THEMIS FDMO Review Management Topics − 1 October 5, 2004 Management Topics Manfred Bester.

Slides:



Advertisements
Similar presentations
NASA’s Goddard Space Flight Center LRO SRR Project Management.
Advertisements

2014 Workshop on Spacecraft Flight Software 1 Pasadena, CA, December 16-18, 2014 ICON End-To-End Operations Philosophy Will Marchant, Manfred Bester, Carl.
Solar-B FPP 1 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS The TRACE Model for Operations Ted Tarbell
GLAST LAT Project ISOC 5/17/2004 – Seth Digel1 ISOC Lessons Learned RFA09 Issue –No writeup on lessons learned from visits to other instrument/mission.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
National Aeronautics and Space Administration Commercial Crew Initiative Overview and Status to the COMSTAC Philip McAlister NASA Exploration Systems Mission.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
JPL Autonomous Space Mission Simulation Flight Team Bob Hoffman Josh Ruggiero Adam Nikolic Dusty Terrill.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
THEMIS FRRSC - 1 KSC, Feb 12, 2007 SPACECRAFT OVERVIEW/STATUS Peter R Harvey THEMIS Project Manager.
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
MRRIMAGE IMAGE MRR 2/14/00RJB/1 Ground System Readiness Richard Burley NASA/GSFC/ (Fax )
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
THEMIS FDMO CDR Peer Review − Pre-Launch Operations 1June 1-2, 2004 Pre-Launch Operations Mark Lewis.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
THEMIS FDMO CDR Peer Review − Management Topics 1June 1-2, 2004 Management Topics Manfred Bester.
Commitment Process Presented by Edward B. Luers October 2008 Interplanetary Network Directorate Deep Space Network.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
Final Version Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Operations Tim Rykowski Jeffrey Hosler May 13-17, 2002.
Supernova/Acceleration Probe (SNAP) Mission/Science Operations Irene Bibyk Tim Rykowski Bob Schweiss June 28, 2001.
THEMIS peer Instrument CDR 1 CETP, Paris, April 8, 2004 THEMIS Mission Status at Peer UCB Instrument Critical Design Review UCB, April 19/20, 2004 Vassilis.
Section Number - 1 NASA’s Goddard Space Flight Center Communication Systems Jason A. Soloff NASA/GSFC Code 567 August 16-17, 2005.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Rich MoeserEVLA System PDR December 4-5, EVLA System PDR Operations Requirements.
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
THEMIS FDMO CDR Peer Review − FOT Activities 1June 1-2, 2004 FOT Activities Mark Lewis.
THEMIS FGM CDR Peer ReviewBerlin, April 6, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness on.
THEMIS FDMO Review Action Item Status − 1 October 5, 2004 Action Item Status Manfred Bester.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
TRIO-CINEMA Meeting at KHU 1 October 19-23, 2009 CINEMA Operations Manfred Bester.
Polar Gateways 2008THEMIS Constellation Operations − Jan 2008 THEMIS Constellation Operations Dr. Manfred Bester University of California at Berkeley.
March 2004 At A Glance autoProducts is an automated flight dynamics product generation system. It provides a mission flight operations team with the capability.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
NASA’s Goddard Space Flight Center Lunar Reconnaissance Orbiter Ground System Requirements.
GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status Review.
1 Technology Infusion of the Software Developer’s Assistant (SDA) into the MOD Software Development Process NASA/JSC/MOD/Brian O’Hagan 2008 Software Assurance.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
KEY PERSONNEL Dr. Bob Schutz, GLAS Science Team Leader Dr. Jay Zwally, ICESat Project Scientist, GLAS Team Member Mr. David Hancock, Science Software Development.
April 5, 2007 Networks Integration Management Office Mission Support Process Networks Integration Management Office; Code
Solar Probe Plus A NASA Mission to Touch the Sun Mission Operations Review News Elena Adams 7/16/2015.
LAT ISOCISOC Review, 15 February GLAST Large Area Telescope Instrument Science Operations Center Commanding, Health and Safety Rob Cameron Stanford.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
GLAST Science Support CenterAugust 10, 2004 Users’ Committee Meeting The Project Data Management Plan David Band – GSSC.
GLAST Large Area Telescope – ISOC Overview and StatusDOE Annual Review, 13 June GLAST Large Area Telescope Instrument Science Operations Center.
March 2004 At A Glance The AutoFDS provides a web- based interface to acquire, generate, and distribute products, using the GMSEC Reference Architecture.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
Telemetry Processing and Archiving − 1 Telemetry Flows, Processing and Archiving.
FDMO Peer Review RFA Summary
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
I&T&C Organization Chart
GLAST Large Area Telescope:
Mission Operations Requirements
THEMIS Mission Confirmation Readiness
FDMO CDR Peer Review RFAs
Current SOC-Ground System Integration Schedule (Jan )
SDO Flight Dynamics Subsystem
Systems Engineering Management
Integration & Test Instrument Operations Coordination
Presentation transcript:

THEMIS FDMO Review Management Topics − 1 October 5, 2004 Management Topics Manfred Bester

THEMIS FDMO Review Management Topics − 2 October 5, 2004 Management Topics Overview Ground System Schedule Personnel Plan Ground Systems Costs IT Security Risk Management Document Status PDR Peer Review RFA Status

THEMIS FDMO Review Management Topics − 3 October 5, 2004 Ground Systems Schedule THEMIS MOC and SOC Configuration During Phase C / D Development of Detailed Operations Plans and Procedures Flight Dynamics Software Configuration and Verification with GNCD Support FOT Training in Classroom and During Mission I&T End-to-end Data Flow Testing with BGS, NASA/GN and TDRSS Launch and Mission Simulations Dress Rehearsals Peak Activities In Phase D, Taper Down During Phase E

THEMIS FDMO Review Management Topics − 4 October 5, 2004 Ground Systems Schedule

THEMIS FDMO Review Management Topics − 5 October 5, 2004 Operations Org Chart All Aspects of THEMIS Operations Are Performed at UCB / SSL GSFC / GNCD Provides Support in Form of Consulting and Certification Additional Consulting Support by AI Solutions

THEMIS FDMO Review Management Topics − 6 October 5, 2004 O&GS Team Members THEMIS Operations & Ground Systems Team –Mission Operations Manager (M. Bester) Mission Operations –Deputy Mission Operations Manager (M. Lewis) –Flight Controllers (M. Eckert, J. McDonald, T. Neal, J. Thorsness, TBH, TBH) –Programmer/Analyst (TBH, TBH) –Student Aides (4) Science Operations –Science Operations Manager (T. Quinn) –Programmer/Analysts (J. Vernetti, TBH) –Student Aides (4) Flight Dynamics –Flight Dynamics Lead (S. Frey) –Flight Dynamics Engineers (J. McDonald, D. Rummel, TBH) –Student Aides (2) Ground Station Operations –Ground Station Manager (R. Sterling) –Ground Station Technician (H. Bersch) –Student Aide (1) IT Network Systems –IT Network Systems Manager (J. Loran) –System Administrators (R. Boyd, W. Herrick, C. Quan, B. Satow, K. Edgecomb)

THEMIS FDMO Review Management Topics − 7 October 5, 2004 MOC Staffing MOC Staffing During Launch & Early Orbit Operations UCB Flight Operations Team 24 Hour Staffing with Prime and Secondary Shifts Critical Commanding During Prime Shift Only Swales and UCB Engineering Team on Console During Prime Shift Instrument Scientists on Console During Instrument Commissioning Additional Support Teams Monitor Probe Status Remotely MOC Staffing During Normal Operations THEMIS Follows FAST / RHESSI / CHIPS Model Normal Operations Eventually Run with 8 x 5 Staffing Transition to Autonomous Operations After First Tail Season Orbit and Attitude Maneuvers Always Treated as Special Operations

THEMIS FDMO Review Management Topics − 8 October 5, 2004 Ground Systems Costs Cost Effective Approach Based on Successful FAST / RHESSI / CHIPS Model Mission Operations, Science Operations, Flight Dynamics and Ground Station Operations Integrated Into One Coherent Facility Phase-in THEMIS Operations Team Gradually Hire New Personnel to Enlarge Existing Operations Team Ground Systems Costs Remain Within CSR Budget Ground System Development Fully Funded Required Trade Study Performed in Phase B

THEMIS FDMO Review Management Topics − 9 October 5, 2004 Ground Systems Support Supporting Analyses RF Link Analysis Data Volume Analysis Ground Station and TDRSS Coverage Analysis Maneuver Analysis Tracking Accuracy Analysis Interface Control Documents Probe to Ground Stations Ground Stations to MOC MOC to SOC, FDC to MOC, FDC to SOC MOC to GSFC/FDF Support Agreements with Various Organizations NASA/GSFC GNCD (Code 570) NASA/GSFC MSP (Code 451) Ground Stations (WGS, MILA, AGO, HBK) and Space Network

THEMIS FDMO Review Management Topics − 10 October 5, 2004 NASA GSFC/GNCD Support FDAB Support Via SOW for FY05 –MSASS Upgrade Including Nutation Estimation Utility and Small Level of Usage Support (R. Harman) –Attitude Error Analysis Support for Swales Aerospace (R. Harman) –Validation of FreeFlyer (R. DeFazio, K. Richon) –Generate Benchmark Runs with GMAN –Compare FreeFlyer Runs Against GMAN –Assess Ability of FreeFlyer to Meet THEMIS Mission Requirements –UCB Will Contract AI Solutions to Generate FreeFlyer Benchmark Runs –GTDS Software Upgrade and Small Level of Usage Support (M. Beckman) FDF Support Via PSLA –Assignment of BGS Transmit and Receiver Tracker IDs –Verification and Certification of BGS Two-way Doppler Tracking –Pre-launch Data Flow and Simulations Support for OD –Orbit Determination Support Following Launch GSFC/GNCD Support

THEMIS FDMO Review Management Topics − 11 October 5, 2004 AI Solutions Support FreeFlyer Software –UCB Already Has “Engineer” Version –Upgrade to FreeFlyer Mission Once THEMIS Compatibility Verified THEMIS Configuration –Spacecraft Definition Files for THEMIS Probes Software User Training –FreeFlyer –GTDS Flight Dynamics Support –Maneuver Planning Support –Orbit Determination Support Operations Support –Support L&EO Operations

THEMIS FDMO Review Management Topics − 12 October 5, 2004 NASA GN and SN Resource Requirements in PSLA THEMIS FY04 PSLA Signed and FY05 PSLA Currently Boarded by GSFC/MSP (Code 451) PSLA Under MSP Configuration Control Compatibility Test Van (CTV) for GN/SN End-to-end Testing Additional Documentation Requirements RF ICD (Probe to GN and SN) – Submitted to GSFC/MSP Network Requirements Document (NRD) − Draft in 2005 RF Compatibility Test Plan (CTP) − Draft in 2005 Data Flows and Scheduling for Ground Testing & Mission Operations Simulations Supported and Coordinated by GSFC/MSP Ground System Development Support of Experiments with Berkeley Ground Station to Determine Accuracy of Two-way Doppler Tracking GSFC/MSP Support

THEMIS FDMO Review Management Topics − 13 October 5, 2004 Documents Relevant to Ground Systems Risk Management NPG B, NASA Program and Project Management Processes and Requirements NPG , Risk Management Procedures and Guidelines NPD , NASA Policy for Safety and Mission Success NPG , NASA Safety Manual NPG , Security of Information Technology NPD , Mishap Reporting and Investigating Policy NPG 8621.X (Draft), NASA Procedures and Guidelines for Mishap Reporting, Investigating and Record Keeping SP-6105, NASA Systems Engineering Handbook Risk Management Approach Continuous Risk Management (CRM) Identify, Analyze, Plan, Track and Control Risks Risk Management

THEMIS FDMO Review Management Topics − 14 October 5, 2004 Status of Relevant Documents Document TitleDoc. No.AssigneeDue DateStatus THEMIS Mission Requirements Document (MRD)THM-SYS-001TaylorJun 2004Signed THEMIS Information Technology Security Plan (ITSP)THM-SYS-021BesterFeb 2004Signed THEMIS Risk Management and Contingency Plan (RMCP)THM-SYS-022BesterNov 2004Started THEMIS Project Data Management Plan (PDMP)THM-SYS-012QuinnJun 2004Signed THEMIS Project Service Level Agreement (PSLA)451-PSLA-THEMISGSFC/451Sep 2004Signed THEMIS RF Interface Control Document (RFICD)451-RFICD-THEMISGSFC/451Oct 2004Draft THEMIS RF Compatibility Test Plan (RFCTP)450-TBDGSFC/450Jul 2005 THEMIS Network Requirements Document (NRD)450-TBDGSFC/450Jul 2005 THEMIS Command Format SpecificationTHM-SYS-102TaylorOct 2004Draft THEMIS Telemetry Data Format SpecificationSAI-SPEC-1210KraeuterOct 2004Draft THEMIS Ground Data Systems Interface Control DocumentTHM-SYS-117BesterOct 2004Started THEMIS Attitude Determination System (ADS) RequirementsTHM-SYS-028BesterOct 2004Draft THEMIS GSFC/FDF to MOC Interface Control Document595-TBDGSFC/595Mar 2005 THEMIS Ground Operations CoordinationSAI-PLAN-0623LeBoeufOct 2003Signed THEMIS Mission Operations Plan (MOP)THM-SYS-013BesterNov 2004Started THEMIS Flight Operations Plan (FOP)THM-SYS-018BesterOct 2005Started THEMIS Flight Operations Test Plan (FOTP)THM-SYS-019BesterOct 2005Started THEMIS Flight Operations Team Certification Plan (FOTCP)THM-SYS-025LewisOct 2005Started THEMIS Ground Station Certification PlanTHM-SYS-TBDBesterMar 2005 THEMIS Launch and Ascent HandbookTHM-SYS-026UCBOct 2005 THEMIS On-orbit HandbookTHM-SYS-027UCBOct 2005 THEMIS Spacecraft User’s ManualSAI-TBDSwalesOct 2005