Laboratoire d’Annecy-le-vieux de Physique des Particules, France Cyril Drancourt Tuesday 16 September 2003 Optical link in Calorimeter DAQ: Link FEE(CROC)

Slides:



Advertisements
Similar presentations
1 Calorimeter Trigger to L1-Board data transmission Umberto Marconi INFN Bologna.
Advertisements

Selection Board PRR G. Avoni, I. Lax, U. Marconi INFN Bologna PRR, 13/6/06.
O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, UPO Meeting, July 6, 2012 Trigger Performance and Strategy Working Group Trigger Performance.
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL Fiber Link Issues Use of CMS Tracker Fiber Links Drew Baden University of Maryland John Elias Fermilab.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
The Optical Transmitters for the LHCb L0 Calorimeter Trigger G.Avoni, G. Balbi, A. Carbone, I. D’Antone, D. Galli, I. Lax, U. Marconi and V. Vagnoni, INFN,
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
1 L0 Calorimeter Trigger LHCb Bologna CSN1 Assisi, 22/9/04 U. Marconi INFN Sezione di Bologna.
Uni-Heidelberg, KIP, V.Angelov 1 International Workshop TRDs – Present & Future September, Romania Wafer Tester, Optical Link, GTU V. Angelov Kirchhoff.
Off Detector Electronics System [LNF-INFN] 1 Off Detector Electronics System Fan Unit ODEODE 1 ODEODE 2 ODEODE 3 ODEODE 4 ODEODE 5 ODEODE 6 ODEODE 7 ODEODE.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
SPD Control Board 16th February SPD Control Board (VFE control and SPD multiplicity) VFE’s control (I2C communication: SDA,SCL; clock; reset/trigger.
Wilco Vink 1 Outline Optical station Vertex processor board Output board Latency.
The L0 Calorimeter Trigger U. Marconi On behalf of the Bologna Group CSN1, Catania 16/9/02.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Laboratoire d’Annecy-le-vieux de Physique des Particules, France Cyril Drancourt Tuesday 3 June 2003 Common L1 Workshop Use in Calorimeter Old design with.
PS FE Board Tests LHCb - LPC Group R. Bonnefoy, G. Bohner, C. Cârloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M-L. Mercier, P. Perret, L. Royer Electronic.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Guido Haefeli CHIPP Workshop on Detector R&D Geneva, June 2008 R&D at LPHE/EPFL: SiPM and DAQ electronics.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
1 H C A L S.Sergueev, NEC2001, Varna, September 2001 CMS HCAL Slow Control System for the CMS Hadron calorimeter S.Sergueev, FNAL/JINR CMS HCAL.
SPD Very Front End Electronics Sonia Luengo Enginyeria i Arquitectura La Salle (EALS) Barcelona (SPAIN)
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
26/11/02CROP meeting-Nicolas Dumont Dayot 1 CROP (Crate Read Out Processor)  Specifications.  Topology.  Error detection-correction.  Treatment (ECAL/HCAL.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
SB 1 Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard.
W. Smith, U. Wisconsin, LHC Electronics Conference, October 1, 2003 CMS Calorimeter Regional Trigger - 1 Full Crate Test of the CMS Regional Calorimeter.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
Laboratoire de l’Accélérateur Linéaire, Orsay, France and CERN Olivier Callot 18 March 2003 Online Data Format and Condition Database Proposed data format.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Olivier Callot 4 July 2002 The L0 Calorimeter Trigger Basic principles Overall organization.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
M.N Minard Trigger Validation Board Status Cyril Drancourt, Pierre-Yves David,Victor Coco, M.N Minard - Production status - TVB tests on Cryo side.
Upgrade: Calo Trigger Calorimeter detector 20 Link = 4 copper wire Serial LVDS 280Mhz 32
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Feb 2002 HTR Status CMS HCal meeting at FIT Feb. 7-9, 2002 Tullio Grassi University of Maryland.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
25 Sept 2001Tullio Grassi From MAPLD2001 ( space community conference ) Major causes of failures.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
13 June 2006 R. Bonnefoy, C. Carloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M.-L. Mercier, S. Monteil, P. Perret LPC Clermont PS Front-End Electronics.
M.N Minard Trigger Validation Board Tests and Implantation Cyril Drancourt, Pierre-Yves David,Victor Coco, Thomas Chouvion,M.N Minard - Production status.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
2 Dec 1998F Harris LHCb Trigger Meeting L0 Trigger - ‘Real Estate’ Considerations Current thinking for the size and location of L0 trigger electronics,
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
E. Hazen1 Fermilab CMS Upgrade Workshop November 19-20, 2008 A summary of off-detector calorimeter TriDAS electronics issues Eric Hazen, Boston.
- LHCb calorimeter upgrade April 15th, News and ideas on DAQ architecture Frédéric Machefert LAL, Orsay.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
LHCb Week 27/10/04 J.LAUBSER L.P.C/IN2P3 1 Level 0 Decision Unit: Debugging and Monitoring Remi Cornat, Emmanuel Delage, Julien.
1 TWEPP 2007, Prague, Czech RepublicG. Avoni – INFN, Bologna, Italy Data transmission and selection for the L0 calorimeter trigger of LHCb G. Avoni (INFN.
LHCb Outer Tracker Electronics 40MHz Upgrade
Mapping area of the 36 PMT 9 PMT 9 PMT 9 PMT 9 PMT.
TVB TVB X 14 TRIG40 (tell40 structure) Selection board in barrack
Update on ‘Real estate’ for Level-0
CMS SLHC Calorimeter Trigger Upgrade,
Irakli MANDJAVIDZE DAPNIA, CEA Saclay, Gif-sur-Yvette, France
LHCb calorimeter main features
The Level-0 Calorimeter Trigger and the software triggers
LHCb Trigger, Online and related Electronics
The LHCb L0 Calorimeter Trigger
Front-end Electronics for the LHCb Preshower Rémi CORNAT, Gérard BOHNER, Olivier DESCHAMPS, Jacques LECOQ, Pascal PERRET LPC Clermont-Ferrand.
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

Laboratoire d’Annecy-le-vieux de Physique des Particules, France Cyril Drancourt Tuesday 16 September 2003 Optical link in Calorimeter DAQ: Link FEE(CROC) to Common L1 board 24 long optic rubbon(12 fibers) links: ~100m 20 long optic rubbon(12 fibers) links: ~ 80m 16 small optic rubbon(12 fibers) links: ~10m 4 optic patch-panel. TRIGGER: Link FEE(Validation) to Selection Crate 208 long optic single links: ~ 80m

Cyril Tuesday 16 September 2003Zurich LHCb week2 Calorimeters: Optical link FEE crate <> common L1 Config A,B,C (14) Config D,E (4) 4 Optic patch-panel  HCAL, SPD/PS, ECALHCALSPD/PSECAL  ECAL ECAL FEE Calorimeter Crate CROC card output Common L1 board 20 long optic rubbon link (~80m) 24 long optic rubbon link (~100m) 16 small optic rubbon link (~10m) Each optic rubbon link have 12 fibers (GOL transmitter: Bologna design) (TLK2501 receiver)

Cyril Tuesday 16 September 2003Zurich LHCb week3 Calorimeters: Optical link FEE crate<> selection crate Selection crate L0 decision Unit Lvds link FEE (ECAL) Calorimeter Crate Validation card output FEE (PS/ SPD) Calorimeter Crate Validation card output 8 x14 x 5 to 8 (GOL transmitter: Bologna design) 5 to long optic single link (~80m)

Cyril Tuesday 16 September 2003Zurich LHCb week4

Cyril Tuesday 16 September 2003Zurich LHCb week5 Calorimeters: 4 detectors, 16 areas  We don’t mix electronic between 2 differents areas Hcal right: 2 granularity (possible mix) Hcal left: 2 granularity (possible mix) Ecal right: 3 granularity Ecal left: 3 granularity SPD/PS right: 3 granularity SPD/PS left: 3 granularity Total = 16 areas

Cyril Tuesday 16 September 2003Zurich LHCb week Crates 2 Crate 3 Crates 5 Crate ECAL Left Crates Crates Duplication of FE8 output in the CROC Crate NC 8 NC NC Patch-panel: 44 fibers Patch-panel: 30 fibers Common L1 board 4 Config D Config E Config C ECAL: fiber between CROC and common L1 board 1 Duplication of FE8 output in the CROC 1 Duplication of FE8 output in the CROC 1 Duplication of FE8 output in the CROC

Cyril Tuesday 16 September 2003Zurich LHCb week7 HCAL Left NC Crate Crate Config B Config A HCAL: fiber between CROC and common L1 board

Cyril Tuesday 16 September 2003Zurich LHCb week8 Crates PreShower + SPD Left NC Crates Crates Crates NC 2 2 Config A Config B PreShower+SPD : fiber between CROC and common L1 board

Cyril Tuesday 16 September 2003Zurich LHCb week9 CROC fiber output (ECAL, HCAL, PreShower+SPD) Crate FEE :FE3,FE4,FE5,FE6,FE7,FE8,FE9,FE10,FE11,FE12,FE13,FE14 :FE1,FE2,FE15,FE16,duplicationFE8,nc,nc,nc,nc,nc,nc,nc  the CROC board output is with 2 rubbons.  Each rubbon has 12 optic fibers.  Each fiber is for one fix FEE board. CROC FE1 FE16 7 fibers N.C.

Cyril Tuesday 16 September 2003Zurich LHCb week10 Calorimeters: Validation card link max 1 input min 1 output min max max, 6 inputs min

Cyril Tuesday 16 September 2003Zurich LHCb week11 Calorimeters: FEE area to validation card Half ECAL detector: left side 14 half-backplane links FEE<> Validation card For half ECAL detector 40 cable links (RJ45) FEE<> Validation card For half HCAL detector Half HCAL detector: left side One validation card receive 6 to 8 ECAL inputs Example: Validation card Number 1  8 ECAL inputs Validation card Number 11  6 ECAL inputs One validation card receive 1 to 4 HCAL inputs Example: Validation card Number 1  4 HCAL inputs Validation card Number 11  1 HCAL input ECAL FEE card number HCAL FEE card number Validation card number