto. & prod. parts costs : $144K Based on actual parts costs for pre-production prototype More performant & costly memories & FPGAs required than in baseline cost estimate Cost increase: $264K/$8.8M = 3%

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith14 US Trigger Status Pre-production prototypes completed & under test Production starting Contingency for production problems, testing difficulties or unanticipated integration tasks

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith15 US Trigger Project Resources Engineering demand remains significant thru installation & commissioning start

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith16 Trigger Transition to M&O Installation in Underground Counting Room Expect access by March ‘05 Sufficient time for installation and some testing but not for completing commissioning with detectors Need to start commissioning earlier Slice Test (on surface) With Both HCAL and EMU Verify trigger functions and interfaces by testing with detectors on surface at CERN. Use as substitute for commissioning completion step. Will check as much on surface before gaining access to underground facilities. Milestone (HG1018) planned for completion November ‘04 Underground Counting Room

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith17 US Trigger Transition to M&O Production ordering underway. M&O starts with slice test

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith18 US Trigger M&O Resources Testing & Operation of Trigger System Changing conditions  modifications

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith19 Cal. Trig. Install: Rack & Crate Layout Crate Layout for Underground Counting Room (USC55) Complete Occupies 9 racks - 2 crates per rack (10th rack has service crate) 10 foot cables require unusual positioning for data sharing. Racks will be pushed together Not to scale - Center section of each rack occupied by heat exchanger and fan tray (4U), Upper and lower heat exchanger and fan tray. Power supply below. Included in updated document (CMS IN 2001/16)

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith20 USC55 Installation Schedule Install/Commission Trig. CratesApr ‘05 -Oct ‘05 Tested Trigger Crates installed, re-tested interconnected, inter- synchronized Regional and Global Detector trigger systems integrated with each other and Global Trigger Integrate w/Detector ElectronicsOct ‘05 - Apr ‘06 Cal Trig connected to E/HCAL USC55 electronics Muon Triggers connected to detector optical fibers Integrate w/Central Trig. & DAQ Apr ‘06 - Oct. ‘06 Dedicated testing with individual detectors & w/ Central DAQ Detailed synchronization testing of all systems System CommissioningOct. ‘06 - Apr ‘07 Full capability of trigger system available Tests with all detectors & triggers operating simultaneously

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith21 CMS Electronics Installation Plans Trigger Schedule well integrated with Overall CMS schedule

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith22 Trigger Project Management CMS TriDAS Reviews (besides this) May: TriDAS Status Progress, draft R&D plans & expenses for next year May: Electronics Systems Review September: CMS Annual Review With CMS & external referees September: LHCC Comprehensive Review LHCC subcommittee +external experts November: TriDAS Annual Review R&D Plans/Progress, Cost & Schedule, Milestones Finalize R&D plans & expenses for next year Internal Annual CMS Review w/external & CMS referees

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith23 Trigger Project Management US CMS Management US Reviews Monthly (at least) Video Conferences Florida, Rice, UCLA, Wisconsin Review Progress, milestones, simulation activities US Reporting Monthly progress reports: % complete activities narrative US Integration Trigger Meetings: Calorimeter: Boston U., FNAL, Maryland, Wisconsin Muon: Ohio, Florida, Rice, UCLA, Wisconsin, others. US Trigger Site Visits: Florida, Rice, UCLA

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith24 ConcernsConcerns Installation Schedule Time for installation & commissioning tight (sched. delay) Significant time needed for integration in a synchronous pipelined system Use slice test to advance installation & commissioning Base Program Manpower Major effort on trigger software required Tasks include board testing, monitoring/controls, diagnostics, configuration downloading and documentation, modeling, physics simulation, etc. Major effort on testing & installation Planned as activity of base program manpower New Major Effort on “Slice Test Also needs base program manpower Recent DOE University program augmentation is a big help

US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith25 Conclusions - Trigger Calorimeter Trigger All Preproduction Boards tested Production started Most parts ordered, ASIC production finished Integration tests: ECAL started, HCAL starts this Fall Muon Trigger All Pre-production boards built & under test Basic stand-alone tests complete Integration testing between boards has started Integration tests starting this month w/EMU Operation in 25 ns structured beam Cost & Schedule: Small percentage cost increase Schedule holding with respect to Lehman 2002, anticipate substantial time recovery with successful pre. prod. prototypes Project Completion Transition to M&O: Slice Test