1 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 International Co-operation FP7 Energy Theme Energy EU-Russia Call European.

Slides:



Advertisements
Similar presentations
European Commission DG Research Co-operative Research Training Session on Ifigeneia Pottaki Research & SMEs DG Research - European Commission Training.
Advertisements

European Commission DG Research SMcL Brussels SME-NCP 23 October 2002 THE 6th FRAMEWORK PROGRAMME Economic & Technological Intelligence S. McLaughlin.
SMEs in the. SMEs in FP7 - why? SMEs are at the core of European industry and key players in the innovation system. SMEs have to respond increasingly.
Stefano Fontana European Commission DG RTD Research for the benefit of SMEs SMEs in the.
University of Trieste PHD school in Nanotechnology Writing a proposal … with particular attention to FP7 Maurizio Fermeglia.
Anthea Fabri Horizon 2020 National NCP Coordinator
Funding Schemes. Legal and Financial Rules in the 7th Framework Programme PHOENIX Training Laulasmaa, 1 Sept 2007.
IRINA KUKLINA, RICHARD BURGER BRUSSELS, 25 NOVEMBER 2014 CO-FUNDING MECHANISMS OF RUSSIAN-EUROPEAN S&T COOPERATION.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
Not legally binding FP7 Rules for Participation and Grant agreement FP7 Helpdesk 
FP7 Regler för deltagande 18 december 2006 Monica Hjertman, Enheten för Europaprogrammen, VINNOVA
1 Energy Info Day FP7-ENERGY th December 2007 NOT LEGALLY BINDING Bruno Schmitz, DG RTD European Commission Introduction to 2008 RTD Energy Calls.
Capitalising the full potential of online-collaboration for SME innovation support Horizon 2020 call Innosup (Participant Portal code: H2020-INNOSUP )
Provisional draft The ICT Theme in FP7 Submission and Evaluation (preliminary information) ICT-NCP Information Day 19 th October 2006.
Horizontal Research Activities involving SMEs Joachim Ball, European Commission, DG RTD B3 n Co-operative Research n Collective Research General Introduction.
“ERA-NET” 24 April Cooperation and coordination of national or regional research and innovation activities (i.e. programmes) FP6 Launch Conference.
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
FP7 Grant Agreement and its parts Moldova – Research Horizon 30 January 2013 Kristin Kraav.
Ministry of Education and Religious Affairs General Secretariat for Research and Technology EEA Financial Mechanism Research within Priority.
Rules for Participation and Dissemination And Model Grant Agreement
BASED ON A PRESENTATION MADE BY IRINA KUKLINA & RICHARD BURGER BRUSSELS, 25 NOVEMBER 2014 CO-FUNDING MECHANISMS OF RUSSIAN-EUROPEAN S&T COOPERATION.
APRE Agency for the Promotion of European Research Lifecycle of an FP 7 project Caterina Buonocore Riga, 13th September, 2007.
Legal & Financial Issues
BiophotonicsPlus Photonic appliances for life sciences and health Transnational call for proposals 2012.
Katarina Lenova, 4 February 2014 H RULES FOR PARTICIPATION AND FINANCIAL RULES.
Ljubljana, Slovenia 2 March Rules for participation Carmen Madrigal Legal aspects European Commission - Research DG « FP7 Challenges to thirve the.
Basic principles of FP7 Grant Agreement Financial management and reporting.
Technology Strategy Board Driving Innovation Participation in Framework Programme 7 Octavio Pernas, UK NCP for Health (Industry) 11 th April 2012.
Dr. Margaretha Mazura (EMF) ICT Day Opportunities to participate in EU ICT research projects San José, 16 February 2010 Principles of EU Research Funding.
Megan Richards RTD FP6 Kick Off Meeting Priority 7 and 8 11 November 2004 Sixth Framework Programme MANAGING FP6 CONTRACTS.
Dr. Marion Tobler, NCP Environment Evaluation Criteria and Procedure.
Josefina Lindblom European Commission DG Research - Unit T4: SMEs SMEs in the.
EU Funding opportunities : Rights, Equality and Citizenship Programme Justice Programme Jose Ortega European Commission DG Justice.
Provisional FP-ICT InfoDay, Torino, 11/12/ The ICT Theme in FP7 How to submit a proposal 1. The Rules of the Programme.
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
Contracts FP6. PRESENTATION OUTLINE è Legal Framework è Participation è Contract Structure è Collective Approach l signature and entry into force l collective.
Seventh Framework Programme Theme 1 - Health Ph D.Olguta Iordache Health - NCP.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
European Commission - DG Research - Directorate B – “Structuring the European Research Area” Jean-David MALO – Bucharest, February 12-13, NOT LEGALLY.
Danish Agricultural Advisory Service National Centre Possibilities and limits in a Specific Support Action By Erik Fog and Michael Tersbøl, DAAS European.
Malta Council for Science and Technology Practicalities Health and Food, Agriculture, Fisheries & Biotechnology – Information Session 25 th September 2008.
Overview of the IST Priority Information Package National Contact Points 23rd Oct 2002 Tom McKinlay: IST Operations.
Information session first joint ERANID call (Task 5 DOW) Belgian Science Policy Office 30 September 2015.
1 7 th Research Framework Programme Rules for the Participation.
Participation and dissemination Rules and Contracts FP6.
Proposals and projects in FP7 On-line Information Day Brussels/Budapest 22nd January 2007.
Project Management Birutė Markevičiūtė Joint Technical Secretariat Lead Partner Seminar 13 October 2008, Riga.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
 the creation of an "internal market" in research (free movement of knowledge, researchers and technology)  the restructuring of the European research.
Research and Innovation Research and Innovation Fast Track to Innovation 1.
Jörg Niehoff European Commission DG Research - Unit T4: SMEs SMEs in the.
ERANETMED Joint Activities, particularly the 1st Joint Call ERANETMED is funded by the European Commission’s 7th Framework Programme ERANETMED multi-tasks.
Consumers, Health, Agriculture and Food Executive Agency 3rd Health Programme The Electronic Submission System (JA 2015) Georgios MARGETIDIS.
NCP Training Brussels, May 2016 European Commission, DG CONNECT Software & Services, Cloud Computing H2020 EU-Brazil Coordinated.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
HORIZON 2020 Launch Conference 16 January 2014, Kyiv, Ukraine.
Participation and dissemination Rules
Strengthening the foundations of ERA
Funding schema to support public/private initiatives
GREECE-ALBANIA IPA CROSS BORDER COOPERATION PROGRAMME
International Co-operation Concrete opportunities
European Environment Agency
FP7 SCIENTIFIC NEGOTIATIONS Astrid Kaemena European Commission
Preparatory Action 2011 European Voluntary Humanitarian Aid Corps Call for proposal
Session 2 : Submission and Selection procedures
Helene Skikos DG Education and Culture
European Innovation Platform for Knowledge Intensive Services Elke Van Tendeloo DG Enterprise and Industry Brussels, 04 June 2007.
TOP6 – WP4 Coordination and Management JPICH Coordination Office
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
Presentation transcript:

1 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 International Co-operation FP7 Energy Theme Energy EU-Russia Call European Commission DG Research Gilles Lequeux Tel: +32/2/

2 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007  Date of publication: 30 November 2007  Deadline: 26 February 2008  Indicative budget: 4 M€ (EC contribution)  Topic ENERGY : Enhancing strategic international cooperation with Russia in the field of power generation from biomass  Topic ENERGY : Innovative operational and monitoring tools for large power systems  All specific arrangements for this particular Call will be set out in the relevant Guide for Applicants Call Information

3 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 Content/scope: Research and technology development in the field of power generation from biomass. The co-operation activity should be based on an assessment of ongoing research, the identification of best practices, gaps in knowledge and barriers to implementation in both, the EU and Russia, and propose direction for a collaborative research project in the area. Funding scheme: Collaborative Project (the project duration is normally 3 years) Expected impact: Effective cooperation between key researchers and industries in the field of power generation from biomass should foster the development and uptake of innovative methods and technologies to expand the use of biomass in power generation. Enhancing strategic international cooperation with Russia in the field of power generation from biomass

4 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 Innovative operational and monitoring tools for large power systems Content/scope: Development and validation of new of innovative operational and monitoring software tools and hardware equipment for large power systems. Funding scheme: Collaborative Project (the project duration is normally 3 years) Expected impact: The possible future interconnection between the Pan-European and Russian electricity transmission system would be greatly simplified if common/compatible software tools, hardware equipment and operational procedures are adopted by all Transmission System Operators involved. The joint development of these tools and equipments will promote their adoption.

5 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007  In addition to the European Commission funding of 4 M€, the Russian Federal Agency for Science & Innovation (FASI) agreed to dedicate a similar total budget of 4 M€ to fund the Russian participants.  Two projects will be funded (one per topic).  Collaborative Projects under this call shall have a maximum requested EC contribution of 2 M€. This is an eligibility criterion – proposals above this limit will not be evaluated. Funding

6 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007  The Russian participants will be funded by FASI up to 2 M€ per project according to the Russian rules.  The other participants will be funded by the EC up to 2 M€ per project according to the forms of grant and maximum reimbursement rates applied under the FP7 rules. Funding

7 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 FP7 Funding rules Collaborative Project R&D Activities: - EU grant up to 50% of the total eligible cost. - Certain legal entities can receive up to 75% (non-profit public bodies, Small and Medium Size Enterprises / SMEs, higher education establishments). Demonstration Activities: - the reimbursement rate may reach 50% of the total eligible cost. Other activities (consortium management, networking, training, coordination, dissemination etc. ) - the reimbursement can be up to 100% of the eligible cost.

8 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007  The EC may contribute to the funding of the total eligible costs of the Russian participants not covered by FASI that can represent a maximum of 5% (indicative amount: max €) of their total eligible costs.  e.g. costs for coordination, management, translation, visits  Assess impact on financial reporting obligations  Financial provisions are not applicable to third countries participants with no EC contribution (no financial audit neither control, etc…)  Participants with EC contribution < € don’t need to provide finance statement certificates Funding

9 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 Funding Funding distribution Topic 2.2.1Topic 7.2.1Total EC (FP7) Funding Up to 2 M€ Up to 4 M€ FASI Funding Up to 2 M€ Up to 4 M€ Total funding (EC + FASI) Up to 4 M€ Up to 8 M€

10 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007  According to the FP7 rules, the minimum number of participants in each project proposal is 3 from different EU Member States or Associated Countries  In order to ensure a balance between participants a minimum number of two participants established in Russia is requested in each project proposal. This is an eligibility criterion. Participants

11 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007  Two calls will be announced, one by the EC (FP7) and one by FASI.  All EU-RU project consortia have to submit their proposals to the FP7 Energy EU-Russia Call according to the FP7 submission procedure.  The description of the work packages in the project proposal shall clearly link Eu and RU researchers and emphasise the integration of research activities.  The Russian participants in each project have to submit their corresponding Russian proposal (in Russian) to the Russian Call to be launched by FASI according to the Russian rules. Implementation

12 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007  The Russian Call will have a submission deadline later than the EU-Russia Call*.  The Russian participants are advised to submit the corresponding Russian proposals at the same time or as soon as possible after the overall proposal has been submitted by the EU coordinator to the EC.  Only projects submitted to both the FP7 Energy EU-Russia Call and to the Russian Call will be considered for funding. (*): The Russian call will be launched at the end of Januray 2008 ( Implementation

13 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 The proposals submitted to the FP7 Energy EU- Russia Call will be evaluated within the peer- review evaluation system of the EC and following the rules and criteria of FP7 (see Annex 2 of the WP 2008) Russian evaluators will participate in the EC evaluation. A single stage procedure will be followed Evaluation

14 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 S&T quality (concept, objectives, methodology) – min. 3/5 Implementation (consortium, management, resources) – min. 3/5 Impact (in relation to ‘expected impact’ statements) – min. 3/5 Overall THRESHOLD: 10/15 Evaluation Criteria and Thresholds

15 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 The corresponding Russian proposals will be evaluated by the Russian Federal Agency for Science & Innovations according to its procedures. EU evaluators will participate in the RU evaluation. Only proposals which have passed both the EC evaluation and the Russian evaluation may be funded. This an additional selection criteria. Evaluation

16 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 On the EU side, the European coordinator of each selected project will negotiate the GA with the EC on behalf of all project participants  All project participants of each selected project shall sign the EU Grant Agreement  Participants in selected project are required to conclude a consortium agreement (IPR, use and disseminate knowledge) Contracts Monitoring and reporting

17 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007  The corresponding Russian participants in each selected projects shall sign a contract with FASI  Ideally, the project starting date in both the EU GA and the RU contract should be identical.  The EC reporting requirements should cover the whole joint research activities according to the FP7 rules. Contracts Monitoring and reporting

18 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007  The corresponding Russian participants in each selected projects shall sign a contract with FASI  Ideally, the project starting date in both the EU GA and the RU contract should be identical.  The EC reporting requirements should cover the whole joint research activities according to the FP7 rules. Contracts Monitoring and reporting

19 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 Submission of a Joint proposal to FP7 Energy EU- Russia Call according to FP7 rules Integrated activities Min. 2 RU participants Min. 3 MS or AS participants Corresponding Russian part in the joint project Joint technical Annex FASI Budget: Max.2M€ Submission of tender to the Russian Call according to FASI rules JOINT RESEARCH PROJECT Evaluation according RU rules EC Evaluation according FP7 rules EC Budget: Max. 2M€ RU participant s sign a contract with FASI All participants sign the EU FP7 GA < 5% of TEC EU-RU concerted dialogue Call principles

20 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 Indicative Time Table EURussia Launch of the EC Call 30 November 2007 Launch of the RU Call End January 2008 Submission deadline EU Call26 February 2008 Submission Deadline RU Call End of April 2008 Completion of EU evaluation Beginning April 2008 Completion of RU evaluation Mid May 2008 End of EU negotiationsMid July 2008 Signature of EC GABy September 2008 Signature of RU contracts By Mid June 2008 Start of projects Ideally starting at the same time around Mid June – beginning July 2008

21 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 –Gilles Lequeux International Cooperation Officer European Commission – DG Research Tel.(+32 2) –Richard Burger Science & Technology Councellor Delegation of the European Commission to Russia Tel.(+7 495) , , Contact points for information on the Russian Call: –Liudmila Orletskaya International Programs and Projects Director Federal Agency for Science and Innovations of the Russian Federation Tel:(+7 495) Contact Points

22 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 Some advices  A pre-proposal check is offered (deadline 26 January 2008)  Get in touch with the contact points and/or your NCP  Look at the EU “List of Projects”  Be aware that drafting a proposal and establishing the right consortium including appropriate Russian partners takes time, particularly as coordinator  Read carefully the Call, the WP and the Guide for applicants (topic, funding scheme, number of participants, size of project, etc.) Cordis Web Site Address

23 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 Directorate-General for Research Directorate K - Energy