1 August 14, 2003 Blackout MAC Meeting October 8, 2003 Paul Murphy IMO.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
U.S./CANADA Power Outage Task Force n Generator trips n :05:44 Conesville 5 [375 MW] n :14:04 Greenwood 1 [785 MW] n :31:34 Eastlake.
Transmission Transporting Electricity by Wire Darcy Neigum Montana-Dakota Utilities Co.
NERC Compliance An NWP Perspective
IMO Perspective on Reliability A presentation to the IEEE Toronto Section Forum on Reliable Power Grids in Canada by Dan Rochester, Section Head - Assessments.
August 14, 2003 Blackout Final Report
Hurricane Isaac X X X ◘ Isaac began as a tropical wave on August 16 th off the coast of Africa & was classified as a tropical storm on August 21 st ◘
REN-Rede Eléctrica Nacional,S.A. Can the California and New York crisis occur in Europe ? Rui Pestana IST - 25th October 2003.
1539pk 2003 MAJOR POWER GRID BLACKOUTS IN NORTH AMERICA AND EUROPE Copyright © P. Kundur This material should not be used without the author's consent.
Recent ERCOT Events Lessons Learned
DRA Advocacy Joe Como, Acting Director. 2 DRA Facts The Voice of Consumers, Making a Difference! 3  History: CPUC created DRA (formerly known as the.
1 Demand Response Implementing Demand Response and AMR / AMI Systems used by the Electric Cooperatives of Arkansas by Forest Kessinger Manager, Rates and.
ERCOT’S COMPLIANCE ASSESSMENT PROGRAM Mark Henry Compliance Manager March 23, 2005.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
Review of Power Blackout on Telecom P. J
1 Blackout 2003 See:
August 14 th NE Blackout and Common Roots of Blackouts Damir Novosel, PhD President KEMA Inc., T&D Consulting BLACKOUT AMERICANO E ITALIANO:
Averting Disaster - Grid Reliability Issues and Standards National Energy Restructuring Conference April 1, 2004 Washington, DC.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Purpose A crisis communication plan coordinates the communication within the organization, as well as between the organization and the media and the public.
Recommendations from 2011 Southwest Outage Heather Polzin, FERC Office of Enforcement Dave Nevius, Senior Vice President, NERC Member Representatives Committee.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
Colorado Springs Utilities Environmental Services Functional Assessment Presentation for the American Public Power Association’s 2001 Engineering & Operations.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
1 Energy Assurance Guidelines for States Miles Keogh, NARUC David Terry, Stateline Energy April 2007.
FERC’s New Reliability Initiatives Kevin Kelly Director, Policy Analysis, OMTR Federal Energy Regulatory Commission NARUC Annual Meeting Nashville, TN.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
Overview of WECC and Regulatory Structure
Mandatory Electric Reliability Standards and Transmission Expansion Suedeen G. Kelly Commissioner Federal Energy Regulatory Commission The Canadian Institute.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Wind & Transmission: The Clean Energy Superhighway Mark Lauby Manager, Reliability Assessments, NERC.
1 RIC 2009 Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation George Wilson NRR/ADES/DE/EEEB March 11, 2009.
SM April Peak Week Operations Review Presentation to ISO Business Issues Committee May 22, 2002.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
Earthquake Response and Recovery Planning at a Major Canadian Electric Utility Presented by Doug McLeod Disaster Preparedness Coordinator BC Hydro British.
THE 2005 CERT ENERGY ROUNDTABLE Ontario’s Electricity Sector: The Hybrid Model Takes Shape By: Ron Clark May 31, 2005.
Key Terms Business Continuity Plan (BCP) – A comprehensive written plan to maintain or resume business in the event of a disruption Critical Process –
What Is an Incident? An incident is an occurrence, caused by either human or natural phenomena, that requires response actions to prevent or minimize.
Moving Forward Overview of the 2003 Blackout. Overview Power system restored within 30 hours Conservation efforts avoided rolling blackouts once power.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
ECC Task Force Webinar September 3, Peak Anti-Trust Statement Phase 1A Update webSAS Integration PSE Access Peak and the Task Force Next Steps.
Operating Topics Part 2 Mike Oatts May 9, 2008 Transmission Customer Forum Destin, Florida Part 2 Mike Oatts May 9, 2008 Transmission Customer Forum Destin,
Smart Grid Schneider Electric Javier Orellana
1 MOSC Presentation Grid Collapse 2003 September 22/2004 Information is preliminary subject to ongoing investigations Certain material is from NERC and.
NERC Lessons Learned Summary LLs Published in December 2015.
Impacts and Actions Resulting from the August 14, 2003 Blackout Minnesota Power Systems Conference November 2, 2003.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
MOSC Meeting Operations Market Manual updates October 22, 2003 Presented by:Ron Falsetti Steve Cooper.
Reliability and the Market Place Perfect Together The Transition from NERC to NAERO Baltics Working Group June 6, 2001 Princeton, NJ The Transition from.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
Utilizing Your Business Continuity Plan.
“FRCC RESTORATION PLAN (BLACKOUT & BLACK START)” - TRAINING -
Black Start Overview.
Ensuring Security of Supply in Estonian Transmission Grid
ISO New England System R&D Needs
Pacific Power Seismic Preparedness Update
Cold Snap Task Force Update
Impacts and Actions Resulting from the August 14, 2003 Blackout
Wind & Transmission: The Clean Energy Superhighway
Presentation transcript:

1 August 14, 2003 Blackout MAC Meeting October 8, 2003 Paul Murphy IMO

2  Thursday, August 14, 2003 at approximately 04:11 PM EDT  Northeastern United States and portions of Canada lost major portions of load, generation and transmission  Effects felt throughout the Eastern Interconnection centered around the Great Lakes  Approximately 61, 800 MW of customer load was lost affecting 50 million people. The Event

3 The Interconnections

4 4:10:00 – 4:10:38 PM Transmission Lines Disconnect across Michigan and Northern Ohio, Generation Trips Off Line in Northern Michigan and Northern Ohio, and Northern Ohio Separates from Pennsylvania Remaining paths into eastern Michigan ONTARIO 17

5 Summary of the Situation at 4:10:38

6 Interface flows 3:10:38 PM EST

7 4:10:42 – 4:10:45 PM Transmission Paths Disconnect in Northern Ontario and New Jersey, Isolating the Northeast Portion of the Eastern Interconnection (North of Lake Superior) 30 ONTARIO

8 4:10:50 – 4:11:57 PM Ontario Separates from New York West of Niagara Falls and West of St. Lawrence. Southwestern Connecticut Separates from New York and Blacks Out ONTARIO 35

9 Unstable Island remains Beginning of collapse Quickly reduces to ~ 1200 MW

10

11 Restoration Plan Priorities  Restore Class IV AC power to all nuclear sites  Restore power to critical transmission and generating station, station service loads  Restore critical utility owned telecom facilities  Restore customer loads only to the extent necessary to control voltages and secure generating units  Synchronize islands together and/or to adjacent power systems

12

13 Complexities of the Restoration Process Equipment Problems Communications Balancing generation/load and maintaining frequency and voltage Using load to control high voltage during the line restoration process Assessing available generation to support restoration Post Contingency conditions

14

15 Nine Days of Emergency Operations  Over the week, assessment of insufficient internal and external generation to meet the normal Ontario demand  August 14 Provincial Government declares a Provincial Emergency  August 17 Government requests industrial, commercial and residential customers to reduce load by 50% over peak hours.  Reliable supply maintained at reduced demand level due to:  Customer response to requests for curtailment and conservation  dispatch of emergency generators  emergency purchases from Ontario’s neighbours

16 Nine Days of Emergency Operations Aug-03 1:00 14-Aug-03 13:00 15-Aug-03 1:00 15-Aug-03 13:00 16-Aug-03 1:00 16-Aug-03 13:00 17-Aug-03 1:00 17-Aug-03 13:00 18-Aug-03 1:00 18-Aug-03 13:00 19-Aug-03 1:00 19-Aug-03 13:00 20-Aug-03 1:00 20-Aug-03 13:00 21-Aug-03 1:00 21-Aug-03 13:00 22-Aug-03 1:00 22-Aug-03 13:00 Demand (MW) Normal Forecast ActualEstimated Demand Response

17 Observations System Restoration and Crisis Management Processes > Equipment protections operated as designed > Public telephone system was generally available  Efficient and effective assignment of accountabilities within the control room  Good cooperation from field staff of generators and transmitters, distributors and customers  Good cooperation with neighbouring area operators  Successful restoration plan Large-scale restoration is inherently complex, and our control room staff adapted to changing circumstances as the restoration proceeded, modifying approaches as necessary to achieve objectives. The overall restoration and crisis management processes proceeded in an orderly fashion and met their objectives.

18 A Communications Centre was set up to brief media on status of system restoration in Ontario and to provide information as to how customers could assist in the restoration effort. Press conferences, scheduled twice daily, were coordinated with Provincial officials. Provincial government officials were continuously briefed on power restoration to ensure coordination with other government agencies. Communication Centre / Provincial Decision Support

19 1.We confirmed that the devices that are in place to protect equipment operated as planned 2.We confirmed that maintaining a well-documented restoration plan, supported by training and rehearsals involving the IMO, market participants and government, was and will continue to be a key investment 3.We confirmed that close cooperation amongst the IMO, the interconnections, and Ontario Transmitters, Generators, market participants and government is essential to achieving an orderly restoration. Early Lessons Learned

20 4.Effective communications is essential to reliable operation. 5.The extreme speed at which events can cascade across the system increases the significance of timely information. 6. Frequent communication with customers is critical to support their decision making 7. Administered pricing rules need review Early Lessons Learned

21 1. Maintain and enhance the integration of systems and markets through robust interconnections with our neighbours Prevention of Future Incidents 2. Reliability standards for the interconnected North American grid should be mandatory. 3.The industry should build on the strong institutional and regulatory foundations already in place 4. The industry should continue to pursue the three part strategy of Prevention, Containment and Minimization of Impact :

22 Ongoing Review Internationally: –Canada-U.S. Joint Task Force Within Ontario: –Emergency Preparedness Task Force’s (EPTF) Restoration Working Group –Compliance Assessment

23 Canada-U.S. Joint Task Force 3 Working Groups to develop recommendations –Electricity –Nuclear –Security IMO is supporting Electricity and Security WGs, through NERC and directly with Joint Task Force –Electricity - sequence of events, event simulation, standards, operations, and planning –Security - physical and cyber security review

24 The Ongoing Investigation

25 Restoration Working Group Restoration Working Group (RWG) established by the EPTF Sep 22 Goal: To improve our level of preparedness Objectives: Review the facts regarding the restoration of the IMO- controlled grid Assess the effectiveness of our restoration efforts Identify findings and recommend improvements

26 RWG Areas of Interest Rules and procedures –restoration priorities –rotational load shedding –curtailment requests Auxiliary equipment and tools Generator re-start Voice communications Class IV to nuclear Focus on items essential to restoring the grid and the supply to consumers (by Nov 26)

27 Compliance Examine Compliance With Market Rules: –NPCC criteria –Ontario Power System Restoration Plan –Communication Requirements –Technical Performance Requirements

28 Thanks to all of you for aiding in a successful restoration of the IMO Controlled Grid and restoring supply to Ontario consumers