Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.

Slides:



Advertisements
Similar presentations
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Advertisements

CVP Cost Allocation Public Workshop – January 18, 2013 “PLEXOS Methodology and Assumptions”
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
Capacity Valuation.
Sixth Northwest Conservation & Electric Power Plan Actual vs. Modeled Operation of Combined-Cycle Combustion Turbines in the Pacific Northwest Maury Galbraith.
5/22/20151 Northwest Power & Conservation Council Power Committee Over-generation and Negative Energy Prices – a work in progress Jeff King September 21,
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
Slide 1 Large Wind Integration Challenges for Operations / System Reliability By : Steve Enyeart, BPA With contributions from: Bart McManus, BPA Roy Ellis,
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
Integration of Large-Scale RES in Island Power Systems Prof. Nikos Hatziargyriou, National Technical University of Athens
Wind Turbines and Water Heaters Load Control For Providing Power System Balancing Services Ken Dragoon Renewable Northwest Project PNDRP July 2010.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Sixth Northwest Conservation & Electric Power Plan Discussion of Proposed Generating Resource Action Items Jeff King Northwest Power and Conservation Council.
Ludington Pumped Storage Plant and Wind Power Operational Considerations David Lapinski Consumers Energy Company June 16, 2009.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
Avista’s Flexibility Overview James Gall Senior Power Supply Analyst Contact:
© TIER, Inc. 3TIER a renewable energy information services company Bart Nijssen Chief Information Officer AMS Summer Community Meeting August 11.
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Wholesale Power Price Forecast 01/28/03 Current Trends Update March 11, 2003.
Discussion of Resource Plans Michael Schilmoeller for the Northwest Power and Conservation Council Wednesday, June 10, 2009.
Sixth Northwest Electric Power and Conservation Plan Generating Resource Assessments Jeff King Northwest Power and Conservation Council Portland, OR July.
Preliminary Results with the Regional Portfolio Model Michael Schilmoeller for the Northwest Power and Conservation Council Generation Resource Advisory.
Single Electricity Market Update Liam Ryan SEMO. Background 2 years in operation Gross Mandatory Pool All Suppliers All Generations units over 10 MW Trading.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
Avista Wind Integration Thoughts Clint Kalich, Avista Utilities (509) Wind Integration Forum Technical Workgroup.
1 Mid-Continent Area Power Pool Wind Integration Studies Edward P. Weber August 16, 2007.
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Klondike Wind Power Project, Oregon Donald Furman Senior Vice President - Business Policy and Development December 3, 2009 Energy Bar Association Mid-Year.
HMTF Understanding PLF August 31, 2015 Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Work Group - Chair.
Renewables and System Services Ann Scully.
Ramping and Demand Shifting: A Case Study Tim Mount Dyson School of Applied Economics and Management Cornell University Demand Response.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
1 Open University Integrating Renewables Conference 24 January 2006 Wind power on the grid… What happens when the wind stops blowing? David Milborrow
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
STaR Symposium October 22, 2013 A Realistic View of Renewables Christine Risch.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
Winter Power Supply Adequacy/Reliability Analysis Power Committee Briefing October 17, 2001.
HMTF Update TAS Nov 3-4, 2015 Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Work Group - Chair.
Hawaii Energy Storage Seminar: Utility Regulation Service
Background for Demand Response in PNW Pacific Northwest Demand Response Project May 2, 2007 Ken Corum.
Northwest Wind Integration Action Plan Jeff King Northwest Power & Conservation Council June 27, 2007.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
Pacific Northwest Resource Adequacy Assessment for 2011 and 2013 Resource Adequacy Forum Steering Committee Meeting July 21, 2008.
CEC/CPUC Energy Storage Workshop LADWP Pumped Hydro John R. Dennis LADWP Director Power Planning & Development November 20,
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
High Level Post Processing Cost Estimates MWG SSC Meeting September 26, 2011.
PEAK CAPACITY COST & DEMAND RESPONSE PACIFIC NORTHWEST DEMAND RESPONSE PLANNING COMMITTEE BILL DICKENS TACOMA POWER FEBRUARY 23, 2012.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
© 2016 Portland General Electric. All rights reserved. I NTEGRATED R ESOURCE P LAN 2016 OPUC Meeting April 21, 2016.
Wind Management at MISO
GENESYS Redevelopment Strawman Proposal
Northwest Power and Conservation Council
penetration of wind power
Overview of Northwest Wind Integration Action Plan
Solar Eclipse Overview August 2017
Mid-Continent Area Power Pool
Sandip Sharma ERCOT Manager, Operations Planning
Technical Committee Meeting January 27, 2012
Jim Mcintosh Director, Executive Operations Advisor California ISO
Base on maximum operating wind capacity at end of planning period
Presentation transcript:

Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power and Conservation Council Generating Resource Advisory Committee Meeting Portland, OR October 23, 2008

Power Committee, October 15, Illustration of Hourly Scheduling BPA 7 Jan 08 6:00-7:00 a.m. Balancing Authority action

Power Committee, October 15, Illustration of Regulation and Load Following Load following Regulation

Power Committee, October 15, Illustration of Reserving Capacity on a 400 MW CCCT for Within-hour Balancing

Power Committee, October 15, Capacity for Within-hour Balancing: How much do we need? How much do we have? How do know when to add more? What technologies provide more?

Power Committee, October 15, BPA Wind Integration Team September 10, 2008 Report Part of the 2010 Rate Case Report is “pre-decisional” and “for discussion only” Report is focused on calculating the capacity needed for within-hour balancing during FY –Given projected future load growth, and –Planned wind generation in the BPA Balancing Authority Area (1,424 MW in 2008 increasing to 6,670 MW in 2013) NO statement or assumption regarding the ability of current BPA resources to cover the capacity requirements FCRPS hydro resources currently provide capacity for within-hour balancing

Power Committee, October 15, ,400 MW of UP Capacity Needed by 2012 Load Following is the Bigger Need

Power Committee, October 15, ,000 MW of DOWN Capacity by 2012 Regulation Need is “Flat”

Power Committee, October 15, Wind’s Contribution to DOWN Capacity Overtakes Load’s Contribution in 2010

Power Committee, October 15, Wind’s Contribution to UP and DOWN Capacity as a % of Installed Wind Capacity

Power Committee, October 15, Improved Wind Scheduling Could Significantly Reduce Capacity Required for Load Following

Power Committee, October 15, Summary of BPA WIT Report BPA forecasts a capacity need in 2012 of: –2,500 MW for within-hour UP balancing; and –3,000 MW for within-hour DOWN balancing Likely overstated due to assumption that future scheduling of wind generation will continue to mimic current practice NO statement or assumption regarding the ability of current BPA resources to cover these capacity requirements

Power Committee, October 15, PGE Wind Integration Study Public Presentation September 19, 2008 Study focused on cost of PGE self-integration –PGE does not currently integrate Klondike II or Biglow I Examined integration of 1,100 MW of installed wind capacity in 2014 –~ 26% penetration of system capacity Explicitly estimated the capability of ALL resources available to PGE to provide ancillary services –Some thermal plants would require addition of AGC at “modest” cost –Reflects diminished hydro capacity of Mid-C Contracts in 2014 Cost of PGE Integration: $11.75 per MWh (in 2008$) –Will use for final short list scoring of Renewable RFP

Power Committee, October 15, PGE Resources Available to Provide UP and DOWN Balancing: 972 MW in 2014

Power Committee, October 15, PGE Resources Forecast to Provide UP and DOWN Balancing: 314 MWa in 2014

Power Committee, October 15, Ideal Characteristics for Resources that Provide Capacity for Within-hour Balancing: Operate “on AGC” – Automatic Generation Control, part of the Balancing Authority’s energy management system Operate over a wide range of output levels “Ramp” or change output levels quickly Operate at “near-market” heat rates over operating range

Power Committee, October 15, Avista Wind Integration Study Public Presentation October 21, 2008 Examined integration of up to 600 MW of installed wind capacity (30% penetration of system capacity) Incremental reserves for 600 MW of wind: –11 MW for Regulation –28 MW for Load Following –30 MW for Load Forecast Error –69 MW Total Existing resources used to provide incremental reserves: –Mid Columbia (138 MW, Avista’s share) –Noxon Rapids (554 MW) –Cabinet Gorge (236 MW) –Coyote Springs 2 (280 MW) –Colstrip (222 MW, Avista’s share)

Power Committee, October 15, Avista Wind Integration Study Benefits of Wind Feathering: –Reduces Integration Cost from ~ $10.75/MWh to $8.75/MWh (at 600 MW of Installed Wind) Benefits of Shorter Market Time Step: –Reduces Integration Cost from ~ $8.75/MWh to $3.50/MWh (at 600 MW of Installed Wind) Avista sells ~ 200 MW of capacity for AGC and Spinning Reserves to 3 rd Parties for load and wind balancing

Power Committee, October 15, Issues for the Sixth Power Plan: How much do we need? How much capacity will Balancing Authorities need to set aside for within-hour regulation and load following? –How much is attributable to load growth? –How much is attributable to increased wind generation? –Could better wind forecasting reduce this capacity requirement? –Could a shortened scheduling window reduce this capacity requirement?

Power Committee, October 15, Issues for the Sixth Power Plan: How much do we have? How much capacity for within-hour regulation and load following can be provided from existing resources? –Which resources are currently used for within-hour balancing? –Are there other existing resources that could be used? –Would dynamic scheduling better allocate existing capacity? –How do constraints on hydro system operations impact the availability of capacity for within-hour balancing? –Can demand-side resources provide capacity for within-hour load following? –When is “feathering” wind a good economic choice?

Power Committee, October 15, Issues for the Sixth Power Plan: How do we know when to add more? Is it necessary to add capacity solely for within-hour balancing or is it more appropriate to consider operating flexibility when adding capacity to meet energy or peak demand requirements? –How do the different types of capacity related to one another? Capacity for meeting peak load Capacity for contingency events Capacity for within-hour balancing

Power Committee, October 15, Issues for the Sixth Power Plan: What technologies provide more? Which generation technologies are the best candidates for augmenting system capacity for within-hour regulation and load following? –Combined-cycle combustion turbines with duct-firing Adding duct-firing to existing CCCT –Simple-cycle combustion turbines Frame units (e.g., GE 7F) Aeroderivative units (e.g., LM6000) Hybrid units (e.g., GE LMS100) –Internal combustion reciprocating engines (gas-fired) –Pumped storage hydro –Other storage resources

Power Committee, October 15, Perfect Schedule?