IMFO OCTOBER 2012 Presented by: Fred Fryer Director: Revenue Services (Energy) THE EKURHULENI EXPERIENCE ON THE INCLINING BLOCK TARIFF.

Slides:



Advertisements
Similar presentations
Efficient Pricing of Energy Conservation and Load Management Programs. August 9 th,2006 Kansas Corporation Commission Staff.
Advertisements

Protection of the Poor through the implementation of the Social Electricity Tariffs: The South African Experience Author & Presenter: S D Salvoldi, B Comm,
Bruce Mountain Director Electricity Tariff Revolution: some questions Presentation to Energy Efficiency Council Annual Conference.
Partnerships in Power Franchisees
Electricity cost risk modelling of the Energy Conservation Scheme (ECS) for the Gold mining industry of South Africa Lodewyk van der Zee
OVERVIEW ON THE MUNICIPAL GUIDELINE,BENCHMARKS
Time-of-Use and Critical Peak Pricing
Economic Framework for Assessing Solar PV In Electric Utility Industry Jim Cater Director, Economic &Financial Policy 1.
1 Northeast Public Power Association Electric Utility Basics Electric Rates and Cost of Service Studies.
Australian Energy Regulator AER Preliminary decisions for Energex and Ergon Energy 2015−20 Conference 12 May 2015.
Welcome and Introductions CoServ Presentation & Member Input.
TVA Generates Power and sends it down Transmission Lines to Newport Utilities Distribution Substations TVA Newport Utilities Substations Distributes the.
4. Water Pricing and Metering 2  Water use responds to changes in price  An effective water pricing is an important mechanism of water demand management.
Constructing West Midlands Martin Merrix Divisional Manager, Urban Design.
Cost of Service Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
Comments on Progress with regard to Solar Water Heater Rollout Select Committee on Economic Development 28 February 2012.
Presentation to Energy & Technology/Planning & Development Committees Considerations on Establishing Municipal Utilities Joint Informational Forum Legislative.
Innovative approach to DSM through Open Access Jayant Deo MD & CEO, Indian Energy Exchange
Information ITIL Technology Infrastructure Library ITIL.
Citizens’ Academy Kathy Viehe GRU Interim General Manager November 12, 2014.
O V E R B E R G W A T E R. 1.AREAS AND MUNICIPALITIES SERVED, ACHIEVEMENTS AND CHALLENGES  Relationship with Municipalities  Non-Financial Performance.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
ERP. What is ERP?  ERP stands for: Enterprise Resource Planning systems  This is what it does: attempts to integrate all data and processes of an organization.
Ohio’s Percentage Income Payment Plan (PIPP) Dave Rinebolt, Executive Director and Counsel Ohio Partners for Affordable Energy PO Box 1793, Findlay, OH.
ELECTRIFICATION FOR DEVELOPMENT C T Gaunt University of Cape Town.
Embedded Generation Workshop SALGA Head Office 18 April 2013 THE POTENTIAL IMPACT OF EFFICIENCY MEASURES AND DISTRIBUTED GENERATION ON MUNICIPAL ELECTRICITY.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER – Sebastian Roberts, General Manager Networks ◦Consumer challenge panel – Robyn.
1 Cost of Service A Tariff Overview A presentation by Eskom April 2010.
COMMUNITY CHOICE AGGREGATION: TECHNICAL STUDY RESULTS Peninsula Clean Energy September 24,2015.
5. The Purchasing Management Process
APPA’s Financial Planning for Municipals Mark Beauchamp, CPA, CMA, MBA September 27, 2005 Business & Finance Workshop.
1 Electricity Industry – Municipal Tariff Issues and NERSA Approval Processes Compiled by Nhlanhla Ngidi.
CITY OF EKURHULENI (EMM) challenges experienced and possible solutions relating to EDI JOINT PUBLIC HEARINGS BETWEEN THE PC ON ENERGY AND THE PC ON COOPERATIVE.
TAOYUAN ENVIRONMENTAL SCIENCE & TECHNOLOGY PARK BUSINESS INVITATION SEMINAR PRESENTATION OF PREFERENTIAL MEASURE & COUNSELING ENVIRONMENTAL PROTECTION.
An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.
DEVELOPMENT OF INTEGRATED STRATEGIC DEVELOPMENT FRAMEWORK FOR KNYSNA MUNICIPALITY REPORT ON STATUS QUO OF ELECTRICAL INFRASTRUCTURE October 2013.
The Multi- Year Price Determination MYPD Presented by: Thembani Bukula Regulator Member – Electricity Regulation.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
Programme Financial Implications for Municipalities Eskom’s view on how to establish the financial impact of restructuring - as input to the EDIH.
11 Prabhakar Tandon Head Business Development Secure Meters Limited Distribution Reform-A different Approach.
1 Strategic Plan | May Decisions on rates, budgets, investments, programs and services for six years ( ) The Strategic Plan.
Rate Policy Discussion Presentation to Review Panel November 1, 2013.
The Association of Municipal Electricity Undertakings (Southern Africa) NERSA Public Hearing Municipal Tariff Guideline, Benchmarks and Timelines /12.
Wheeling Challenges Presentation To AMEU Tariff Committee Utility Services/Electricity Services/ 11 November 2015.
1 Local Government Budgets and Expenditure Review 2001/02 – 2007/08.
1 Who benefits from utility subsidies? Caroline van den Berg K. Komives, V. Foster, J. Halpern, Q. Wodon and R. Abdullah September 13, 2006.
Electricity Sector April Electricity sector in perspective Electrification of households is one of Government’s priority programmes The country.
Proposed framework for charges for generators connected to the Distribution network Please note that the contents of this presentation are proposals at.
Unit (5) What are objectives ? - All business have objectives. - The objectives are the goals which are se out by people who conduct the organization.
ARMENIA: OBA SCHEME FOR PROVISION OF GAS AND HEATING Washington D.C. March 8, 2006 Energy Week.
S V.MOUNICA 09551A0294.  To increase the distribution rate of present electric supply which is 70% to 100%.  Improving the supply to house holds without.
June 17, 2015 (Regina) June 18, 2015 (Saskatoon) SaskEnergy 2015 Rate Application.
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
WHAT ROLE DOES THE GOVERNMENT PLAY???. WHAT DOES THE GOVERNMENT PROVIDE FOR IN A MARKET ECONOMY? The government provides goods and services such as military.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
Distributed Generation Chau Nguyen, Pricing & Sales Support
Level 2 Business Studies AS90843 Demonstrate understanding of the internal operations of a large business.
1 Presentation to PPC on Municipal Electricity Tariff Determination 30 JULY 2013.
Information ITIL Technology Infrastructure Library ITIL.
Kaysville City, UT Electric Rate Study Results
Michael Maphosa and Patrick Mabuza
Distributed Generation Chau Nguyen, Pricing & Sales Support
Eskom presentation – Select Committee on Communications and Public Enterprises 14 June 2017 Briefing by Eskom on its tariff increase for and.
City of Cape Town Submission on EDIR
Communicare Boom Flats Retrofit: Financial Analysis
City of Lebanon, Missouri Electric Department
FFC Briefing to the Portfolio Committee on Energy
Presentation to PPC : Energy on the Free Basic Electricity (FBE)
Presentation to PPC : Energy on the Free Basic Electricity (FBE)
Presentation transcript:

IMFO OCTOBER 2012 Presented by: Fred Fryer Director: Revenue Services (Energy) THE EKURHULENI EXPERIENCE ON THE INCLINING BLOCK TARIFF

#Discussion 1Ekurhuleni* Energy at a glance 2Influencing factors on the Ekurhuleni IBT 3The current levels of the EMM IBT 4Placing the EMM IBT levels in context 5Is the City of Ekurhuleni doing the right thing? 6Conclusion * Ekurhuleni = EMM DISCUSSION POINTS

#Discussion 1Ekurhuleni Energy at a glance 2Influencing factors on the Ekurhuleni IBT 3The current levels of the EMM IBT 4Placing the EMM IBT levels in context 5Is the City of Ekurhuleni doing the right thing? 6Conclusion DISCUSSION POINTS

EKURHULENI ENERGY AT A GLANCE EMM has 48 bulk infeed points from Eskom The July 2012 account to Eskom was R1 billion (one thousand million) Bulk purchase account from Eskom in 2012/2013 will be R6,7 billion EMM predicted income from electricity sales is about R11 billion The City has the following numbers of electricity meters: Credit meters = Large meters = Prepayment meters = Total meters = Eskom supply areas inside EMM boundaries = meters Eskom larger customer meters = +-278

Previous year performance Financial targets were: – Income Budget Budget set at R9,414,228,343 Income achieved of R9,129,499,958 Which is 97% – Bulk purchases of electricity Purchase budget set at R5,957,128,828 Actual purchases of R5,984,093,496 Which is 100,5% The colder winter is the most likely reason for the deviation

The graph shows that electricity sales have generally declined since 2007, with a slight increase in 2011 This indicates a struggling economy or rising electricity prices forcing efficiency

REVENUE VALUE CHAIN COMPONENTS ENERGY OPS & MAINTENANCE FINANCE INCOME FINANCE INCOME METERINGONLINE CONTRACTOR Utility Risk Management METERINGONLINE CONTRACTOR Utility Risk Management METER READ CONTRACTOR(S) Motla METER READ CONTRACTOR(S) Motla WEMMC 1 (Netgroup) WEMMC 2 (Tsekema) METER REPAIR CONTRACTOR(S) One per depot METER REPAIR CONTRACTOR(S) One per depot ENERGY REVENUE SERVICES IMQS ELECTRICITY REVENUE MODULE VENUS BUSINESS PROCESS MANAGEMNT IMS (Tembisa) IMS (Tembisa) SUPRIMA BCX Landis & Gyr REVENUE ELECTRICITY TARIFFS SUPPLY CHAIN MANAGEMENT GIS BUDGET MANAGEMENT MATERIAL SUPPLY CONTRACTS (meters, protective structures, etc) THIRD PARTY VENDING CONTRACTOR(S) Cigicell, Easypay, Smartec THIRD PARTY VENDING CONTRACTOR(S) Cigicell, Easypay, Smartec REVENUE MANAGEMENT & ENHANCEMENT PROJECT NERSA OPEX + CAPEX FUTURE METER MANAGEMENT SOFTWARE (currently at WEMMC’s) Meter fault management software Pragma CRM IMQS PROJECT CONTROL IMQS PROJECT CONTROL COMMUNICATIONS NETWORK (ICT) FUTURE SMART METERS ID2

MAIN FACTORS SUPPORTING ELECTRICITY REVENUE, including a reduction in kWh losses A good set of electricity tariffs – EMM is fortunate to have leading talent in this regard A very robust method of reading and managing demand meters – meteringonline, meter management consultants, Finance, Energy meter maintenance Reliable prepayment vending systems – Suprima and IMS Dealing with meter interference (tampering) sustainably Automation of processes such as new meter installations, meter exchanges, etc (business process management) and tracking of progress

MAIN REVENUE PROJECTS ELECTRICITY TARIFFS Reduced risk, adequate returns, refinement, manage Inclining Block Tariff DEMAND METERS (LARGER USERS) AMR, tariff rules applied, refinement of supportive processes CREDIT METERS Maintenance managed, focus on no-access meters Smart meters to be tested in our environment (can we manage the technology, communications, effects of lightning, reliability, etc) PREPAYMENT METERS Venus / Suprima integration project Tembisa system upgrade (communications) OTHER Business processes, contain costs, add customers, keep networks reliable, training to improve Energy skills

#Discussion 1Ekurhuleni Energy at a glance 2Influencing factors on the Ekurhuleni IBT 3The current levels of the EMM IBT 4Placing the EMM IBT levels in context 5Is the City of Ekurhuleni doing the right thing? 6Conclusion DISCUSSION POINTS

INFLUENCING FACTORS ON EMM IBT EMM has residential customers, supplied by Eskom These customers are spread over vast areas throughout the EMM area In terms of previous electricity tariff charges, there was differentiation between the EMM specific IBT rates and the general Eskom IBT rates Previously, EMM had IBT rates suitable to EMM conditions, i.e. Two sets of residential tariffs, one for higher consuming customers, and One for lower consuming customers, and Both being available to any residential customer (i.e. free choice) A cross-over point, designed at a fairly low consumption level, ideally at 500 units per month, was maintained A high consuming customer insisting on the IBT, could change to the IBT, but Would end up paying more for electricity The careful design created the minimum of customer administrative management and protected EMM income, whilst also taking care of vulnerable customers with 100 units FBE coupled to the IBT

GRAPH ILLUSTRATING A CROSS-OVER POINT DESIGNED INTO TWO RESIDENTIAL TARIFFS

INFLUENCING FACTORS ON EMM IBT EMM customers and Eskom customers inside EMM boundaries questioned the tariff differentiation (One City, two tariffs?) EMM, from 1 July 2012, adopted the exact Eskom IBT rates Which will now form the status quo for the City One change was made to a final block, creating a financial barrier to deter higher consuming customers from migrating to the subsidized IBT This was done to maintain a second tariff for higher consuming customers, in order to deal with multiple households on one stand EMM also engaged with customers to explore a reduction of the FBE allocation (100 units per month), or to target the FBE allocation EMM customers were opposed to this and FBE of 100 units per month continues, coupled to the IBT in a broad-based manner Effectively, FBE subsidizes block 1 and part of block 2

#Discussion 1Ekurhuleni Energy at a glance 2Influencing factors on the Ekurhuleni IBT 3The current levels of the EMM IBT 4Placing the EMM IBT levels in context 5Is the City of Ekurhuleni doing the right thing? 6Conclusion DISCUSSION POINTS

IBT EKURHULENIESKOM Notes VAT exclusive (c/kWh in 12/13 ) EMM PROVIDES AND PAY FOR 100 UNITS PER MONTH FREE BASIC ELECTRICITY IN BOTH EMM AND ESKOM AREAS A.1 Block (1-50 kWh) 60,83c same A.2 Block (>50 to <=350 kWh) 75,09c same A.3 Block (>350 to <=600 kWh) 111,42c same A.4 Block (>600 kWh for Eskom) Block (>600 to <=700 kWh for EMM) * EMM modification 122,21c same A.5 Block (>700 kWh for EMM only) * Block 5 acts as a theoretical “barrier” to prevent higher end customers from receiving a windfall benefit 200,00c SELECT TARIFF B AT 108,6c 122,21c (> 700 kWh per month customers should select Tariff B, which is R108,60c) EKURHULENI AND ESKOM RATES

#Discussion 1Ekurhuleni Energy at a glance 2Influencing factors on the Ekurhuleni IBT 3The current levels of the EMM IBT 4Placing the EMM IBT levels in context 5Is the City of Ekurhuleni doing the right thing? 6Conclusion DISCUSSION POINTS

The next few slides are unique to EMM in that: – The IBT is at the same level as Eskom, for reasons provided – The IBT tariff receives a broad-based allocation of 100 units of FBE – The average bulk purchase rate from Eskom, will vary from City to City, as well as in the case of smaller municipal distributors. In this case, the EMM purchase rate was used to illustrate the principle PLACING THE EMM IBT LEVELS IN CONTEXT

EMM will purchase from Eskom at 60c per kWh Technical and non-technical losses, conservatively, are 10% (see next slide) The City can, therefore, only sell 90% of units purchased from Eskom The value of 60c, now becomes 67c The first and second block of the IBT are: PLACING THE EMM IBT LEVELS IN CONTEXT A.1 Block (1-50 kWh) 60,83c A.2 Block (>50 to <=350 kWh) 75,09c

PLACING THE EMM IBT LEVELS IN CONTEXT September 2012 Tariff ATariff BTariff A and B combined CCA Active Meters Average Consumption Active Meters Average Consumption Active Meters Average Consumption ALBERTON 17, , , BENONI 11, , , BOKSBURG 16, , , BRAKPAN 17, , , EDENVALE , , GERMISTON 28, , , KEMPTON 4, , , NIGEL 6, , SPRINGS 28, , , TEMBISA 8, , , ALL CCAs 142, , , Average consumption for September is 315 kWh, for a low consumption customer base of units are FBE, EMM sells 215 units per customer EMM income from this customer is R161. Eskom account is R211.* * ignoring external subsidization AND ignoring theft of electricity.

VANDALISM AND THEFT The photo was taken in July 2012, in Villa Liza x2, Boksburg 6 prepayment meters in one pole top box, all bypassed, at least 4 meters destroyed A capital intervention is required involving protective structures and new meters The uncontrolled electricity consumption destroys transformer and cable insulation, even to the point that they catch fire

SUCCESS IS POSSIBLE Our experience in Langaville (and other areas) shows that creating a commercially viable area (i.e. electrical network restored and protected) can result in excellent payment levels in EMM Our experience indicate that a significant amount of work and other resources are required to reach the stage depicted in the next slide

LANGAVILLE IN EMM Langaville proper has active meters EMM electricity income was at a low of R2 300 per month for Langaville Average account of R1,13c per month Post intervention – income is R (or an average account of R138 pm, ave 250 units pm) The R138 per month is payable after 100 units FBE were received, which = R67

#Discussion 1Ekurhuleni Energy at a glance 2Influencing factors on the Ekurhuleni IBT 3The current levels of the EMM IBT 4Placing the EMM IBT levels in context 5Is the City of Ekurhuleni doing the right thing? 6Conclusion DISCUSSION POINTS

Vulnerable electricity customers should be protected against high electricity costs. The assumption is underpinned by an acknowledgement that access to electricity is an important instrument in alleviating poverty. No access to electricity to a large extent denies access to safe cooking, lighting, knowledge acquisition and communication. Municipalities and Eskom should also be protected from over-extending their social responsibility related to the levels of the IBT. Block 1 of the IBT should be set at a level comprising at least the average annual bulk purchase cost of municipalities plus 10%, to practically compensate for technical losses and a small percentage of non-technical losses. The subsidy to the IBT customers will still be considerable, given that no maintenance and refurbishment costs, or administrative costs (such as vending costs, human resources, etc) are recovered, nor any surplus contribution.

DISCUSSION POINTS (2) Supplementing the IBT with a second tariff, i.e. by creating two tariffs, catering for two very different sectors of electricity users, several major problems are averted. Two tariffs avoid negative factors such as: income levels that must be protected; placing additional burden on business and industry to make up for shortfalls in income; the dilemma created by IBT and multiple households; the dilemma created by intermittent users, and a lack of choice in tariffs for residential users. The IBT is often relevant in areas where non-technical losses are very high. If these are not controlled, the IBT levels may become very critical in terms of the survival of the distributor.

Ngiyabonga