Skyline Heights City of Corona Scoping Meeting March 4, 2014.

Slides:



Advertisements
Similar presentations
Public Scoping Meeting December 3, 2012
Advertisements

Scoping Meeting Yuba Goldfields 200-Year Flood Protection Project Environmental Impact Report June 23, 2014.
City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
Planning Commission, City of Brisbane Public Hearing for the Sierra Point Biotech Project November 29, 2007 SIERRA POINT BIOTECH PROJECT.
Sacramento Local Agency Formation Commission (LAFCo) Draft Environmental Impact Report SMUD Amendment of the Sphere of Influence and SMUD Yolo Annexation.
Final Program Environmental Impact Report Gillespie Field Development Council January 17, 2012 Item #5.
PUBLIC SCOPING MEETING Draft Environmental Impact Report for the SEWER AUTHORITY MID-COASTSIDE (SAM) WET WEATHER FLOW MANAGEMENT PROJECT August 28, 2007.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
PORTOLA CENTER AREA PLAN LAKE FOREST PLANNING COMMISSION WORKSHOP May 23, 2013.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
Planning & Community Development Department 245 South Los Robles Avenue Predevelopment Plan Review City Council December 8, 2014.
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
City of La Habra Heights CEQA Scoping Meeting Matrix Oil Field Redevelopment Project Environmental Impact Report April 16, 2014.
Master Plan Update Chapter 213 of the Local Government Code provides that Cities may engage in Comprehensive Planning which may:  include but not be limited.
Planning & Community Development Department Predevelopment Plan Review for Art Center College of Design Master Plan City Council June 8, 2015.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
Draft Equine Ordinance POD
WEST OAKLAND SPECIFIC PLAN (WOSP) & DRAFT ENVIRONMENTAL IMPACT REPORT Update to WOSP Steering / Technical Advisory Committees April 3,
David Rizk, DirectorKevin Colin Development Services DepartmentLamphier-Gregory, EIR Consultant South Hayward BART/Mission Blvd Form-Based Code Draft Supplemental.
Planning & Community Development Department 1336 and 1347 East Colorado Blvd. Pre Development Plan Review City Council Meeting January 28, 2013.
Planning and Community Development General Plan EIR: Preliminary Alternatives City Council February 10, 2014.
Big Sandy Rancheria Band of Western Mono Indians Casino and Resort Project Draft EIS Public Hearing Wednesday, February 2, p.m. – 9 p.m. Foothill.
Uniform Rules Update Revised Draft EIR Environmental Comment Hearing Revised Cumulative Impact Analysis 04EIR-08 SCH# County of Santa Barbara.
CA Regional Water Quality Control Board San Diego Region CEQA SCOPING MEETING: TENTATIVE CLEANUP AND ABATMEMENT ORDER (CAO) NO. R January 21,
Winery Ordinance Update Scoping Meeting for the Environmental Impact Report County of Santa Barbara July 16, 2014.
Planning & Community Development Department Conditional Use Permit #5029 and Other Land Use Entitlements: Final Environmental Impact Report and Statement.
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
Planning Commission, City of Brisbane Public Hearing for the Sierra Point Biotech Project December 13, 2007 SIERRA POINT BIOTECH PROJECT.
Solar Energy Research Center Project CEQA Public Scoping Meeting May 26, 2010.
City Council Meeting December 15, 2015 Planning Division File No. CUP
White Hill Middle School Initial Study/Mitigated Negative Declaration Ross Valley School District Community Meeting November 1, 2011.
Durham Villas Planned Unit Development TSM & REZ Morris Bud Keeney Butte County Board of Supervisors December 11, 2012.
APPEAL OF MCGUIRE RESIDENCES Tuesday, January28, 2014 City Council.
Prepared by: Alex Fisch Planning Services Division.
City and County of San Francisco Scoping Meeting Environmental Impact Report (EIR) PURPOSE To solicit participation in determining the scope.
LAND Subdivie a 4.27 acres into 18 lots 17 detached single family homes One duplex Base density allows for unit Affordable housing bonus.
Regional and Local Land Use Planning Office of Planning and Research December 7, 2015.
4650 Alhambra Circle Building Site Separation. Request: The applicant is requesting consideration of a building site separation in accordance with Section.
General Plan Update ITEM NO. 5 Final Draft Planning Commission Hearing - June 23, 2015 Project Manager: So Kim, Senior Planner.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
Scoping Meeting August 25, 2010 Project Description, and California Environmental Quality Act (CEQA), Overview.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Small Town Service ~ Community Stewardship ~ Future Focus ALBRIGHT OFFICE PARK Planned Development PD Architecture and Site S Environmental.
Environmental Scoping Meeting April 9, Meeting Outline Overview of the Proposed Project Purpose of the Scoping Meeting Environmental Review Process.
LAKE FOREST SPORTS PARK SCOPING MEETING JUNE 23, 2009.
Planning & Community Development Department Contract to provide Environmental Consulting Services for the Rehabilitation and Reuse of the Pasadena YWCA.
Works of Art: Redeveloping Properties for Cultural Reuse Harvester Artspace Lofts Council Bluffs, Iowa Tina Hochwender – City of Council Bluffs.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
City of Oceanside Melrose Drive Extension Public Scoping Meeting March 13, p.m.
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
1828 Ocean Ave & 1921 Ocean Front Walk PUBLIC SCOPING MEETING
253 South Los Robles Avenue Predevelopment Plan Review
Scoping Meeting April 20th 6:00 pm
Overview of the Draft EIR
Providence Saint John’s Health Center Phase II Project
CFT Gateway Center ( E. Foothill Blvd
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Facebook Campus Expansion Project EIR
City of Los Angeles Department of Public Works Bureau of Engineering
Overview What is the CEQA environmental review process?
83 North Lake Avenue Predevelopment Plan Review
South San Gabriel Boulevard Pacific Square SG Scoping Meeting Case Planner: Tracy Steinkruger, Planning Manager.
Fifth Standard Solar Project Complex
City of Los Angeles Department of Public Works Bureau of Engineering
Butte County Board of Supervisors September 27, 2016
Vista Verde Residential Project Environmental Impact Report Public Scoping Meeting May 19, 2010 Michael Brandman Associates.
City Council Meeting April 23, 2018
Brackish Water Desalination Project Draft EIR
Draft Equine Ordinance
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

Skyline Heights City of Corona Scoping Meeting March 4, 2014

Skyline Heights Introductions Jason Moquin, Senior Planner, City of Corona Role: City Project Manager/Point of Contact David A. Crook, AICP, Principal Planner, PCR Services Corporation Role: City’s Environmental Impact Report (EIR) Consultant Jason will welcome community. Introduce both speakers and explain each role in project. Also point out that project applicant and engineer are also present in case specific questions come up that City/Dudek can’t answer.

Skyline Heights Overview of Scoping Meeting/Process Overview of the Project CEQA (California Environmental Quality Act). Timeline We are here to LISTEN! Jason will explain that meeting purpose is two-fold – provide info about project to interested public and provide an opportunity for the City to hear public’s concerns, questions and requests for topics to be studied in the EIR. Feel free to interrupt to ask questions, provide comments. We’ll keep informal. Remind folks to sign in (if they haven’t already) and wish to be contacted about future project milestones.

Skyline Heights Project Area Jason will go over the project area and orient audience – possibly point out school or other landmarks community members will recognize in case they are not “aerially oriented.”

Skyline Heights Overview of the Project Applications Annexation 421.25 acres General Plan Amendment Designate 384 acres as LDR and 37 acres as Open Space Change of Zone Pre-zone the project site 270.91 acres – R-1-7.2 (Single Family Residential. Minimum Lot Size 7,200 square feet). 113.56 acres – Agriculture 36.73 acres –Open Space Jason will explain that meeting purpose is two-fold – provide info about project to interested public and provide an opportunity for the City to hear public’s concerns, questions and requests for topics to be studied in the EIR. Feel free to interrupt to ask questions, provide comments. We’ll keep informal. Remind folks to sign in (if they haven’t already) and wish to be contacted about future project milestones.

Skyline Heights Overview of the Project Tentative Tract Map Subdivide 270.91 acres into 292 lots Lot Sizes Range from 7,242 to 31,010 Sq. Ft. in area Open Space Approximately 149 acres 48 acres of manufactured slopes 101 acres of natural open space Jason will explain that meeting purpose is two-fold – provide info about project to interested public and provide an opportunity for the City to hear public’s concerns, questions and requests for topics to be studied in the EIR. Feel free to interrupt to ask questions, provide comments. We’ll keep informal. Remind folks to sign in (if they haven’t already) and wish to be contacted about future project milestones.

Skyline Heights Proposed Project Jason will go over project site plan, # of units proposed, major features of project such as roadways, tennis courts, graded slopes, anticipated construction timeline, etc. Also will mention types of permits/approvals that would be necessary from the City and rough timeline for the remainder of the planning process.

Skyline Heights CEQA Overview CEQA Process Overview CEQA Timeline Notice of Preparation (30-day comment period): February 4, 2013 – March 5, 2014 (extended to March 10th) Public Scoping Meeting: March 4, 2014 Draft EIR Public Review (45 day comment period): early July 2014 – mid/late August 2014 Preparation of Final EIR: late August 2014 Planning Commission Meeting: September 2014 City Council Meeting: October 2014 Sarah will explain state law that City implements and gives public, (both direct members such as present in meeting and City Council as public representatives), opportunity to fully understand potential environmental impacts of project. Go through timeline.

Skyline Heights Environmental Topics of Study BEFORE AFTER Aesthetics – visual simulations Agricultural & Forestry Resources Air Quality – traffic, global climate change Biological Resources – direct and indirect impacts Cultural and Paleontological Resources – direct and indirect impacts Geology and Soils Greehouse Gas Emissions Hazards and Hazardous Materials Sarah will go through each topic, very high level, field questions. Will include a picture of a visual simulation and some photos of relevant biological resources (wetlands, least Bell’s vireo) BEFORE AFTER

Skyline Heights Environmental Topics of Study (continued) Hydrology/Water Quality Land Use Noise – construction, post-construction Population and Housing Public Services Traffic, Circulation Utilities Cumulative Impacts and Alternative Sarah will go through each topic, very high level, field questions. Will describe which intersections are being studied. Will include a picture of Santa Ana Mtns., city street/car. Will explain the concept of cumulative impacts and the type of alternatives that will be studied.

Skyline Heights Closing Questions? Comments? Your Contact Information – please sign in City Contact Information: Jason Moquin, City of Corona Community Development Department 400 South Vicentia Avenue Corona, California 92882 Phone: 951-736-2268 Fax: 951-279-3550 Email: Jason.Moquin@ci.corona.ca.us Jason will explain that Sarah and Jason will be available to discuss individual questions, comments, concerns, discuss in the context of boards set up around the room. Remind people to sing in so we have ability to send out future correspondence, project updates.