Allan Darling Deputy Director, NCEP Central Operations NOAA NWS NCEP

Slides:



Advertisements
Similar presentations
Chapter 8: Capacity Building Presented by Co Chair Mr. John Briceño CCAD Central American Countries 11/29/2003.
Advertisements

Allan Darling Deputy Director, NCEP Central Operations NOAA NWS NCEP
Pre-Decisional National Weather Service Central Processing and Dissemination Portfolio Partners Meeting Overview Ben Kyger: Central Processing Portfolio.
WG-CSAB Updates Fall 2014 COPC Meeting (NSOF, Suitland, MD) Nov 4-5, 2014 Dave McCarren WG-CSAB Chair.
Update to COPC 4 – 5 November 2014 Dave McCarren, NUOPC DPM.
Working Group for Consolidated Communications Management (JAG-CCM) Update Spring CSAB 2008 Mr. Charles Abel AFWA JAG Representative.
COPC/JAG-CCM Status Updates and Recommendations 16 November 2010 Chris Finnigsmier Acting JAG/CCM Chair.
Committee for Operational Processing Centers (COPC) Update NOPC Program Council Meeting 13 June 2012 (OFCM – Silver Spring, MD) Dave McCarren WG-CSAB Chair.
Joint Action Group for Operational Community Modeling (JAG/OCM) update Fall COPC 2010 Mr. Evan Kuchera JAG/OCM Chair.
WG-CSAB Update Fall 2010 COPC Meeting (AFWA – Offutt AFB) Allan Darling WG-CSAB Chair.
1 COPC Shared-Network Infrastructure Brief Prepared for: COPC Working Group for Cooperative Support and Backup (WG/CSAB) October 21 and 22, 2008 Meetings.
ESDA Discussion Spring 2015 COPC Meeting (NCEP, College Park, MD) May 27-28, 2015 Lamar Russell WG-CSAB Chair.
On-Time Product Delivery COPC - HPCC Best Practices March 2011 Allan Darling Deputy Director NCEP Central Operations Where America’s Climate, Weather,
WG-CSAB Updates Spring 2015 COPC Meeting (NCEP, College Park, MD) May 27-28, 2015 Lamar Russell WG-CSAB Chair.
Change Advisory Board COIN v1.ppt Change Advisory Board ITIL COIN June 20, 2007.
April 2, 2013 Longitudinal Data system Governance: Status Report Alan Phillips Deputy Director, Fiscal Affairs, Budgeting and IT Illinois Board of Higher.
1 Global Ensemble Strategy Presented By: Yuejian Zhu (NWS/NCEP) Contributors: EMC staff.
1 NOAA’s Environmental Modeling Plan Stephen Lord Ants Leetmaa November 2004.
Working Group for Cooperative Support and Backup (WG-CSAB) Update Fall COPC 2007 John Zapotocny CSAB Chair.
1 Report of Inclusion of FNMOC Ensemble into NAEFS S. Lord (NCEP/EMC) Andre Methot (MSC) Yuejian Zhu, and Zoltan Toth (NOAA) Acknowledgements Bo Cui (EMC),
Portfolio Committee Presentation Government printing Works Audit and Compliance 07 May 2013 Presented by: Chief Executive Officer.
1 Draft COPC/CSAB JAG-CCM Status Updates and Recommendations September 15, 2009 JAG-CCM Team version
AWIPS-II Data Delivery Project Overview December 2013.
1 Addressing Critical Skills Shortages at the NWS Environmental Modeling Center S. Lord and EMC Staff OFCM Workshop 23 April 2009.
OFCM UAS Mini-Workshop 04 February 2011 IWG-Facilities & Infrastructure (IWG-FI), Task Force on Unmanned Systems (TFUS) Overview Co-Chairs, Dr. Reginald.
JAG/CCM Update COPC Spring 2006 Mr. Walter Coley JAG/CCM Chairman Distribution Authorized to U.S. Government Agencies and their Contractors only.
1 NUOPC National Unified Operational Prediction Capability 1 Review Committee for Operational Processing Centers National Unified Operational Prediction.
Joint Action Group for Operational Community Modeling (JAG/OCM) update Spring COPC 2010 Mr. Evan Kuchera JAG/OCM Chair.
1 Precipitation verification Precipitation verification is still in a testing stage due to the lack of station observation data in some regions
JAG/ODAA Fall 2008 James Vermeulen & Jon Whiteside JAG-ODAA Co-Chairs Recommend NCEP's Bradley Ballish replace Jon Whiteside (term completed)
Joint Action Group for Operational Community Modeling (JAG/OCM) Update Spring 2015 COPC Meeting (NCEP, College Park, MD) May 27-28, 2015 Lamar Russell.
WG-CSAB Update Fall 2010 COPC Meeting (FNMOC – Monterey, CA) Allan Darling WG-CSAB Chair.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Air Force Weather Agency FTP Replacement Briefing 08 Sep 06.
WG-CSAB Update Fall 2009 COPC Meeting Allan Darling WG-CSAB Chair.
1 COPC/CSAB JAG-CCM Status Updates and Recommendations October 21, 2009 JAG-CCM Team version
Working Group for Consolidated Communications Management (JAG-CCM) Update Fall COPC 2007 Mr. Walter Coley JAG Chairman.
JAG/ODAA Spring 2009 COPC Co-Chairs Satellite: Mr. James Vermeulen, FNMOC Conventional: Dr. Bradley Ballish, NCEP Secretary: Mr. Tony Ramirez, OFCM.
RECAPITALIZING THE NATION’S WEATHER PREDICTION CAPABILITY National Unified Operational Prediction Capability (NUOPC)
Update on Dropout Team Work and Related COPC Action Items Presented by Dr. Bradley Ballish Co-Chair JAG/ODAA and Member of Dropout Team 5 May 2010 COPC.
1 Seasonal to Interannual multi-model approach Presented By: Jin Huang (NWS/NCEP/CTB) Contributors: Yuejian Zhu (NWS/NCEP/EMC)
Slides for NUOPC ESPC NAEFS ESMF. A NOAA, Navy, Air Force strategic partnership to improve the Nation’s weather forecast capability Vision – a national.
1 COPC JAG-CCM Status Updates and Recommendations May 4, 2010 JAG-CCM Team version
1 COPC/CSAB JAG-CCM Status Updates and Recommendations April 7, 2010 JAG-CCM Team version
National Centers for Environmental Prediction: COPC Data Distribution Systems – IDP & NWSTG Michelle Mainelli Deputy Director, NCEP Central Operations.
October 9, 2012 Commercial Operations Subcommittee RMS Update Kathy Scott RMS Vice Chair.
1 NUOPC National Unified Operational Prediction Capability Update to COPC 4 – 5 Nov 2015 Dave McCarren, NUOPC DPM.
1 Joint Action Group for Operational Community Modeling Dr. Nelson Seaman JAG/OCM Chair Fall COPC 2008 AFWA, Omaha, NB 13 November 2008.
WG-CSAB Updates Spring 2013 COPC Meeting (FNMOC, Monterey, California) November 20-21, 2013 Dave McCarren WG-CSAB Chair.
1 COPC/CSAB JAG-CCM Status Updates and Recommendations Prepared for: CSAB Spring Meeting April 15, 2009 By: CCM Team version
WG-CSAB Updates Fall 2015 COPC Meeting (Offutt AFB, Omaha, NE) November 4-5, 2015 Lamar Russell WG-CSAB Chair.
August 25, 2008 TPTF Nodal Status Report: Integrated Schedule Update Change Control Update Adam Martinez Troy Anderson.
Architecture Task AR Status Presented to the July Meeting of the GEO and Architecture and Data Committee Dr. Thomas C. Adang AR Point.
1 Texas Data Transport & MarkeTrak Systems (TDTMS) Update to RMS February 2, 2016 Jim Lee (AEP) – Chair Monica Jones (NRG) – Vice Chair.
The Implementation Process1 / 8NPSR, December 8, 2015 Revising the Implementation Process Looking Forward, setting the stage for the panel discussion Hendrik.
Evolving the NCEP Production Suite Dr. William M. Lapenta Director, National Centers for Environmental Prediction NOAA/National Weather Service NCEP Production.
ESPC CIP Update November 7, COPC Action Item  NESDIS is currently in the process of reviewing and planning upgrades for the critical infrastructure.
WG-CSAB Update Fall 2008 CDR Mark Moran, NOAA WG-CSAB Acting Chair.
COPC Action Item : The COPC/CSAB shall work with the NUOPC Deputy PM to develop a proposed structure for the working relationship between NUOPC.
Update on Dropout Team Work and Related COPC Action Items Bradley Ballish NOAA/NWS/NCEP/PMB Co-Chair JAG/ODAA April 2009 CSAB Meeting.
COPC Status Briefing on National Unified Operational Prediction Capability (NUOPC) Fred Toepfer 15 November 2007.
1 Status Briefing on National Unified Operational Prediction Capability (NUOPC) Fred Toepfer, NUOPC PM May 29, 2008 NUOPC.
ISIS Project Status Report May 18, 2006 Prepared by MAXIMUS, Inc Education Systems Division for the ABT Committee.
PLANNING FOR A NOAA SCIENCE CENTER June 28, 2000.
TIER IT Inventory CITI Meeting November 6,
Disaster Recovery Management By: Chris Rozic COSC 481.
Joint Action Group for Operational Community Modeling (JAG/OCM) update Spring CSAB 2011 Mr. Evan Kuchera JAG/OCM Chair.
WG-CSAB Update Fall 2009 COPC Meeting Allan Darling WG-CSAB Chair.
WG-CSAB Update Spring 2010 COPC Meeting Allan Darling WG-CSAB Chair.
2011 Prioritization Update to Market Subcommittees
Reliability Assessment Committee Proposal TSS Meeting
Presentation transcript:

Allan Darling Deputy Director, NCEP Central Operations NOAA NWS NCEP

NUOPC IOC-1 / NAEFS PM: Fred Toepfer Objective G Key Issues/Risks/Mitigation Risk: Schedule has slipped due to effect of required maintenance on availability of development system. Completion of external evaluation the week of 20 December pushes project completion to the first possible post-holiday implementation date of 11 January Mitigation: None Schedule Requirement: Combine the NOAA and Navy ensemble members as the National Ensemble. Combine this National Ensemble and the CMC ensemble in the NAEFS. With the addition of FNMOC, increase NAEFS members from 126 to 166, forecasts to 16 days, and standardize variables. Goal: Enhance the multi-model ensemble system to produce bias corrected ensemble variables and probabilistic products for use by the Operational Centers. Resources November 10, 2010 FNMOC Dr. M. Sestak Mr. J. Ertl NWS Telecommunication Operations Center Mr. R. Bunge NCEP Environmental Modeling Center Dr. W. Lapenta Mr. Y. Zhu NCEP Central Operations Mr. A. Darling Mr. D. Starosta Ms. R. Cosgrove Ms. M. Mainelli G Y Y Implementation slip from 22 Dec to 11 Jan

3 NUOPC IOC – Task Status DATMS-U upgrade (JAG/CCM) - Complete Infrastructure augmentation (TOC) - Complete Ensemble delivery (FNMOC) - Complete GRIB2 384H 72 variables New file structure for communication and processing efficiency Routine delivery (FNMOC, TOC, NCEP) - Complete Ensemble integration (NCEP, FNMOC) - Complete Transition to operations (NCEP) – In process

NUOPC IOC – Planned Implementation Adding FNMOC ensemble to NAEFS FNMOC 20+(1) members, out to 16 days, twice per day Bias correction based on its FNMOC analysis Four variables to include NCEP, CMC and FNMOC ensembles 2 meter temperature 10 meter zonal wind 10 meter meridional wind 850mb temperature Expected Benefits Multi-model, multi-center ensembles Improve the forecast skill for near surface variable Continued evaluation of the benefits derived from the addition of the FNMOC ensemble data is required Scope change may be required if pre-implementation testing reveals negative impact on skill for any of the four variables listed above

5 NUOPC – Next Steps Develop UEO Implementation and Management Plan Dissemination requirements month work plan Backup requirements Development coordination Rationalize NUOPC and NAEFS requirements Establish NUOPC / NAEFS coordination process Potential supporting infrastructure upgrades FNMOC interface system upgrades Next Generation COPC Enterprise Network (AI )

Action Item – Management Agreement COPC Action Item : Develop and submit to COPC for approval a Unified Multi-Model Ensemble Operations annex to the DAPE MOA to address NAEFS and/or NUOPC operations management, alignment of performance requirements, change management, and data dissemination. Priority: H Advocate: WG/CSAB, JAG/OCM, and JAG/CCM Suspense: October 2010 CSAB is evaluating whether an appendix to the DAPE MOA is appropriate or if a new MOA is required to accomplish this agreement. Management details regarding performance and alignment with change are still under evaluation. CSAB recommends this action be kept open. 6