Silicon Inner Layer Sensor PRR, 8 August 2003 1 G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.

Slides:



Advertisements
Similar presentations
M. Gilchriese US ATLAS Pixel Meeting July 18-19, 2002 UC Santa Cruz.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
For high fluence, good S/N ratio thanks to: Single strip leakage current I leak  95nA at T  -5C Interstrip capacitance  3pF SVX4 chip 10 modules fully.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
W. Freeman, D0 PMG 25-Feb-03 1 Run IIb Schedule Status u Schedule Status u Update on near-term equipment expenditures u Budgeting Update u Summary.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 1 DØ Inner Layer Sensor Production Readiness Review August 08, 2003 M. Demarteau, G. Ginther.
From Research Prototype to Production
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Silicon RunIIb Workshop, Dec , A. Bean, M. Demarteau Slide 1 Workshop  Workshop is to “Move beyond the Technical Design Proposal”  Many.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Lehman DOE Review, September 24-26, M. Demarteau Slide 1 Lehman DOE Review September 24-26, 2002 Marcel Demarteau Fermilab ‘ The DØ Run 2b Silicon.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
DOE Rev of Run IIb Sep 24-26, Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University Frank Lehner University.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
Ronald Lipton Layer 0 Status PMG Sep Status of the Layer 0 Project – emphasis on hardware status, preproduction, and preparations for shutdown work.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
Rev of Run IIb, Nov 4-8, 2002, A. Bean 1 Silicon Management  Organization and Management  Schedule  Resources  Conclusions Alice Bean Univ. of Kansas.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
Dzero Beaune Workshop, June 15-20, M. Demarteau Slide 1 DØ Beaune Workshop June 15-20, 2003 Marcel Demarteau Fermilab ‘ The DØ Run 2b Silicon Tracker.
Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 1 DØ Inner Layer Sensor Production Readiness Review August 08, 2003 M. Demarteau for the.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
PHENIX Vertex Detector with Conventional Strip Sensors Abhay Deshpande Stony Brook University.
1 KU MRI What is the MRI? What is KU doing? Firmware/testboards Optical hybrids Sensors.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications.
Run2b Silicon Detector Design goals of Run2b Si system Stave design Silicon sensors Schedule K. Hara (U. Tsukuba)
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
A suggestion for the naming of parts in Silicon Run IIb L. Bagby, E. Chabalina, A. Nomerotski, E. von Toerne + others February 2003.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Dzero Collaboration Meeting, Sept. 14, M. DemarteauEric Flattum - Fermilab 1 Slide 1 Alice Bean Fermilab/University of Kansas for the D0 Run2b silicon.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
B => J/     Gerd J. Kunde PHENIX Silicon Endcap  Mini-strips (50um*2mm – 50um*11mm)  Will not use ALICE chip  Instead custom design based on.
Hybrid CMOS strip detectors J. Dopke for the ATLAS strip CMOS group UK community meeting on CMOS sensors for particle tracking , Cosenors House,
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
DT-LHCb coordination meeting 18 April 2016
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
Update on the SVD construction
7th Belle II VXD Workshop, Prague
Tracker Outer Barrel Silicon
Presentation transcript:

Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther University of Rochester On behalf of the Run IIb Silicon Group

Silicon Inner Layer Sensor PRR, 8 August G. Ginther Detector Design  Six layer silicon tracker, divided into two radial groups and two barrels u Inner layers: Layers 0 and 1 s 18mm < R < 39mm s Axial readout only  50/58  m readout for L0/L1 s Assembled into one unit s Mounted on integrated support u Outer layers: Layers 2-5 s 53mm < R < 164 mm s Axial and stereo readout  60  m readout pitch s Stave support structure  Employs only single sided silicon u Three sensor sizes  L0 (2 chip) L1 (3 chip) L2-L5 (5 chip) u All sensors have intermediate strips

Silicon Inner Layer Sensor PRR, 8 August G. Ginther  12 sided carbon fiber support structures  Six sensors mounted on each side of the support structure Inner Layers Layer 0 pre-prototype with co-bonded grounding flex circuits L1 Support Structure Assembly

Silicon Inner Layer Sensor PRR, 8 August G. Ginther Readout Schematics Layers 1-5: Hybrids mounted directly on silicon Layer 0: Hybrids connected to sensors via analog cables (to address space and thermal constraints) SVX4 chips mounted on hybrids; employed in SVX2 readout mode to facilitate reuse of Run IIa higher level readout infrastructure Interface with current DAQ system Sensor 8’ Twisted Pair Cable Adapter Card Junction Card 2’ Digital Cable Hybrid Sensor 8’ Twisted Pair Cable Interface with current DAQ system Junction Card 2’ Digital Cable Analog Cable Hybrid

Silicon Inner Layer Sensor PRR, 8 August G. Ginther  Layer 1 Sensors u Prototypes s 10 prototype Hamamatsu sensors ordered April 2002 and delivered 21 Sept 2002 s Three sensors irradiated at KSU s Ordered the remaining 3 prototype L1 sensors that Hamamatsu had on the shelf, and these arrived 16 July 2003 s These sensors are of very high quality u 144 production sensors installed in final assembly s BOE includes 50% spare sensors --estimates based on 120 yen/$ –60.5K$ NRE and 94.0K$ for 216 sensors (and 30% contingency)  Layer 0 Sensors u Prototypes s Only ELMA sensors available u 144 production sensors installed in final assembly s BOE includes 50% spare sensors –54.8K$ NRE and 59.6K$ for 216 sensors (and 75% contingency) Inner Layer Sensors

Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on Sensors  Sensor studies completed u Electrical characteristics of prototype L1 sensors and test structures u Irradiation studies reviewed and completed u Flux normalization verified via foil activation  Preparation for arrival of production sensors u Certification of sensor probing sites s Fermilab s Kansas State University s Stony Brook s Rochester (new probing site currently under development) u Visual and mechanical inspection prep u Procedures and database setup  Outer layer sensor order placed u 130 sensors arrived on 1 August 2003 u QA evaluation in progress

Silicon Inner Layer Sensor PRR, 8 August G. Ginther Advances in Other Areas  Second round SVX4 readout chip prototype approved, fabricated and currently under test u Yield appears to be high and chip appears fully functional  Hybrid and module burn-in test stands completed  Prototype analog cables delivered and tested  Prototype L0 hybrids delivered and tested  Grounding scheme on hybrids revised  Grounding scheme for inner layer support structures developed and being prototyped  Fabrication fixtures prototyped and tested  Mechanical grade pre-production stave fabricated  Electrical grade pre-production stave in progress  Carbon fiber (and autoclave) for stave shells ordered  Bearings placed on z=0 prototype bulkhead

Silicon Inner Layer Sensor PRR, 8 August G. Ginther Silicon Upgrade Status

Silicon Inner Layer Sensor PRR, 8 August G. Ginther Sensor Production Schedule  Hamamatsu provided a sensor production schedule which includes L0 and L1 sensors  Delivery of first batch of L2-5 sensors was almost on schedule

Silicon Inner Layer Sensor PRR, 8 August G. Ginther Sensor Delivery  If delivery of L0 sensors is completed u after 14 Sept 04, project misses DOE milestone u by 14 Sept 04 should not cause module production slip s If Hamamatsu L0 sensor production schedule just slips with the order date slip, then this order should be placed within 3 months to avoid module production slip –Order for L2-L5 sensors took six weeks from PRR to release s And, we have no prototype Hamamatsu L0 sensors, and would prefer to get a few asap for studies u after 16 Sept 04 puts L0 sensors on critical path s 2 days slack relative to current silicon ready to move date  If delivery of L1 sensors is completed u after 28 June 04, project misses DOE milestone u by 24 June 04 should not cause module production slip s If Hamamatsu L1 sensor production schedule just slips with order date slip, then this order should be placed within a month to avoid module production slip u after 4 October 04 puts L1 sensors on critical path s 14.2 weeks slack relative to current silicon ready to move date

Silicon Inner Layer Sensor PRR, 8 August G. Ginther Summary  Excellent progress on prototyping and pre-production of the D0 Run IIb Silicon Upgrade u Prototypes of all components of the design are in hand u Pre-production for most parts in progress u Remaining technical challenges are being addressed u Have started placing production orders  A strong, knowledgeable, experienced and very dedicated team is working hard (in a rather challenging climate) to produce the upgraded silicon detector that D0 needs to significantly enhance its performance throughout Run IIb  The constraints on the project dictate that we continue to push ahead in spite of the uncertainty

Silicon Inner Layer Sensor PRR, 8 August G. Ginther Charge  The Committee is requested to review the overall readiness for placing the production order for the inner layer sensors for the DZero Run IIb silicon detector. In particular, the project is requesting that the Committee evaluate the following items: u Whether the sensor specifications meet the technical requirements for Run IIb, recommending any changes that may be necessary. This should include, but not be limited to, consideration of results from radiation testing. u The completeness and viability of the quality assurance program the project has in place to qualify the production-version inner layer sensors, including a review of: s Soundness of the logistics of the testing and qualification plans; s Technical specifications and criteria for quality assurance; s Adequacy of the resources, both labor and equipment, that have been requested in the project plan for testing and QA. Included here should be an evaluation as to whether the throughput of qualified sensors will be adequate to maintain the project schedule; s The adequacy of the plans for logging data from sensor testing. u The overall technical readiness for placing the order, and the procurement readiness and strategy. If the Committee has any reservations here, it is requested that they describe what additional work should be done in order to meet proper readiness criteria.

Silicon Inner Layer Sensor PRR, 8 August G. Ginther Inner Layer Sensor PRR  Thank you for the insights, constructive comments, and recommendations that resulted from your review of the Outer Layer Sensors  Thanks for taking the time to help us in this important endeavor