Colorado Space Grant Consortium Gateway To Space ASEN 1400 / ASTR 2500 Class #17 Gateway To Space ASEN 1400 / ASTR 2500 Class #17 T-39.

Slides:



Advertisements
Similar presentations
Overcoming Customer Constraints on Requirements Documents Presented by: Robert Smole Presented by: Robert Smole November 5, 2008 Sub-Optimization of Systems.
Advertisements

Deliverable #8: Detailed Design - Overview due: Wednesday, 7 March All Deliverable materials are to be posted into Team Concert. Your to.
The Software Project Management Discipline Succes software projects require careful planning and good use of iterative approaches. Understanding risks.
1 Chapter 2: Product Development Process and Organization Introduction Importance of human resources: Most companies have similar technology resources.
Space-Systems Engineering. Unit 3, Chapter 9, Lesson 9: Space Systems Engineering2 Space-systems Engineering Space Mission Design – Designing Space Missions.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #27 Gateway To Space ASEN / ASTR 2500 Class #27 T+9.
The Role of Software Engineering Brief overview of relationship of SE to managing DSD risks 1.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #02 Gateway To Space ASEN / ASTR 2500 Class #02.
Development and Use of Architectures in System Engineering Rosalind Lewis USC-CSSE Workshop October 2007 © 2007 The Aerospace Corporation Motivated by.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #23 Gateway To Space ASEN / ASTR 2500 Class #23.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #27 Gateway To Space ASEN / ASTR 2500 Class #27 T+3.
Computer Engineering 203 R Smith Agile Development 1/ Agile Methods What are Agile Methods? – Extreme Programming is the best known example – SCRUM.
1 Introduction to System Engineering G. Nacouzi ME 155B.
CS350/550 Software Engineering Lecture 1. Class Work The main part of the class is a practical software engineering project, in teams of 3-5 people There.
1 Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #14 Gateway To Space ASEN / ASTR 2500 Class #14.
1 Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #08 Gateway To Space ASEN / ASTR 2500 Class #08.
Mission Operations in Small Satellite Projects Making Mission Operations Effective J. Burkert Colorado Space Grant Consortium.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #9 Gateway To Space ASEN / ASTR 2500 Class #9.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #20 Gateway To Space ASEN / ASTR 2500 Class #20.
CSULB EE400D Documentation Instructional Series
Page - 1 Rocketdyne Propulsion & Power Role of EASY5 in Integrated Product Development Frank Gombos Boeing Canoga Park, CA.
Engineering Systems of.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Enterprise Architecture
Systems Engineering for Space Vehicles Bryan Palaszewski with the Digital Learning Network NASA Glenn Research Center Cleveland, OH.
Effective Methods for Software and Systems Integration
New Mexico Space Grant Consortium Student Launch Program Provide annual access to space for student experiments from Spaceport America.
1 Lecture 5.3: SEF Ch 4 Requirements Analysis Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Copyright Course Technology 1999
Noah Garcia-Galan *Some information in this presentation comes from outside sources.
Chapter 8: Requirements analysis & allocation (pt. 2) ISE 443 / ETM 543 Fall 2013.
Chapter 6 System Engineering - Computer-based system - System engineering process - “Business process” engineering - Product engineering (Source: Pressman,
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
Space Engineering 2 © Dr. X Wu, 2012
1 Formation Flying Project Proposal 2/5/07 Rachel Winters (Team Lead) Aziatun Burhan Tsutomu Hasegawa Shunsuke Hirayama Matt Mueller Masao Shimada Shelby.
Software System Engineering: A tutorial
Team Skill 6: Building the Right System From Use Cases to Implementation (25)
Principles of Engineering System Design Dr T Asokan
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #04 Gateway To Space ASEN / ASTR 2500 Class #04.
Colorado Space Grant Consortium Gateway To Space ASEN 1400 / ASTR 2500 Class #06 Gateway To Space ASEN 1400 / ASTR 2500 Class #06 T-79.
PROJECT MANAGEMENT. A project is one – having a specific objective to be completed within certain specifications – having defined start and end dates.
Fuel Cell Systems Engineering, F06 Fuel Cell Systems Engineering Systems Engineering Process.
CSULB EE400D DOCUMENTATION INSTRUCTIONAL SERIES PRELIMINARY DESIGN REVIEW.
Software Product Line Material based on slides and chapter by Linda M. Northrop, SEI.
TREADS Semester Review Dec. 14, Objectives Assess and Communicate Current Design Identify interfaces Approve the System Requirement Specification.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
1 Mission Discussion & Project Reviews 祝飛鴻 10/14/93.
NASA/Air Force Cost Model presented by Keith Smith Science Applications International Corporation 2002 SCEA National Conference June
Know the systems- engineering process. Apply systems engineering to design space missions Understanding the Systems Engineering Process.
Sea Launch/Zenit Thrust: 8,180,000 N Fueled Weight: 450,000 kg Payload to LEO: 13,740 kg Cost per launch: $100,000,000 Cost per kg: $7,300 Launches: 31/28.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #05 Gateway To Space ASEN / ASTR 2500 Class #05.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Smart Home Technologies
20c - 1 NASA’s Goddard Space Flight Center Propulsion Chuck Zakrwski NASA/GSFC Code 597 August 16-17, 2005.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Software Engineering Lecture 10: System Engineering.
2014 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
Tethered Aerostat Program Concept Design Review Team Name Conceptual Design Review University/College Team Members Date.
IISME Fellowship Lockheed Martin Space Systems Summer 2010 SBIRS Space Based Infrared System GEO-1 satellite All pictures are from google.
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
The Systems Engineering Context
Payload Concept Review
Software Requirements analysis & specifications
Project Management Process Groups
Tina Büchner da Costa, ArianeGroup
Presentation transcript:

Colorado Space Grant Consortium Gateway To Space ASEN 1400 / ASTR 2500 Class #17 Gateway To Space ASEN 1400 / ASTR 2500 Class #17 T-39

-Announcements -One Minute Report Questions -Guest Lecture on Systems Engineering Today:

-Hardware for teams… -Pressure sensors and other hardware UNO $$$ -Latest grades posted later today -Feedback on DD Rev A/B next Tuesday -DD Rev C assigned today and due Don’t forget about HW #8 – Review it first Announcements:

-Traveling tomorrow – Planned -Guest speaker is not coming – Not Planned -So tomorrow is… Announcements:

Colorado Space Grant Consortium Next Time… Spider Plus remote introduction (Originally the lecture scheduled for November 15 th ) Next Time… Spider Plus remote introduction (Originally the lecture scheduled for November 15 th )

- What kind of rocket is Dreamchaser? -What is Dreamchaser used for? -Where do dropped engines go? Orbit, outerspace? -Biggest advance from past to present rockets? -Do all space programs work together now? -How do private companies get funded? One Minute Report Questions:

- Why do they chose solid vs. liquid, vs. hybrid? -As an aerospace major, how well versed should I be with coding/programming? -What happened to the Orion space missions? -What does the future of space exploration look like? One Minute Report Questions:

8 Colorado Space Grant Consortium Questions?

9 Colorado Space Grant Consortium Homework #7 Review Homework #7 Review

10 NASA Mission Announcement – ChuSat Design a spacecraft in 30 minutes that will meet the following two requirements: 1.The total mass of the power, science instruments, and propulsion shall not exceed 900 lbm. a.The propulsion mass shall include the mass of propellant Homework #7:

11 NASA Mission Announcement – ChuSat Design a spacecraft in 30 minutes that will meet the following two requirements: 2.The spacecraft shall collect a minimum of 20 hours of scientific data a.The spacecraft shall collect data in the 1x10-9 to 1x10-10 wavelengths b.The spacecraft shall collect data in the 1x10-3 to 1x10-4 wavelengths The following subsystem capabilities and specifications are at your disposal. Homework #7:

12 Homework #7:

13 Homework #7:

14 Homework #7:

15 Homework #7 - (Answer) Science - Infrared Sensor75 W30 lbm - X-ray Sensor100 W40 lbm Total Science Mass70 lbm If only one sensor is on at a time is the requirement of 20 hours met? Only have one sensor on at a time, therefore the Science power requirement is 100 W, not 175 W.

16 Power Need at least 1,000 W to stay alive plus 100 W for science therefore you need to have at least 1,200 W solar array and battery Total weight = 60 lbm for solar array = 120 lbm for battery Total= 180 lbm You will find out the Fuel cell is way too heavy Homework #7 - (Answer)

17 In-Class Exercise: (Answer) Propulsion Need at least 80 lb of thrust therefore you need the following Two 25 lb thrusters= 20 W 25 lbm Three 10 lb thrusters= 20 W 15 lbm Total Power= (40+60 W) = 100 W Total Mass= ( ) =95 lbm

18 In-Class Exercise: (Answer) Total Mass Science= 70 lbm Power= 180 lbm Propulsion= 95 lbm Total = 345 lbm (minus propellant)

19 In-Class Exercise: (Answer) Propellant Mass 2x25 lb = 50 per/100 lbm = 100 lb 3x10 lb = 20 per/100 lbm = 60 lb Total= 160 lb per 100 lbm 345 lbm / 100 lbm * 160 lbm = 552 lbm

20 In-Class Exercise: (Answer) Total Mass Science= 70 lbm Power= 180 lbm Propulsion= 95 lbm Total = 345 lbm (minus propellant) Propellant= 552 lbm Total mass= 897 lbm

Colorado Space Grant Consortium Systems Engineering Jessica Brown Lockheed Martin Rachel Landess Lockheed Martin Systems Engineering Jessica Brown Lockheed Martin Rachel Landess Lockheed Martin

22 Introduction to Systems Engineering Rachel Landess Keith Morris Jessica Brown October 23, 2012

23 What is Systems Engineering Is a systematic, interdisciplinary approach that transforms customer needs into a total system solution A framework of interrelated activities that spans Design, Management, and Realization of systems Balances customer needs with system capabilities Led and organized by Systems Engineers –But all functions play a role It is the technical “glue” which makes separate design disciplines and subsystems function together to provide an integrated system

24 Be a “Systems Thinker” The Design Engineer –The specialist's viewpoint –Views the system from the inside – Concerned with other system elements only as they affect their own design task –Not necessarily how their system may affect others Systems thinkers –Views the system from the outside. – Concerned with the effect of all system elements as they affect overall system design / performance / cost / schedule –Concerned no matter where the hole in the boat is

25 Systems Engineering must focus on the entire problem: optimize the whole, not the parts!

26 The Art & Science of Systems Engineering Art of Systems Engineering –Technical Leadership –Understanding how all the individual pieces go together to make the big picture Science of Systems Engineering –Systems Management –Managing all the details for every piece of the system and keeping them in synch Cost, Schedule, Performance, & Risk To be Successful, we must balance both technical leadership and systems management into complete systems engineering

27 Systems Engineering “V” Model

28 Architecture System Architecture is the overall structure of the program, internal interfaces, and how it interacts with external interfaces –System Level – Constellation of Satellites, Ground stations, etc. –Spacecraft Level – Subsystems and interfaces that make up spacecraft –Subsystem – Components and technologies that make up subsystem –Architect’s role is to ensure customer requirements and needs are properly addressed in the system Identifies utility and flexibility of the system Optimizing architecture can make spacecraft trades easier

29 Spacecraft Architecture (image credit: NASA/GSFC)

30 Concept of Operations Concept of Operations (CONOPS) –How the system will be used –Links technical requirements with user’s needs Requirements do not fully represent customer’s wishes… –Operational scenarios, timelines, block diagrams, orbital maneuvering among the products –Example: Assignment Requirements do not specify how often payloads need to operate, could reduce overall power required

31 Con Ops Example – ALL-STAR

32 Requirements Management A requirement is a “single, verifiable shall statement” Requirements dictate the form, fit and function the system design shall meet Requirements address both characteristics as well as capabilities –Characteristics=what the system shall be –Capabilities=what the system shall do Higher level requirements are decomposed to lower level requirements

33 Why are requirements important Clearly communicating requirements is essential How the customer explained it How the project manager understood it How the engineers designed it How materials ordered it How it was built How the customer really wanted it

34 Design Integration Balance the needs of the customer with the capabilities of the spacecraft Balance the needs of the individual subsystems –Allocate mass, volume, power constraints –Relate it to their assignment Ensuring subsystems are talking with one another –Making sure they are compatible Identifying subsystem interfaces Its kind of like Herding Cats

35 Risk Management Risk management is done throughout the entire program life cycle Risk is defined in two dimensions –Probability of occurrence –Consequence if the risk occurs Identify risks while there is still time to react Put in place mitigation strategy to minimize or eliminate risks Sources of risks include: –Poorly defined technical tasks or cost estimations –Poorly defined requirements and interfaces –Low technological maturity (technical risks) –Unrealistic project planning or inadequate resources –Inadequate workforce skill level Consequence Probability of Occurrence Risk Matrix

36 Hardware Integration Assembly of spacecraft hardware Spitzer Space Telescope from design to integration

37 Verification and Validation Verification –“Did we build the system right” Validation –“Did we build the right system” System Testing –Functional tests –Vibe tests (drop tests) –Shock tests (swing tests) –Thermal Vacuum tests –Acoustic tests ALL-STAR and team at vibe test at Lockheed Martin

38 Mission Operations Starts when spacecraft development is initiated and continues through final disposal of space asset Provide mission requirements support for development of operational systems –Used to plan and control launch vehicle and spacecraft operations Developing mission profiles, operational procedures and related operational documentation Balance and allocate operational requirements with operational performance Determine operations integration tasks –Defining capabilities and constraints associated with launch vehicles, spacecraft and mission control and ground systems

39 Summary Systems Engineering is an integrated composite of people, products, and processes –Forms a structured development process –Spans design, production, and operation of systems Balances the needs of the customer with the capabilities of the system Uses technical leadership and systems management –Integrates all disciplines and specialty groups into team –Manages cost, schedule, performance, and risk There is no perfect solution –Systems engineering produces the optimal solution for the entire spacecraft