Basics of the Oil, Gas & Petrochemical Industries.

Slides:



Advertisements
Similar presentations
Anaerobic Digestion PAK RENEWABLE ENERGY
Advertisements

Generic Pressurized Water Reactor (PWR): Safety Systems Overview
HVAC523 Heat Sources.
Antero Punttila Analyzing most typical energy saving measures Energy Efficiency of Steam and Condensate Systems Antero Punttila, Motiva Oy.
Waste Management System in Egypt Owner (Generator) Regulator RWM Operator Justification Minimization Segregation Transportati on Treatment Conditioning.
ENGINES, TRANSMISSIONS, FINAL DRIVES, TRAVEL/SWING MOTORS & HYDRAULICS: IMPROVE LIFE BY 2X TO 3X STRATEGIES TO INCREASE LIFE OF COMPONENTS AND EQUIPMENT.
Drew Hevle. NACE Houston Section Principal Corrosion Engineer
Michael Hopkins Assistant Chief, Permitting Ohio EPA Air Permitting for Oil & Gas Well Sites.
Oil and Gas Industry Presentation Activities, GHG Emission Sources, and Potential Reductions January 14, 2009.
August 2014 Rational for the Acquisition of Stimsol Business from Arcan Resources Ltd and the Creation of BlendForce Energy Services Inc. Fortaleza Energy.
SAGD ELift Applications
Process Intensification: An Offshore Oil & Gas Industry Perspective Heriot-Watt, June 3 rd 2004 Mike SWIDZINSKI Technology Team Leader - NSBU.
December 2010 Your Natural Microbial Service Provider Efficiency and Cost-Effectiveness.
Chilled Water, Hot Water, Heat Pump and Glycol Loops
§ Planned Maintenance, Startup, and Shutdown (MSS) at Oil and Gas Handling and Production Facilities.
CNG Refuelling station. A company located in Cherasco (Italy), is among the world leaders in the field of designing and manufacturing of components and.
Flowtech 856/2, G.I.D.C. INDL. ESTATE, MAKARPURA ROAD, BARODA – , PHONE : , TELEFAX :
Understanding Shale Gas Development From drilling to end user…..
Hydraulics.
Black Powder Removal from Transmission Pipelines Diagnostic & Solutions Lindsay McRae – Pall Australia Kaustubh P Chitale – Pall India.
Lubrication is the lifeblood of industry Protect your priceless assets … … AMP UP TODAY! Lubrication of the future … today! AMP Advanced Maintenance Program.
ZF-100 The Paraffin & Asphaltene Solution. ZF-100 The Paraffin & Asphaltene Solution 72% Biodegradable, environmentally friendly ZF-100 is an aggressive.
WELCOME TO HADI H AL-HAMMAM GROUP
SK Engineering & Projects Ltd
Principles of Liquid Flow through Pipelines
Removing Scale from Water Treatment Plants Using SRZ-1 from TopDuck Products.
History PSI-WS7 has its origins 20 years ago in the Western Canadian Sedimentary Basin. This development was a new approach to dealing with the heavy.
Defining the Upstream Oil and Gas Sector: Exploration, Production, and Natural Gas Gathering and Processing Western Climate Initiative – Oil & Gas Collaborative.
National Iranian Oil Company
ACADs (08-006) Covered Keywords Air compressors, aftercooler, afterfilter, moisture separator airflow. Description Supporting Material
Contaminant Control: a New Approach David Burns Scientific Process Solutions a division of Perry Equipment Corporation.
Facilities Management and Design Chapter 5 Water and Wastewater systems.
World Sales Meeting Application
Book 2: Chapter 1 Introduction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand commodities.
CHAPTER 4 CPB 20004: Plant Utility n Maintenance
P H S A U T O M I V E ALS Lubrication.
HEAT EXCHANGER.
INTRODUCTION Definition:
- applications in Plastic Injection Molding. Your experience !!! - References / Customers / Products - What parts are to be cleaned? - Which kind.
Power Industry Opportunities. Energy Source Nuclear Gas turbine Coal fired Oil & gas fired Biomass Wind Solar Fuel Cell Tidal power.
Corrosion Protection Program MRO INDUSTRIAL. Cortec Spray Technologies MRO INDUSTRIAL.
Coverings Systems Range Arma-Chek. Covering Systems 2 Main target: provide UV protection and increase the insulation life expectancy reduce risk of CUI.
VpCI™ Packaging Solutions VpCI Metalworking Products World Sales Meeting 2009.
Clark Reliance Corporation Strongsville, OH. Fuel Gas Treatment.
VpCI™ Packaging Solutions Rock Star Environmental Benefits World Sales Meeting 2009.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Facilities Engineering *1 st draft By: Saha. Development options ProposalDevelopment OptionEstimated Cost (Mil) A FPSO converted to Tanker Hull 300 kbo.
LESSON THIRTEEN LUBRICATING OIL SYSTEM. 1.PRIMARY PURPOSE OF LUBRICATION To keep a clean layer of lubricating oil film / luboil film between the contacting.
Lynsay Bensman 06 October 2009 Errors in Sampling/Monitoring in an Internal Corrosion Program NACE Eastern Area Conference.
Facilities Management and Design Chapter 7 HVAC Systems.
Wood Group – an overview A global market leader in: - services for the oil & gas and power generation markets - deepwater engineering - enhancement.
§ Planned Maintenance, Startup, and Shutdown (MSS) at Oil and Gas Handling and Production Facilities.
1 IMPLEMENTATION OF OIL AND GAS UPSTREAM PROJECT IN MAXIMO.
KSP Industrial Group Ltd. Engineering & Manufacturing WHCP, Dosing Pump, CIP & LBV, PLC & Gearbox
MOTOR OIL By Tom Riis and Zane. History Motor oil is petroleum based lubricant used in internal combustion engines. Motor oil works by creating a separating.
What are Oilfield Chemicals? Oilfield chemicals are those which are used in oilfields to increase the process efficiency, productivity of the oil and.
INDUSTRIAL HYDRAULICS
Top Quality Desuperheater Manufactured by Maniks
Chemical additive solutions to overcome challenges and create value
Subsea 100 Global Services Products Presentation
Water and Soil Corrosion
World Sales Meeting Application
PRODUCTS (POWER PLANT)
Basics of the Oil, Gas & Petrochemical Industries
Meitler Consulting Inc
Power Industry Opportunities
Treatment of Produced Fluids: Crude Oil and Water:
ANUGRAH NUGI PRATAMA Kantor : Gudang :
Pneumatic System Conditioning
Presentation transcript:

Basics of the Oil, Gas & Petrochemical Industries

Cortec corrosion inhibitors for both upstream & downstream Corrosion inhibitors UpstreamDrillingProductionPipelinesDownstreamRefineryPetrochemical 2

Opportunities-Two Markets Product/Process –Drilling –Transmission –Separation –Storage –Refining –Water Treatment Facilities/Capital Equipment –Rigs –Pipelines –Tanks –Process equipment –Structures –Inventory FORM ALLIANCES

Hot Topics – Production/Process Black Powder –Solid contaminant –Cause a range of problems Product contamination Erosion wear in compressors Clogging of instrument and filter equipment Contamination for product consumer –Erosion and sealing problems for valves, and flow reduction

Hot Topics – Production/Process Top of Line & Bottom of Line protection –TOL | Corrosive gas such as H2S –BOL | Water –Mixed phase Three-phase –One product injected at well head –Provide protection to water, oil and gas as they come out of the separation process

Hot Topics – Production/Process EcoFlow System –Mature fields > 10% water content –Drag reducer/flow enhancer –Protection Scale Micro-bacterial activity Corrosion

Products – Production/Process Corrosorber Liquid – H 2 S scavenger S7 – Oxygen Scavenger S16 – De-foaming agent VpCI-647 – Water treatment (scale/corrosion) VpCI 637GLE –Black Powder –TOL & BOL corrosion

Products – Production/Process MaterialOil Wells Oil Flow Lines and Gathering Systems Hydraulic Pumping Equipemnt Gas Wells Gas Wells Flow Lines Gas Handling Equipment, Vessels Water Handling and Injection VpCI-629x xx VpCI-629 Bio x VpCI-637 x x VpCI-637 GL x xxx VpCI 637 GLE x xxx VpCI-639xxxxx VpCI-705 Bio x VpCI-705 x

Eco Flow System Operator/owners face loss of revenue in mature fields due to decreased operating flow due to corrosion caused in part by increased water injection Cortec CPS Eco Flow System provides a solution

Eco Flow System Two part system –Part A Protects against scale, corrosion and micro- bacterial growth –Part B Drag reducer/flow enhancer To be effective flow line must have >10% water content

Eco Flow System

Facilities – Capital Equipment Equipment –Manufacture –Shipping & storage –Inventory –Onsite –Operation –Maintenance –Lay-up

Facilities – Capital Equipment Structures –Construction –Operation –Maintenance –Lay-up

Facilities – Capital Equipment Pumps/Turbines/Compressors –Lay-up, shipping, on site and inventory Fog flow path with VpCI 337 Add M529 to oil or fog VpCI 322 into lubrication system Place emitters in all control panels/junction boxes Clean external surfaces with VpCI 416 Coat all exposed machined surfaces with VpCI 391 Wrap with VpCI 126 or Milcorr

Facilities – Capital Equipment Pumps/Turbines/Compressors –Operation M529 in operating oil Emitters in control panels/junction boxes Depending on type of system, additive to flow path of pump or compressor Boilers & HRSG –Lay-up, shipping, on site and inventory Assembled units: Fog waterside and fireside with VpCI 337

Facilities – Capital Equipment Boilers & HRSG –Lay-up, shipping, on site and inventory Tube and header assemblies –Fog ID with VpCI 337 –Spray OD with VpCI 337 –Wrap with either VpCI 126 film or Milcorr Loose parts: Set up inventory management program –Operation Add VpCI water treatment products Need alliance with water treatment company

Facilities – Capital Equipment Gearboxes –Lay-up, shipping, on site and inventory Add M529 to oil or fog oil system with VpCI 322 Clean external surfaces with VpCI 416 Coat all exposed machined surfaces with VpCI 391 Wrap with VpCI 126 or Milcorr –Operation Add M529 to oil

Facilities – Capital Equipment Vessels –Lay-up, shipping, on site Depending on service –Fog VpCI 337 –VpCI 705 –Install Tyvek pouches Motors –Lay-up, shipping, on site and inventory Spray with VpCI 239 Wrap with VpCI 126 or Milcorr with Tyvek pouches

Facilities – Capital Equipment Structures –MCI –Emitters –Coatings

Facilities – Capital Equipment Maintenance –Plant or rig piping systems (piping, pumps, valves, condensers and heat exchangers) Clean with rust remover and neutralize with cleaner Depending on system add one of the applicable VpCI additives –External rust Clean with rust remover and neutralize with cleaner Coat with temporary or permanent coating

Facilities – Capital Equipment Hydro-test –M645 + S7 Pre-mix S7 so that you do not get a sludge or a pile of powder left in vessel –VpCI 649 –Ecoline 3220

Summary Areas of Opportunity –Process Additives Black Powder TOL & BOL Three-phase split –Treatment of process fluids; Rigs and Tank farm –Eco Flow –Fire Protection System

Summary Areas of Opportunity –Plant cooling water systems –Warehouse inventory –Maintenance –Coatings –MCI in concrete coating for subsea pipe

QUESTIONS

Thank you for attending and participating Jim Holden, PE Technical Sales Manager Cortec Corporation