Low Energy RHIC e - Cooling Meeting Minutes – 1/14/15 1 –Magnet Design  During DOE Review there was concern for magnet field quality of LF Solenoids.

Slides:



Advertisements
Similar presentations
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Advertisements

Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
Low Energy RHIC e - Cooling Meeting Notes 1 –LF Solenoids & HF (Matching) Solenoids: Out for bid??? –20 o Dipole  Magnet gap is 4 inches/transport lines.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
Discussion on the magnetic shielding: The magnetic shielding will not be installed until the 2016 shutdown. The magnetic shielding test fixture will be.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
1 Low-energy RHIC electron Cooler (LEReC) cost estimate December 2, 2014.
1 LEReC Funded! From: Fedotov, Alexei Sent: Thursday, May 14, :04 PM Subject: LEReC project approved Dear All, FYI. The LEReC project is now formally.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
July LEReC Review July 2014 Low Energy RHIC electron Cooling (LEReC) Alexei Fedotov LEReC overview: project goal and cooling approach.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
Beam Dynamics in MeRHIC Mike Blaskiewicz On behalf of MeRHIC/eRHIC working group.
1. Beam Line Layout – Cooling Section (CS) Mu Metal shield design – G. Mahler is assembling a mock-up of beam line for field measurements to evaluate.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
ERHIC design status V.Ptitsyn for the eRHIC design team.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
LEReC INSTRUMENTATION DEVELOPMENT T MILLER.
LEReC INSTRUMENTATION DEVELOPMENT T MILLER.
October, 2009 Internal Review Beam Instrumentation David Gassner.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.Funding is available to purchase magnets. 2.Comment during presentation of attached slides: 180.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
A Fedotov, K Hamdi, D Kayran, L Snydstrup, K Smith, J Tuozzolo, A Zaltsman Transport Beam Line Design development of beam line will be from the Booster.
Low Energy RHIC e - Cooling Meeting Minutes – 12/23/ Cooling Section: –LF Solenoids:  At PPM, G. Woods has assigned buyer, SOW will be revised,
July LEReC Review July 2014 Low Energy RHIC electron Cooling Jorg Kewisch, Dmitri Kayran Electron Beam Transport and System specifications.
LEReC. COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu.
FLS2010 Workshop, Stanford, March 1-5, 2010 Florian Loehl (Cornell University) Commissioning of the High Current ERL Injector at Cornell Florian Loehl.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
Interaction Region Design and Detector Integration V.S. Morozov for EIC Study Group at JLAB 2 nd Mini-Workshop on MEIC Interaction Region Design JLab,
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Estimates of required MPS reaction time In the merger (at the centers of respective 20deg dipoles and in between 2 lenses) rms R=250 um In the
LCLS-II Injector layout design and study Feng Zhou 8/19/2015.
Low-Energy RHIC electron Cooling (LEReC) MPS meeting MPS Meeting April 21, 2016.
Beam Line Layout – Cooling Section (to be installed by 1 Dec ember 2015) J. Kewisch wants to move the 20 dipole, yellow (to the right) toward the triplet.
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
SL_THOMSON C. Vaccarezza on behalf of the SL_Thomson team.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
LEReC. COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu.
LEReC Electron beam requirement for cooling Kinetic energy, MeV 1.6
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Low Energy RHIC e - Cooling Meeting Minutes – 12/17/ For the matching energy of electron and ion beams methods for electron energy measurement were.
LEReC System 1. LEReC Injection section 2016 CeC Beam Dump 45°dipole (CeC) Profile Monitor (ERL HE) No SRF Cavity DC e - Gun ERL Solenoid ERL Halo Monitors.
Dmitry Kayran on behalf of LEReC team Brookhaven National Laboratory
Beam Commissioning Adam Bartnik.
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
T980 STATUS AND CHANGES FOR
Have a chance to operate your own beam at CERN
DC Injector and Space Charge Simulation Status
The Cornell High Brightness Injector
Electron Source Configuration
Test of Booster at UITF Reza Kazimi (12/12/18)
Linac Diagnostics Commissioning Experience
Presentation transcript:

Low Energy RHIC e - Cooling Meeting Minutes – 1/14/15 1 –Magnet Design  During DOE Review there was concern for magnet field quality of LF Solenoids. This concern was partially resolved by use of corrector windings. –20 o Dipole  Magnet gap is 4 inches. The 4 inch aperture to be confirmed as either magnet gap or inside vacuum chamber opening.  Inner shield design to be reviewed (approved by Mike Blaskiewicz). –180 o Dipole  Chamber position in magnet is slide-able 6 cm. Dmitry Kayran needs to verify this requirement  Magnet gap is 4 inches (same comment as 20deg dipoles above)  Inner shield design to be determined by Mike Blaskiewicz. –Instrumentation:  During DOE Review there were many questions on the recombination monitors.  Flying wire to be in the merge section between 20 deg dipoles.

Low Energy RHIC e - Cooling Meeting Minutes – 1/14/15 2 Comments on DOE Review of LEReC (See below and on following sheets): –The Resource Loaded Schedule (RLC) needs to be fixed. There are about 10 items, 50% technical and the rest schedule related. DC Gun is part of the project, so it must be integrated into RLC. –There will be another review in July to check the schedule. –Magnet design documentation required (Analysis by W. Meng to be added to archive) –For purchase of long lead items the DOE can influence PPM’s priorities. –Schedule shows instrumentation items to be ordered by 1 February. Check with Toby M. about this date.

Low Energy RHIC e - Cooling Meeting Minutes – 1/7/15 3 –LF Solenoids: SOW and Specification change (D. Passarello) –HF (Matching) Solenoids: Requisition complete; SOW and Spec. change (D. Passarello) (Magnet specifications approved – need documentation) –20 o Dipole  Magnet gap is 4 inches/transport lines 2.5 inches (2.5” RF shielded vacuum valves)  Inner shield design to be approved by Mike Blaskiewicz. –180 o Dipole  Chamber position in magnet is slide-able 6 cm  Magnet gap is 4 inches (same as 20deg dipoles)  Inner shield design to be approved by Mike Blaskiewicz. –Beam Line magnetic shielding: 2.5 milligauss shielding of beam line required (AF).  Per Alexei the shielding of the instrumentation (esp., PM’s and slits) will be difficult. These devices should be kept as near to LF solenoids as possible. –Instrumentation:  BPM’s - small button standard design from MPF (or smaller).  Chuyu Liu simulations for emittance and energy slits and profile monitor to finalize design.  Instrumentation is on the critical path for installation for the Cooling Section.

Low Energy RHIC e - Cooling Meeting Minutes – 1/7/15 4 LEReC DOE Review: We are still in business; but, on the edge.  DOE – schedule is tight early performance will be monitored closely.  Must make the resource loaded schedule (RLS) real and use it.  Need more 2 nd and 3 rd quarter 2015 milestones in RLS.  Need Physics design reviews – they must be in the RLS.  The cooling section requirements most be documented and approved ASAP.  DC Gun most be part of the RLS.  DC Gun cathode changing mechanism most provide 2 weeks operations.  The ERL test goals related to LEReC need to be documented and included in the resource loaded schedule.  SCRF Gun or DC Gun decision milestone in RLS.  PPM performance in the RLS.

Low Energy RHIC e - Cooling Meeting Minutes – 1/7/15 5 LEReC DOE Review: We are still in business; but, on the edge.  surface plot of cooling force (or time) vs. delta and emittance (deadline 15 March?)  - low-energy beam transport in risk register  - KPP has 100 pC but simulations are done with 130 pC - need to have one number only  - have responsibility of CPM stated correctly in PEP  - need 3D simulations, simulations should specify tolerances

Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz SRF cavity 9MHz704 MHz warm cavity 2.1 GHz warm cavity Beam dump 180 deg. bending magnet e-e- e-e- IP2 64 m e-e- DC gun

Low Energy RHIC e - Cooling Cooling Sections 7 2 (matching) solenoids & PS. 2 high field H & V correctors – seperate assemblies(& PS) New: Cooling Sections

Low Energy RHIC e - Cooling Compensating Solenoids DOE Review comments: Field measurements and positioning accuracy specifications. Magnetic shielding measurements. 8

Low Energy RHIC e - Cooling 20 o Dipole Magnet - next 9

Low Energy RHIC e - Cooling 180 o Dipole Magnet Range of motion for magnet core? 10

Low Energy RHIC e - Cooling Vacuum Hardware Large open 180 o vacuum chamber and 20 o chamber - beam impedance concerns shield the electron beam path. Design and order beamline RF shielded bellows. Recombination monitors?? Order RF shielded valves. 11

Low Energy RHIC e - Cooling 12 Beam Dump Line to Vacuum Valve: (4) 20 o dipoles 10 cm aperture

Low Energy RHIC e - Cooling Scope: Cooling Sections 13 Cooling Sections BPM = 16 YAG = 4 Emittance slits = 2 Energy Slits = 2 Recombination Mon = 8 Alignment Laser = 2 Em-SlitYAG Energy Slits Em-Slit YAG BPMs (16) 180 Deg Dipole In from Merger Out to Extraction Blue Ring Au Ion Beam Au Ion Beam Yellow Ring Recombination Monitors (8) YAG Weak Quadurpole for energy spread meas. Alignment Laser

Low Energy RHIC e - Cooling Scope: Cooling Sections from DOE review 14 Cooling Sections BPM = 16 YAG = 4 Emittance slits = 2 Energy Slits = 2 Recombination Mon = 8 Em-SlitYAG Energy Slits Em-Slit YAG BPMs (16) 180 Deg Dipole In from Merger Out to Extraction Blue Ring Au Ion Beam Au Ion Beam Yellow Ring Recombination Monitors (8) YAG

Low Energy RHIC e - Cooling Cooling Sections elements installed in 2015 shutdown (July ‘15 – Jan ‘16) Procurement & Repurpose: High Priority Items 15 Begin Procurement ProcurementLead TimeTestingInstallation Profile MonitorsFeb mo.6 mo.3 wks.Dec Emittance SlitsFeb mo.6 mo.3 wks.Dec Defining SlitsFeb mo.6 mo.3 wks.Dec BPMsFeb mo.4 mo.6 wks.Oct Recomb. Mon. Chamber April 2015 (2 mo. Design) 1 mo.2 mo.3 wks.Sept Moderate Priority High Priority

Low Energy RHIC e - Cooling BPMs in Cooling Section(14 Locations) 16 -Large Dia. BPM Housings -28mm buttons -N-Type feedthrough -MPF Q New Pickup Design: BNL Zync Electronics Design: -VME Form Factor -Use RHIC Controls Infrastructure -Configurable Front End RF Section -39 MHz for Ions -700 MHz for electrons -4 x 400MSPS A/D Converters -2 Planes of Measurement / Board -Integrated Front End Computer -FEC & FPGA on Single Chip (Zynq) -Ethernet Connectivity (x2) -Controls Network -High Speed Interface for Feedback -Test results below at the ATF with 9.3mm buttons showed better than 100um accuracy and 10um precision. Shared Pick-Ups: One dual plan station at each solenoid is shared by two electronics boards, one measuring ions and one measuring electrons. γ= 4.1 Charge/bunch = 100 pC RMS length = 100 ps RMS length = 30 mm γ= 4.1 Ions/bunch = 7.5E8 Charge/bunch = 9.48E-9 C RMS length = 3.2 m Signal Simulations: Simulations were made with the short electron bunches and long ion bunches to determine expected signal amplitudes on the buttons. Ion Beam: 16mV pk-pk Electron Beam: 450mV pk-pk Simulations: Courtesy of Peter Thieberger

Low Energy RHIC e - Cooling Profile Monitors – New designs for Cooling Section 17 High Power profile measurement 2 stations Compact offset cam design 9 μm carbon fiber passes beam only 20 m/s accelerate/coast/decelerate in two rotations PMT detects X ‐ rays generated by the scattered electrons Low Power profile measurement 4 or 6 stations Two Position plunger (similar to ERL Design) 100um thick YAG crystal Impedance matching cage Large cube for 5” beam pipe Same optics as ERL design Photo courtesy of B. Dunham, Cornell Photo courtesy of Radiabeam

Low Energy RHIC e - Cooling Emittance Slit Measurement 18 Low Power Operations Only New Dual axis design for Horizontal & Vertical measurements. Positioned 0.16 – 1 m upstream of profile monitor - Final spacing TBD… Tungsten Slit mask, optimized for beam parameters - Mask 1.5mm thick… # slits & TBD… Dual Station Actuator retrofitted for new dual axis mask. ANALYSIS: An algorithm was developed for analyzing the image from a multi-slit mask for emittance measurement. Future plans are to automate the image analysis for on-line processing and data logging. Image on profile monitor after drift distance Intensity Distribution at mask

Low Energy RHIC e - Cooling Energy Spread Measurements – 2 Locations 19 Max. Energy Spread: Δp/p = <5e-4 Beam Size (d): 1mm (dia.) Double Slit before dipole & drift to YAG May use Quad to increase resolution between cooling sections Considering alternatives: –Dedicated energy spectrometer beam line –Cornell’s method of using deflecting cavity Image of YAG as projected onto CCD 2MP CCD: 1292 h X 964 v px Pitch YAG = proj-H CCD /px v = 29μm/px σ δ = ηδ = 1.5m(5x10 -4 ) = 750μmσ δ = 2Rδ = 2(0.35m)(5x10 -4 ) = 350μm Before Cooling Sections σ δ = 750μm Resolution = σ δ / Pitch YAG 750μm / 29μm/px = 25 px  4% Resolution Between Cooling Sections σ δ = 350μm Resolution = σ δ / Pitch YAG 350μm / 29μm/px = 25 px  8.3% Resolution

Low Energy RHIC e - Cooling Recombination Monitor: Ion Collection 20 ION (wrong charge) COLLECTION: Lost at predictable location (collimators)? Detector: PMT + Counter ! Lattice simulation predicts lattice aperture acceptance of Au +78 ions ! => Work underway to develop a lattice with dispersive section. Courtesy of Peter Thieberger E-Ion RECOMBINATION: Au +79  Au +78, Expected rate ~5e6 per second Creates ions of wrong charge Generates X-rays in cooling section loss rate ≈ alignment Recombination detector concept showing two ionization detectors mounted in retractable roman pot systems.

Low Energy RHIC e - Cooling Recombination Monitor: Radiative Detector 21 RADIATIVE RECOMBINATION DETECTION: Recombination radiation –10-80keV x rays emitted a shallow forward angle –Scintillators located at in COOLING SECTION Detector –Scintillator + PMT + Counter –=> loss rate ≈ alignment Doppler shifted gold capture K - X - rays for γ = 4.1 Courtesy of Peter Thieberger PMT detector Light guide Air-side Scintillator- Ring clamps around pipe Doppler shifted Shallow forward angle X-ray Emission Expanded section of beam pipe Au +79  +78 Event