EPA’s Stormwater Rulemaking: How Potential Changes in the NPDES Stormwater Regulations Could Impact the Design of Stormwater Controls Rachel Herbert USEPA/OW/OWM/WPD.

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
SW101 Municipal Separate Storm Sewer Systems (MS4s)
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
Stormwater Rulemaking Briefing US Environmental Protection Agency.
EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
1 Effluent Guidelines for Construction Greg Davis USEPA
A State’s Perspective of the EPA’s Effluent Limitations Guidelines 40 CFR Part 450 Jeffrey B. Shaver, PE, CPESC AASHTO Subcommittee On Design July 27,
What is NPDES? “National Pollutant Discharge Elimination System”
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Update on Stormwater Regulation
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Upper Providence Township Stormwater Management MS4 Program.
Slide 1 EPA Stormwater & Water Regulations: Local Impacts & Balancing Power 2011 Congressional City Conference.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
When It Rains, It Drains An Overview of the Hempfield Township’s New Storm Water Management Program.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Env 247 Overview of Stormwater Management March 1, 2011.
SLIDE 1 Sustainable Stormwater Management May 6, 2015 Blue Highways: Transportation and Stormwater Management in Virginia Ginny Snead, PE Richmond Office.
Pretreatment, Pollution Prevention and Storm Water Committee California’s Storm Water Program Bruce A. Fujimoto State Water Resources Control Board February.
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
RIPDES Storm Water Program: Large and Small Construction.
 Why are we here?  Without regulations, rivers used to catch fire. Rules and Regulation.
Developing Final Phase II WIPs and Milestones Katherine Antos Chesapeake Bay Program Office Jenny Molloy Water Protection Division DC Draft Phase II WIP.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Putting the “LID” on Water Pollution New Water Quality Requirements for Land Use County of Orange Mary Anne Skorpanich Richard Boon.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Module 1: Stormwater Permit Program Robert Pitt Department of Civil and Environmental Engineering University of Alabama Tuscaloosa, AL.
City of Puyallup Planning Commission Presentation February 8, 2012.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
WOOLPERT Managing NPDES Phase II Requirements on a County-Wide Basis Jared Livingston.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
MS4 Remand Rule Intergovernmental Associations Briefing September 15, 2015.
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
Construction Stormwater Rules-2012 Rodney Hendrick, Ph. D. Louisiana Urban Stormwater Coalition.
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
Stormwater Control & Design
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
MS4 Permit Updates May 9, 2014 Jay Hoskins, P.E. Metropolitan St. Louis Sewer District.
Stormwater and C.3 Overview Tom Dalziel, Assistant Manager Contra Costa Clean Water Program.
Stormwater Regulations NC Division Of Water Quality DPPEA Technical Sharing Session May 25, 2004.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Phase II National Storm Water Regulations What’s in it for you?
Storm Water Permitting Commission on the Future of Virginia’s Environment August 27, 2001 Department of Environmental Quality.
An Overview of our Community’s Stormwater Management Program
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Public Workshop: RIPDES Draft Phase II Storm Water Regulations RI Department of Environmental Management RIPDES Storm Water Program July 25, 2001 Contacts:
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
0 Montana Department of Environmental Quality Permitting and Compliance Division Water Protection Bureau Water Quality Discharge Permits Section Storm.
Legislative Overview  This quick module outlines in more detail the background of the legal requirements.
 The Illinois Environmental Protection Act is silent with regard to storm water.  Illinois EPA’s authority to deal with storm water derives from delegated.
Northern Virginia Regional Commission MS4 Workgroup March 17, 2011.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
MS4 Permit – Meaning, History, and Annual Report Results Watershed Partners 4/13/
City of Clarksville Storm Water Management Manual Revisions 2014.
Urban Runoff Pollution Ordinance 2017 Proposed Update
MS4 & Construction Storm Water Permits
Municipal Separate Storm Sewer System (MS4) Permit
Stormwater Management and MS4 Compliance
Supervisor, RIDEM RIPDES Permitting Program
Summit County MS4.
EPA Public Meeting Dallas, Texas May 10, 2005
John Tinger U.S. EPA Region IX
MS4 = Municipal Separated Storm Sewer System
Presentation transcript:

EPA’s Stormwater Rulemaking: How Potential Changes in the NPDES Stormwater Regulations Could Impact the Design of Stormwater Controls Rachel Herbert USEPA/OW/OWM/WPD for AASHTO Subcommittee on Design Meeting

Purpose of Today’s Discussion Construction & Development Effluent Limitation Guidelines New Stormwater Regulations

Overview of Construction & Development Effluent Limitation Guideline (C&D ELG) General Overview of Requirements Erosion & Sedimentation Requirements Sampling Requirements Other Requirements

General C&D ELG Requirements EPA promulgated new regulations for construction and development (C&D) sites on December 1, New rule requires all construction sites subject to permits to implement erosion and sediment controls and pollution prevention measures Phase-in requirement for sites to sample stormwater discharges and comply with a numeric effluent limitation (NEL) of 280 nephelometric turbidity units (NTU). Beginning August 1, 2011 sites disturbing 20+ acres at once Beginning February 2, 2014 sites disturbing 10 acres at once Requirements must be incorporated into state permits (general or individual) whenever permits are re-issued EPA intends to issue a new CGP in June 2011

Erosion and Sedimentation Requirements Control stormwater volume and velocity within the site to minimize soil erosion; Control stormwater discharges to minimize erosion at outlets and downstream channel and streambank erosion; Minimize the amount of soil exposed during construction activity; Minimize the disturbance of steep slopes; Design, install and maintain erosion and sediment controls considering factors such as precipitation and soil characteristics; Provide and maintain natural buffers around surface waters, direct stormwater to vegetated areas to increase sediment removal and maximize stormwater infiltration, unless infeasible; and Minimize soil compaction and, unless infeasible, preserve topsoil.

Sampling Requirements 280 NTU Limitation does not apply on days with precipitation exceeds the local 2-year, 24-hour storm event Monitoring frequency is up to the permitting authority, but EPA recommends at least 3 grab samples per day at each discharge point EPA has not specified any analytical methods, but envisions that use of a properly calibrated field turbidity meter is adequate For linear projects, permitting authority can consider representative sampling instead of sampling at each discharge point Even if permitting authority allows representative sampling, all discharge points are still subject to compliance with effluent limitation Permitting authority will specify data reporting requirements

Other Requirements Soil Stabilization & Dewatering Requirements Initiate stabilization of disturbed areas immediately whenever any clearing, grading, excavating or other earth disturbing activities have permanently ceased, when earth disturbing activities have temporarily ceased and will not resume for a period exceeding 14 calendar days. Where vegetative stabilization is infeasible, alternative stabilization measures must be employed. Pollution Prevention Requirements Prohibited Discharges

Overview of New Rulemaking Background on the Federal Stormwater Program Stormwater Challenges The National Research Council (NRC) Report EPA has initiated a rulemaking to improve its stormwater program. Stormwater Rulemaking Schedule Preliminary Considerations for Rulemaking

Federal Stormwater Regulations Phase IPhase II Year Finalized Regulated Entities Medium & large MS4sSmall MS4s in an “urbanized area” (UA) 10 categories of industrial operations Additional designated MS4s outside of UAs Active construction sites of 5 acres or more Active construction sites disturbing between 1 and 5 acres

Federal Stormwater Regulations (cont’d) Phase IPhase II MS4 Stormwater Management Program (SWMP) Requirements MS4 must develop and implement a SWMP to: find and eliminate illicit discharges control discharges from its system by addressing discharges from active construction sites, new development and redevelopment, and industrial activities MS4 must develop and implement a SWMP that includes 6 minimum measures: Public education & outreach Public participation/ involvement Illicit discharge detection & elimination Construction site runoff control Post-Construction site runoff control Pollution prevention/ good housekeeping

Federal Stormwater Regulations (cont’d) Phase IPhase II Stormwater Pollution Prevention Plan (SWPPP) Requirements Construction & industrial stormwater dischargers must develop and implement a SWPPP N/A

Stormwater Challenges Urban stormwater is the primary source of water quality impairment:  13% of all rivers and streams  18% of all lakes  32% of all estuaries Much progress has been made; however, significant challenges remain to protect waterbodies from impact of stormwater discharges

The National Research Council (NRC) Report In 2006 EPA commissioned the National Research Council (NRC) to study EPA’s stormwater program In October 2008 NRC released Urban Stormwater Management in the United States, available at: Key Findings Current approach is unlikely to produce an accurate picture of the problem and unlikely to adequately control stormwater’s contribution to waterbody impairment Requirements leave a great deal of discretion to dischargers to set their own standards and ensure compliance, which results in inconsistency across the nation Poor accountability and uncertain effectiveness

Key Recommendations in the NRC Report “A straightforward way to regulate stormwater contributions to waterbody impairment would be to use flow or a surrogate, like impervious cover, as a measure of stormwater loading ….” “Efforts to reduce stormwater flow will automatically achieve reductions in pollutant loading. Moreover, flow is itself responsible for additional erosion and sedimentation that adversely impacts surface water quality.” “Stormwater control measures that harvest, infiltrate, and evapotranspirate stormwater are critical to reducing the volume and pollutant loading of small storms.” US Department of Transportation Headquarters Washington, DC Turkeyville, MI Rest Area 722

Stormwater Rulemaking Schedule Primary impetus: to protect waterbodies from the stormwater impact of urbanization Completed Activities: October 30, 2009: Federal Register (FR) Notice announcing EPA’s intent to distribute questionnaires (Information Collection Request (ICR) seeking data to inform the rulemaking from three groups: Owners, operators, developers, and contractors of developed sites Owners of Municipal Separate Storm Sewer Systems (MS4s) States and territories January – March 2010: Listening Sessions input on preliminary rulemaking considerations (FR Notice published Dec. 28, 2009) May 2010: EPA published a final FR ICR Notice

Stormwater Rulemaking Schedule (Cont’d) Upcoming Activities: Summer 2010: EPA expects to distribute the questionnaires Late 2011: EPA expects to propose a rule to be published in the FR for public comment Late 2012: EPA expects to take final action

Preliminary Considerations for Rulemaking 1. Expand the universe of regulated discharges beyond urbanized area 2. Establish substantive post-construction requirements for new and redevelopment 3. Develop a single set of consistent requirements for all MS4s, in place of existing “Phase I” and “Phase II” rules 4. Address stormwater discharges from existing development through retrofitting 5. Consider additional requirements to further reduce stormwater impacts in the Chesapeake Bay NOTE: No decisions have been made on any of the items discussed from this slide forward.

1. Expand the universe of regulated discharges beyond urbanized area: Depiction of Current MS4 Roadway Regulation Area B (not a regulated MS4) Area C (regulated MS4) Area A (regulated MS4) Regulated MS4 area Key NOTE: Disturbances of ≥ 1 acre are required to comply with NPDES construction requirements, even If outside the urbanized area.

1. Expand the universe of regulated discharges beyond urbanized area What is the best way to expand the universe of regulated discharges beyond Urbanized Area? Is there an appropriate boundary for permit coverage if not based on the current definition of Urbanized Area? What criteria could be used to identify areas? Should States decide the areas to include?

2. Establish substantive post-construction requirements for new and redevelopment Develop a standard that promotes sustainable practices that mimic natural processes to infiltrate and recharge, evapotranspire, and/or harvest and reuse precipitation. Should there be a national requirement for on-site stormwater controls such that post development hydrology must mimic pre-development hydrology on a site-specific basis? Options for meeting the requirement could be: on-site retention of specific sized storm, limits on amount of effective impervious area, use of site-specific calculators to determine predevelopment hydrology, and/or use of regional standards to reflect local circumstances. Options if standard could not be met: off-site mitigation, payment in lieu, others? Should the standards be different for new development vs. redevelopment?

3. Develop a single set of consistent requirements for all regulated MS4s Many Phase I & II MS4s address issues that are similar, but the regulatory requirements are different. Should DOTs have different requirements than traditional MS4s? What requirements should EPA apply to DOTs? Should EPA apply all of the 6 minimum measures to DOTs? Are there other measures that would achieve better water quality, like more emphasis on source control? Phase I MS4s are required to implement a program to control discharges from industrial facilities. Should this requirement be extended to all MS4s?

4. Addressing stormwater discharges from existing development Stormwater discharges from developed areas are significant contributors to water quality impairments; some MS4 permits require retrofit practices that infiltrate or retain stormwater. Should EPA consider retrofit requirements, such as: Development of a retrofit plan? Implementation of a retrofit plan? Should any requirements apply only to large MS4s? Should any requirements apply only to water quality impaired waters?

5. Consider additional requirements to further reduce stormwater impacts in the Chesapeake Bay What additional requirements should EPA consider to protect the Chesapeake Bay? Buffer requirements? Additional requirements on active construction? Further extending area of coverage? Should these provisions be applied to other sensitive areas?

Contact Rachel Herbert