LRIT Testing at NOAA/CO-OPS STIWG Oct 2011. CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES CO-OPS operates a DOMSAT system at its two regional.

Slides:



Advertisements
Similar presentations
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Advertisements

ProAssist ® complex assistance services management system Global Assistance & INGENIUM Praha.
First Year Ph.D. Presentation Daniel Fitton Exploring the Design and Use of Messaging and Context Sharing with Situated Displays.
Skyward Disaster Recovery Options
DADDS DCS LRIT Prototype LRIT Latency Results Presented by Microcom Design, Inc. May 2014.
Spacecraft Constellation GOES-12 scheduled for de-commissioning in Dec 2013 –GOES-12 still supporting South American mission –GOES-12 DCS is turned on.
NOAA COMMAND AND DATA ACQUISITION STATION
Software to Manage EEP Vegetation Plot Data A design proposal Michael Lee January 31, 2011.
1 ITC242 – Introduction to Data Communications Week 12 Topic 18 Chapter 19 Network Management.
Deployment Options Frank Bergmann
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility.
A Feature-Based Analysis & Comparison of IT Automation Tools: Comparing Kaseya to Developed By: & Advisor : Dr. S. Masoud Sadjadi School of Computing and.
AIIM Presentation Selecting and Implementing A Records Management System June 5, 2008.
1 GOES DCS Status and Information Dan Schwitalla – th Meeting of the STIWG– 18 – 20 May 2009.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers  DCS Help Desk at or 7451 – 24 Hours/ 7 Days a Week  Al McMath at (757)
November 2009 Network Disaster Recovery October 2014.
Data Communications and Networking
ISIGN IMS Proximity Marketing Solution (IMS) iSIGN Media Corp Sales 1ATTRACT. TRANSACT. MEASURE.
Overview Print and Document Services Print Management console Printer properties Troubleshooting.
Solution Overview for NIPDEC- CDAP July 15, 2005.
Component 10 – Fundamentals of Workflow Process Analysis and Redesign Unit 10 – Process Change Implementation and Evaluation This material was developed.
Software Quality Assurance Lecture #8 By: Faraz Ahmed.
New roles in Technology Migration issues – Rule of PO 2.7(b)1.
VistA Imaging: An Update on IHS Activity and Directions Mark Carroll, MD; Janis Sollenbarger.
L ow R ate I nformation T ransmission Product Suite Satellite Direct Readout Conference for the Americas in Miami, Florida December 9-13, Charles.
SRS PRESENTATION Ronen Mendezitsky & Alon Weiss Website Protection System.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or 7451 Contact Phil Whaley at (757) or Al McMath at.
Enterprise PI - How do I manage all of this? Robert Raesemann J Jacksonville, FL.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Identifying Application Impacts on Network Design Designing and Supporting Computer.
LRGS Enhancements for LRIT NOAA TWG Meeting May 12, 2011 Sutron Corporation Davis Drive, Sterling VA Tel: (703)
An Integration Framework for Sensor Networks and Data Stream Management Systems.
Tuesday, October 06, 2015 Santos Rodriguez NWS EMWIN HRIT/EMWIN.
X-Road – Estonian Interoperability Platform
Utilities, Customers & SMS Rudi Leitner. Who in this room has a mobile phone? Who in this room has ever sent a text (SMS) message?
Kay Metcalf NOAA GOES DCS Program Manager Office of Satellite Data Processing and Distribution NOAA’s Satellite and Information Service GOES DCS: NOAA.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Identifying Application Impacts on Network Design Designing and Supporting.
The Namibia Flood Dashboard Satellite Acquisition and Data Availability through the Namibia Flood Dashboard Matt Handy NASA Goddard Space Flight Center.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or is with copies to
Computer Networks with Internet Technology William Stallings
Dan Grady The search for the killer productivity application is over… Copyright 2009, Information Builders. Slide 1.
A Proposal to Update LRIT to Provide Reliable Rebroadcast Tool for GOES DCS Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 12,
Basic component of Network Management Woraphon Lilakiatsakun.
2 DCS MANAGEMENT ACTIVITIES UPDATES ON ALL OUR ONGOING PROJECTS OTHER INFORMATION HELPFUL TO USERS ALL ITEMS MAY BE CONSIDERED WORKS IN PROGRESS QUESTIONS.
Dec07-02: Prototype Parking Meter Phase 8 Bret Schuring: Team Leader Pooja Ramesh: Communications Wilson Kwong, Matt Swanson, Alex Wernli.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers  DCS Help Desk at or 7451  Contact Phil Whaley at (757) or Al McMath.
Server to Server Communication Redis as an enabler Orion Free
LRIT Project Status Update STIWG/TWG, Boise, ID Mark Bushnell NOAA/NOS/CO-OPS May 02, 2012 Definitions LRIT – Low Rate Information Transmission LRGS –
NETWORKING COMPONENTS Buddy Steele Assignment 3, Part 1 CECS-5460: Summer 2014.
OAIS Rathachai Chawuthai Information Management CSIM / AIT Issued document 1.0.
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) MAY 19, 2009.
Module 9 Planning and Implementing Monitoring and Maintenance.
Component 4: Introduction to Information and Computer Science Unit 7: Networks & Networking Lecture 1 This material was developed by Oregon Health & Science.
1 Object-Oriented Analysis and Design with the Unified Process Figure 13-1 Implementation discipline activities.
Library Online Resource Analysis (LORA) System Introduction Electronic information resources and databases have become an essential part of library collections.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
DCP Command Status Oct DCP Command Update Phase 2 SBIR completed in June Successful Tests conducted on both GOES East and GOES 14 Satellites.
DADDS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 6, 2014.
Risk and Precautions needed when installing hardware - P2
ESPC CIP Update November 7, COPC Action Item  NESDIS is currently in the process of reviewing and planning upgrades for the critical infrastructure.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or 7451 Contact Phil Whaley at (757) or Al McMath at.
GOES-R Product Distribution Logistics Before and After Handover Kathryn Miretzky GOES-R User Services Coordinator Product Readiness and Operations (PRO)
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) DECEMBER 5, 2008.
Gorilla: A Fast, Scalable, In-Memory Time Series Database
SPS Spotlight Series October 2014
Principles of Information Systems Eighth Edition
HIGHLIGHTS 2 ARGOS satellites decommissioned (NOAA 12 and 14)
GOES DCS Customer Interaction/Access Training
Prepared by Peter Boško, Luxembourg June 2012
Point 6. Eurostat plans for Time Use Survey data processing and dissemination Working Group on Time Use Surveys 10 April 2013.
Presentation transcript:

LRIT Testing at NOAA/CO-OPS STIWG Oct 2011

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES CO-OPS operates a DOMSAT system at its two regional offices (Seattle WA and Chesapeake VA) Each Systems stores up to 6 months of data. Data from these systems are used for: CO-OPS data bases in Silver Spring MD Testing of systems before deployment Testing of installed systems( new deployments and troubleshooting) Open to other users Data base queries the system every two minutes. CO-OPS installed a LRIT system at the Chesapeake office June 2011 and a system in Seattle in September 2011 Both LRIT system are working but not accessible to outside connections

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Compare DOMSAT to LRIT DOMSAT LRIT Latency Minimal. DCP messages are Several seconds may be added as sent individually as they arrive messages are aggregated into files and depending on the priority scheme by NOAA Footprint Continental US GOES East and West footprint. If you can transmit to GOES you should be able to receive LRIT data Content DCS data DCS data, GOES images, EMWIN Hardware 1.8 m dish, limited receiver 1.2 m dish, receivers from vendors number of vendors Software LRGS (sutron) For DCS LRGS (sutron) For GOES images provided by the receiver vendor Cost Equipment $ 25k $ 25k (Fully installed by Vendor) Usage ~ 75k ( shared ) Free

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Cons Increased data latency Double single point of failure Unknown outage rate Additional data hops/nodes Pros NOAA supported product No cost Hemispheric coverage Multiple products Small dish receiver LRIT Pros and Cons

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Test Plan Phase 1 - LRIT Data Primary Tests Use existing capabilities to conduct tests, few resources. Objectives The objective of these tests are to: a) familiarize personnel with the new LRIT systems, b) conduct a cursory inspection of the data stream, which will also be used to assist with refinement of subsequent testing, c) initialize the test documentation process, d) provide initial assurance that system configuration is nominal and data streams are ready for Phase 2 testing, e) determine and document changes required to CO-OPS’ data ingestion and processing standards. Requirements As mentioned above, these simple tests require DOMSAT and LRIT receivers that are not supplemented by data accessed via the internet. Personnel already tasked with system acceptance and inspection, and others as directed, can conduct these tests without substantial development of test tools. The tests can be conducted using data sets that already exist or can be readily created. Test Descriptions Test 1A – Select several PIDS and search for all expected data over several days Test 1B – Compare Domsat and LRIT like files to see that file sizes are similar Test 1C – Compare LRIT file creation time stamps with DADDS reception time stamps Test 1D – Spot check comparisons of Chesapeake LRIT and Seattle LRIT data sets.

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Phase 2 - LRIT Data Integrity and Latency Tests The tests described for Phase 2 will require dedicated resources to develop test tools. As the utilities are developed to inspect data dropouts, longer outages, and data latencies, they will be considered for further development to be used operationally as real-time monitoring tools. Objectives Create tests and generate results that can be used to evaluate the reliability and timeliness of LRIT in comparison to DOMSAT. Requirements Database management and evaluation tools that can calculate latency statistics for groups of PIDS. Test Descriptions 2A – Quantify data latency for some/many/all? CO-OPS PIDS. Look for latency patterns that correlate with time of transmission. 2B – Identify and quantify data gaps and compare to DOMSAT

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Phase 3 - LRIT System Stress Tests These tests may require new development but many can be carried out with existing resources. They are designed to determine how robust the LRIT system is in the face typical, extreme, and outlandish situations so that system expectations can be better understood. Objectives Phase 3 objectives are to attempt to determine the limits of LRIT and contrast them to those of DOMSAT. Requirements Phase 3 will use the tools created to Phase 2 to evaluate the anomalous conditions either created or fortuitously encountered. Test Descriptions 3A – Rain fade 3B – Physical obstruction of antenna – step ladders, birds, 3C – Antenna misalignment sensitivity 3D – Local RF interference – introduce common RF sources in the vicinity of the antenna

CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Results So Far Limited, Contract expired June. New contract awarded end of September. Testing will start by the end of October FAILURE 2011/05/15-20:20:12 LritRecv:3 Timed out -- No data received in more than 120 sec. FAILURE 2011/05/15-20:21:13 LrgsMain:1 LRGS Timeout: No data in 180 seconds. INFO 2011/05/16-02:48:14 LritRecv File D:\Dartcom\Data\XRIT\Raw\pL B.dcs failed checkLength, not completed