Pixel Pilot system Simon Kwan November 8, 2011 Pixel Upgrade Parallel Session CMS Upgrade Week, Nov 7-10, 20111.

Slides:



Advertisements
Similar presentations
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Advertisements

Questionnaire Response
M. Gilchriese US ATLAS Pixel Meeting July 18-19, 2002 UC Santa Cruz.
A “BTeV” Hybrid Pixel Telescope for MTest David Christian May 4, 2007.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
Slide 1 FEC Software 21 April 2004 R.Stone Rutgers University Pixel FEC Workshop.
Slide 1 Control Software for the CMS Pixel Readout 28 April 2004 R.Stone, Rutgers (J.Doroshenko, DW.Kim, U.Joshi, L.Perera, J.C. Yun, et al) CMS Pixel.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
21 Sept 2009 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
Institutional Responsibilities HEPHY – CMS Management Meeting June 20, 2013.
Progress on the CMS Pixel front-end system ACES Workshop CERN 4. March 2009 R. Horisberger Paul Scherrer Institut.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
FF-LYNX (*): Fast and Flexible protocols and interfaces for data transmission and distribution of clock, trigger and control signals (*) project funded.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
Beam Tests of 3D Vertically Interconnected Prototypes Matthew Jones (Purdue University) Grzegorz Deptuch, Scott Holm, Ryan Rivera, Lorenzo Uplegger (FNAL)
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
Hybrid Pixel R&D After BTeV As of two years ago: –FNAL-designed readout chip had two minor fatal flaws. –No system demonstration had yet been done. An.
Pixel Endcap Power Distribution Phase 1 Upgrade Plans Fermilab, University of Mississippi, University of Iowa Lalith Perera University of Mississippi CMS.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Some thoughts on Tracking System for Stage 1 HPS Simon Kwan Fermilab 09/19/2011.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
Overview of a Plan for Simulating a Tracking Trigger (Fermilab) Overview of a Plan for Simulating a Tracking Trigger Harry Cheung (Fermilab)
CMS pixel telescope at MTEST 1 A. Kumar, S. Kwan, A. Prosser, R. Rivera, M. Turqueti, L. Uplegger.
Some thoughts on Tracking System for Stage 1 HPS Simon Kwan Fermilab 09/28/2012.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
1 KU MRI What is the MRI? What is KU doing? Firmware/testboards Optical hybrids Sensors.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Understanding Readout Issues with the Pilot System October Fpix Upgrade Meeting Bora Akgün Will Johns Karl Ecklund Helmut Steininger Jordan Tucker.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
Pixel Pilot system Hardware Status Simon Kwan August 28, 2012 CMS Pixel Upgrade Workshop, Grindelwald1.
Status report on the development of a TPC readout system based on the SALTRO-16 chip and some thoughts about the next step Leif Jönsson AIDA Meeting Vienna.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Vertex2011 Rust, June 21, 2011 W. Bertl PSI CMS Pixel Upgrade W. Bertl Paul Scherrer Institut 5232 Villigen-PSI, Switzerland.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
An Overview of the FPIX Detector Upgrade – CMS Experiment
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Markus Friedl (HEPHY Vienna)
Technical Design for the Mu3e Detector
Preliminary thoughts on SVT services
Pixel Upgrade Status & Plans
Planes, Telescope, System
Readout System of the CMS Pixel Detector
T1 Electronic status Conclusions Electronics Cards:
Mini-drawers, FE-ASIC , Integrator
Work packages status in Torino and perspectives
System Tests at Lyon From Aachen: ICB for front petal side A, disks 4-6, rings 4 and 6 From CERN: CCU25 Tests (M. Ageron): FEC ring and I2C addressing.
The CMS Tracking Readout and Front End Driver Testing
Plans for the 2004 CSC Beam Test
Presentation transcript:

Pixel Pilot system Simon Kwan November 8, 2011 Pixel Upgrade Parallel Session CMS Upgrade Week, Nov 7-10, 20111

FPIX Pilot Blades with PSI46dig ROC (Roland Horisberger, February CMS Tracker Week) FPIX mechanics, cooling & cabling was originally designed for 3 disks each side. Present installed FPIX system has only 2 disks equipped. All cables, fibres and cooling pipes for 3 rd disk exist ! Proposal: After repair of present FPIX during LS1 insert the 3 rd disk mechanic and mount a few pilot blades of old design with new digital ROC (PSI46dig) and provide for these blades a few (already existing) readout fibres with old AOH. Can operate and commission new digital ROC under realistic conditions (use CMS tracking as beam telescope) and write all the necessary software changes in DAQ, DB and DQM for a smooth and swift transition for the new upgraded pixel system in 2016/17

Goals for the Pilot System First and foremost, no or little impact on the operation of the current pixel detector operation experience in the new ROCs and TBM and digital transmission and readout with the new POH and FED at P5 Get a head start on DAQ (new FED firmware and software, perhaps new FEC firmware), calibration procedure, DQM Study how the TBM and FED would handle PKAM events Study the performance (inefficiency) of new ROC in the high rate environment of the LHC CMS Upgrade Week, Nov 7-10, 20113

General Considerations No or little impact on the current detector operation Will use the new PSI46dig ROC and new TBM Use the same electronic circuits that we plan for the FPIX upgrade detector New FED; modified DAQ software What do we gain from doing this than couldn’t be accomplished by doing a full system test of the real components/circuits that we will use for the Phase 1 upgrade – PROS: P5 running in collider environment; head-start on DAQ, DCS, DQM etc; – CONS: resources, diversion from Operation and main Upgrade effort; results may be affected by the existing system constraints

Plan Build a few blades using the new FPIX 2x8 module design Mount the new modules on to the Al brazed channel and existing Al ring support (same mechanical support/cooling arrangement as the current FPIX detector) as third disk on one of the existing FPIX half cylinders The geometrical configuration is similar to the outer assembly for the FPIX upgrade New HDI, Al cable, (probably) new port card, POHs CCU board and token ring already exists Since we are not short of fibers, we have the flexibility of using either TBM_bpix or TBM_fpix with or without the new Datakeeper Will try to use as close to the new FPIX readout chain as possible CMS Upgrade Week, Nov 7-10, 20115

Pilot System Model CMS Upgrade Week, Nov 7-10, 20116

From Joe Howell

DC-DC Conversion Upgrade pixel detector will use DC-DC conversion for power distribution While DC-DC conversion is not needed for the pilot system, we would like to test this as well to learn the operation and control, understand whether there could be any issues (e.g. interference and pick-up by other electronic circuits) Tentative plan: some modules will be powered by conventional method while some others will be powered by DC-DC converters; build two half disks and install them on different half cylinders CMS Upgrade Week, Nov 7-10, 20119

Parts and hardware Needed New 2x8 modules using PSI46dig ROC (PSI), new TBM (Rutgers) New sensor (FNAL contract with SINTEF – expected delivery next Spring; Pixel upgrade working on a new contract with CiS) Bump bonding ?? (RTI? VTT?) New Al cable prototype (results see doc #4970); need another submission HDI (will start design this FY) POH (prototype tested; re-design under review); but tests done at various places showed that the old AOH should work (see next slides) New port card (discussion with Sergey and others); but we have done tests to show that the current port card would also work Other chips (CCU, gatekeeper, TPLL, ALT…); datakeeper?? Module production & assembly (Purdue, Nebraska, …) Module test-stand, Full chain readout system test-stand, and DAQ test stand (how many?) Mechanical support and cooling channel (exist) New FED (Vienna, Vanderbilt) ; other proposals?? Power supply, cables, and fibers (exist) DC-DC converter CMS Upgrade Week, Nov 7-10,

CERN Measurements Amplitude = 107  W Rise Time = 1.3 ns FNAL Measurements Amplitude = 119  W Rise Time = 1.45 ns Input Amplitude = 600 mV differential Input signal = PRBS CERN and FNAL AOH Optical Eye 400 Mbps

KU Downstream readout tests 1.Linktester board with FPGA to spit out pattern and program I2C 2.LCDS driver chip 3.1m long Microtwisted pair 4.AOH/POH mounted on adapter board 5.Fiber from OH goes to fast O-scope input

Top: LCDS driver  1m micro-twisted pair cable,  AOH Bottom: FPGA board to scope directly KU AOH Eye Diagram Mbps Pseudo-random bit result from KU setup 20ns OH out

List of Tasks ROC testing (performance test, beam test, high rate test, irradiation, SEU etc) TBM design and test (functionality, irradiation, SEU test) Sensor (qualification, irradiation, beam test?) Bump bonding (qualification) DC-DC converter board Module test (qualification, characterization, temp cycle, calibration) System test (full electronics readout chain) Assembly and testing at TIF Commissioning at TIF (with the existing pilot detector?) Installation and test at new repair facility into one of the half cylinders New FED hardware/firmware/software FEC firmware DAQ (stand-alone, integration with rest of FPIX, integration with CMS) DCS (stand-alone, integration with Tracker DCS) DQM Simulation Tracking Database

Schedule LS1 will end late 2014? PSI46digv1 : which version? Submission in Nov 2011; expect wafers back in Feb/March 2012; tests …..; TBM (FPIX version) design not quite ready Sensor: available say May/June 2012? Bump bonding: starts summer 2012 Al cable: waiting to hear back from vendors on quote; in principle, could go ahead and ask CERN to produce more another batch Electronics: expect to have them (HDI, POH, Al cable) by the end of CY2012 Port card: needs to have some idea on Datakeeper (dimension, pinout). But old port card also work with mods (maybe a small adapter to connect the Al cable to the old port card) DC-DC converter (AMIS5 submission early next year) proposed milestones to USCMS Management: POH, Port card, and HDI should be completed during FY12 CMS Upgrade Week, Nov 7-10,

M&S Cost CMS Upgrade Week, Nov 7-10,

Interested Parties CERN (activities to be defined; would like to see the list of tasks first before deciding) Finland – Helsinki (VTT bump—bonding) France – Lyon (DAQ) UK – RAL (DAQ, FED firmware) US – FNAL, Purdue, Vanderbilt, MRI institutes (KU,KSU, Rice, Rutgers, UIC, UNL, UPR) CMS Upgrade Week, Nov 7-10,

Summary No show-stopper Many groups have expressed interest Good exercise to gain operation experience in CMS for the new readout chain and any mods to the DAQ and power distribution Modest M&S cost Instead of a diversion from pixel operation, we could have a larger pool of experts if new people could get involved in the pixel DAQ CMS Upgrade Week, Nov 7-10,