DNB Cross Talk Review 1 July 2014 Steve Miller (CSU-CIRA) Contributions from William Straka (UW-CIMSS), Curtis Seaman (CSU-CIRA), Lushalan Liao (NGST),

Slides:



Advertisements
Similar presentations
Lecture 8: Testing, Verification and Validation
Advertisements

Evaluating Calibration of MODIS Thermal Emissive Bands Using Infrared Atmospheric Sounding Interferometer Measurements Yonghong Li a, Aisheng Wu a, Xiaoxiong.
T3 Webinar September 2012 Performance Measures Edward J. Smaglik September 18 th, 2012.
Rosetta Magnetic Field PDS Review B. J. Anderson.
737 PNEUMATICS MENU PRINCIPAL.
APS-DPP-2005-LeBlanc-1 Update on MPTS B.P. LeBlanc Princeton Plasma Physics Laboratory NSTX Results Review July 26-27, 2006 Princeton, NJ.
Tommy Jasmin1, Dan Lindsey2, Steve Miller3, Thomas Rink1, Don Hillger2
Developing the VIIRS/DNB Lunar Reflectance Product Steve Miller Updated: 27 July 2012.
VIIRS Day/Night Band (DNB) Stray Light Correction Approach
Chandra X-Ray Observatory CXC Paul Plucinsky CUC September Overall Status of the Instrument 2.Update on Controlling the FP Temperature ACIS Ops.
Testing the EPIC hard band calibration S. Molendi (IASF/CNR)
Status of  b Scan Jianchun Wang Syracuse University Representing L b scanners CLEO Meeting 05/11/02.
Detectors for the JWST Near Infrared Spectrograph (NIRSpec) B.J. Rauscher 1, P. Strada 2, M.W. Regan 3, D.F. Figer 3, P. Jakobsen 2, S.H. Moseley 1, T.
1 High Resolution Daily Sea Surface Temperature Analysis Errors Richard W. Reynolds (NOAA, CICS) Dudley B. Chelton (Oregon State University)
Steven Miller Cooperative Institute for Research in the Atmosphere (CIRA), Colorado State University, Ft. Collins, CO Jeremy Solbrig, Mindy Surratt, Kim.
OSSEs to assess the impact of early morning orbit coverage Sean P.F. Casey 1,2,3,4, Michiko Masutani 3,5, Jack Woollen 3,5, Lars Peter Riishojgaard 2,3,
VIIRS Nighttime Lights Algorithm Development 2015
Pipeline Qra Seminar Title slide Title slide.
Improved Scaling for DNB Imagery in the Alaska Region Curtis Seaman CIRA/Colorado State University.
1 VIIRS DNB Aurora Event 7/15/2012 – 7/17/2012 William Straka III (CIMSS) utilizing data from Visualized in McIDAS-V 1.
1 DNB Terrain Correction Slide Fire, AZ Part 2 William Straka III 1.
NCC Status December 04, 2012 Calvin Liang Stephanie Weiss NGAS A&DP.
Chapter 6 Control Using Wireless Throttling Valves.
Profile Measurement of HSX Plasma Using Thomson Scattering K. Zhai, F.S.B. Anderson, J. Canik, K. Likin, K. J. Willis, D.T. Anderson, HSX Plasma Laboratory,
Passive Investors and Managed Money in Commodity Futures Part 2: Liquidity Prepared for: The CME Group Prepared by: October, 2008.
Future? The. Background 2003: 2003: EPIC established out of PERNA project. “All of country” licenses negotiated with EBSCO & Thomson Gale By 2007: By.
Chapter 2 Risk Measurement and Metrics. Measuring the Outcomes of Uncertainty and Risk Risk is a consequence of uncertainty. Although they are connected,
Practical Experience with Small-scale Projects: Issues and Suggestions Johannes Heister, Lasse Ringius Carbon Finance Unit, World Bank Bonn, 9-10 March.
CloudSat/VIIRS CBH Validation Activities at CIRA Curtis Seaman, Yoo-Jeong Noh, Steve Miller, Dan Lindsey 10 September 2012.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Monthly Market Watch for Maricopa County An overview of what is happening in the Maricopa County real estate market (using January 2011 statistics) Provided.
Why do we need to do it? What are the basic tools?
Fine Pixel CCD for ILC Vertex Detector ‘08 7/31 Y. Takubo (Tohoku U.) for ILC-FPCCD vertex group ILC vertex detector Fine Pixel CCD (FPCCD) Test-sample.
GIST th -16 th Dec B.Stewart RAL Mirror Anomaly Review Board Update.
TDI-CIS扫描MTF模型 李林
HFT-prototype BUR considerations for Run-13 The main goal of the HFT engineering run will be system verification and correction; this includes the study.
CBH statistics for the Provisional Review Curtis Seaman, Yoo-Jeong Noh, Steve Miller and Dan Lindsey CIRA/Colorado State University 12/27/2013.
MODIS Collection 6 MCST Proposed Changes to L1B. Page 2 Introduction MODIS Collection History –Collection 5 – Feb present –Collection 4 – Jan.
The Application of Observation Adjoint Sensitivity to Satellite Assimilation Problems Nancy L. Baker Naval Research Laboratory Monterey, CA.
VIIRS channel M06 saturation and “fold over” Curtis Seaman CSU/CIRA 5/2/2012.
Jyly 8, 2009, 3rd open meeting of Belle II collaboration, KEK1 Charles University Prague Zdeněk Doležal for the DEPFET beam test group 3rd Open Meeting.
Leveraging of Suomi NPP VIIRS. Ice Jams and Flooding: Yukon River Example 1 May 2012 Yukon River frozen over VIIRS “Natural Color” ( I-1, I-2, I-3 ) imagery.
2011 ACSI Survey Summary HDF/HDF-EOS Workshop Riverdale, MD April 18, 2012.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
MODIS Preprocessing (before L1B) Changes over the Last Year (and looking forward) Chris Moeller and others CIMSS; Univ. Wisconsin July 13, 2004 Thanks.
1 st post launch SCIAMACHY calibration & Verification Meeting L1b Astrium Friedrichshafen – Germany 24 July 2002 First level 1b Leakage current analysis.
Monthly Market Watch for Maricopa County Anoverview of what is happening in the Maricopa County real estate market (using January 2009 statistics) Provided.
1 VIIRS McIDAS-V Casselton, ND Train Derailment December 31, 2013 William Straka III 1.
Introduction to NCC in AWIPS VISIT Satellite Chat (18 Dec 2015)
VIIRS NCC Imagery at Beta CCR DR 4859 Dr. Thomas Kopp – Imagery Validation Lead Dr. Donald Hillger – Imagery Product Lead Mr. Ryan Williams - Imagery.
1 GLIMPSING THE FIRST PRODUCTS FROM VIIRS Dr. Wayne Esaias NASA GSFC Thomas F. Lee Jeffrey Hawkins Arunas Kuciauskas Kim Richardson Jeremy Solbrig Naval.
PXD ASIC review, October 2014 ASIC Review 1 H-.G. Moser, 18 th B2GM, June 2014 Date and Location MPP, October 27, 10:00 – October 28, 16:00, Room 313 Reviewers:
Japan Meteorological Agency, June 2016 Coordination Group for Meteorological Satellites - CGMS Non-Meteorological Application for Himawari-8 Presented.
3D Diamond Detectors: Update on Current Work Steven A. Murphy 16 th July 2014.
MENU PRINCIPAL. THIS PRESENTATION INCLUDES THE SOURCES OF AIR, THE MAJOR SYSTEM COMPONENTS AND THE WAY THE CONTROLS AND INDICATORS ARE USED TO OPERATE.
94th AMS Annual Meeting - Atlanta, GA
Experience with CST Eigenmode Solver for the LHCb Velo Upgrade Project
Digital readout architecture for Velopix
VIIRS and the Fort McMurray Fire VISIT Satellite Chat (18 May 2016)
GOES Lunar Calibration
Random error, Confidence intervals and P-values
NOAA-20 and Suomi NPP ATMS On-orbit Performance
Status of MODIS and VIIRS Reflective Solar Calibration
S-NPP Visible Infrared Imaging Radiometer Suite (VIIRS) Lunar Calibration using GSICS Implementation of the ROLO model (GIRO) for Reflective Solar Bands.
Lac-Mégantic, Québec Train explosion July 6, 2013
3.4 SILC revision.
Paul Dauncey Imperial College London
Dark Current Experiment Preliminary Design Review
The MPPC Study for the GLD Calorimeter Readout
Presentation transcript:

DNB Cross Talk Review 1 July 2014 Steve Miller (CSU-CIRA) Contributions from William Straka (UW-CIMSS), Curtis Seaman (CSU-CIRA), Lushalan Liao (NGST), Stephanie Weiss (NGST), and Steve Mills (Renaissance Man Eng.)

Overview Raytheon FP13 lab tests suggest cross talk may exist between certain detectors & aggregation modes in the High Gain Stage. Out of specification by up to factor of 3, depending on certain pixel/aggregation mode combinations. Would manifest as possible spurious signal in detectors 1 and 16 (i.e., first and last scan lines of a 16 scan line bundle). In the product paradigm, the cross talk is from detector 9 into 16, and from 8 into 1 (this is flipped from Raytheon charts which are shown in ‘sensor order’.) Options to correct non-compliance: – Accept waiver for use-as-is. No cost impact, no delivery schedule impact – Change require to encompass existing performance as measured for F1 VIIRS NPP and JPSS J1 (requires a corresponding verification documentaion change to TPs, RVP, RVSS, etc.) “Very low” cost impact for req. and verif. document changes, no delivery schedule impact – Redesign DNB Timing Card (FPGA timing) “Low” cost impact, no impact on instrument delivery schedule 3 rd option (timing card) ostensibly benign, but “low cost” is relative and there may be other risks and unanticipated impacts to a redesign Need to establish that the issue is significant enough to warrant Option 3 This document does not constitute an official guidance/recommendation on the waiver request—simply supporting information

FP-13 Testing Cross talk into HGB side in response to HGA side illumination Recipient detectors 1 and 16 (off-diagonal) are the main offenders, although some adjacent detector cross talk is prevalent in HGB (broadening of the diagonal) No cross talk of note in the mid and low gain stages—this is a HG issue

EFR3461 Investigation DNB Module Level using J1 FPA at operating temperature (simulating operation conditions) Note that the cross talk into detectors 1 and 16 are most prominent at Agg Mode 1 (nadir) and nearly negligible at Agg Mode 32 (edge of scan). Timing must be more precise at lower aggregation modes, when more sub-detectors are being combined. Note the significant performance differences between HGA and HGB…nominally the two should be identical HGA and HGB are typically averaged to produce HGS in operations

Courtesy, L. Liao (NGST) Possible sign of spurious cross talk in detectors 1, 16 (Note: instantaneous values may be much higher) Statistics suggest that the effects of the cross talk do exist in the data Difficult to find (uncommon) but may be significant when they do appear. November 2012 HGSdn = 0.5(HGA+HGB)

Possible Cross Talk Occasional spurious signals in the presence of strong gas flares. Adjacent darkening in adjacent lines of same scan angle—sign of possible cross talk. Not seen in cities. Sometimes seen in fires… 7 May UTC Persian Gulf Gas Flares

Provisional Summary Operational data show indications of the cross talk problem. Difficult to identify in DNB imagery. Extreme cases of isolated gas flares may provide examples of worst-case scenarios. Effects not discerned over most anthropogenic light sources (cities, ships, etc.) We continue to search for examples, including possible HGA and HGB exclusive imagery collected during VROP 702 (pending). An Option 3 fix to the DNB timing card may introduce unanticipated risks. There exist other issues (stray light leakage) which may present more pressing issues in terms of DNB performance.